Stocks/KGS

KGS

Kodiak Gas Services, Inc.v3 7.0/10 · 2026-11-08
Energy·Oil & Gas Equipment & Services
$42.53
$4.1B market cap
2.4% div yield
v3 Rating
7.0/106.0–8.0
Setup
8.0/107.0–9.0
Fair Value
$50.00$34.00–$70.00+18%
DCF (10%)
$49.00+15%
Base IRR
+17%+0%–+32%
Visibility
moderate±36%
Wall Street
$67.70 target(10 analysts last quarter)(11 buy)
Rating
Revenue (TTM)
$1.5B
Owner Earnings
$670M
Next-Yr Owner Earnings
-$20M
Growth
+11.0% × 8y
P / Next-Yr OE
--
Net Debt
$2.8B

Kodiak Gas Services, Inc. (KGS) serves the United States' oil and gas sector by furnishing critical contract compression infrastructure to its clients. The company's business activities are structured into two main divisions: Compression Operations and Other Services. Through its Compression Operations segment, KGS manages both its own and customer-owned compression equipment, which is instrumental in enabling the extraction, collection, and transport of natural gas and oil. The Other Services segment delivers a spectrum of contractual support, including the construction of new facilities, comprehensive maintenance and major repair work, and various additional support offerings billed based on time and materials. Founded in 2010 and headquartered in Montgomery, Texas, the entity originally traded as Frontier TopCo, Inc. Kodiak Gas Services, Inc. presently functions as a subsidiary of Frontier Topco Partnership, L.P.

2-Year Price History

$38.93+13.4%
$30$40$50$60$70volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-08

Rating
7.06.0–8.0
Setup
8.07.0–9.0
Fair value (USD)
50.0034.00 – 70.00
Upside vs 42.53
+18%
DCF (10%)
49.0033.00 – 72.00+15%
Base IRR
17%0% – 32%
Visibility
moderaterange ±36%
Sentiment
4/10
2026-11-08 · · priced at 41.67

Kodiak is the largest US contract gas compressor (4.4M revenue-generating HP, 98.2% utilization, 70% segment gross margins, the highest average HP per unit in the industry) that bolted on a distributed-power platform in April 2026 and told the market it would own 2 GW of behind-the-meter generation by 2030. The stock went from $37 to $77 on that story in six months and has now halved back to $41.67 (last close 2026-11-06; the pack's price-history series ends at $38.93 on 11-05, so quotes are moving fast): Abbott froze ERCOT data-center interconnections in August and extended the freeze to all TCEQ data-center permits (including off-grid/behind-the-meter) in September, and on 11-03 Texans elected Gina Hinojosa, who campaigned on keeping data-center approvals paused until the legislature acts. Jefferies pulled FY27 power accretion and cut its target to $53; Mizuho cut to $72. What is left is a good business at a fair-to-cheap price: ~$4.21B cap, ~$2.75B net debt, ~$6.96B EV against 2026 guided adjusted EBITDA of $830-860M (8.2x) and guided discretionary cash flow of $570-600M (~14% of the market cap), with 2027 consensus EBITDA ~$1.01B (~6.9x). Crucially the compression core alone — ~$770-820M of EBITDA growing high single digits on 150k HP/yr of fully contracted deliveries and 200-week engine lead times, with Archrock's Q3 confirming a structurally tight market — is worth roughly today's price at peer multiples, so you are getting the power platform (1.8 GW of equipment secured, a signed 76 MW six-year behind-the-meter contract with an investment-grade hyperscaler offtake, ~half the existing 405 MW fleet contracted) close to free. The risk is not the business, it is the funding shape: $2.5B of equipment purchase commitments ($588M inside 12 months) against power assets that are not yet all contracted, in the one state whose permitting is frozen, while leverage climbs from 3.1x to the mid-3s. Rating 7.0 — a sound, cash-generative, category-leading infrastructure operator whose speculative premium has been wrung out, trading at a multiple that pays you for the core and gives you a 2 GW option; not a 9 because the bet needs the power build to contract on schedule and the balance sheet to carry it, and the sponsor-style euphoria of June may not be replaced by value buyers until the FCF shows up. Research rating 8.0: the one question that decides this (does the Texas freeze actually bite behind-the-meter gas gen, and what are the real per-MW contract economics) is answerable with work, and if the answer is benign the stock is a $65-75 name within a year.

A deep dive would have to establish: Does Texas's data-center permitting freeze (TCEQ halt, ERCOT audit, Hinojosa's promised extension) actually block behind-the-meter gas generation, and what do the signed 76 MW and commissioning contracts imply for real per-MW economics against the $2.5B of equipment purchase commitments?

Owner earnings, TTM
$670M$590M – $745M
Realistic peak profit
$1.1B$800M – $1.4B
Growth rate
11.0%4.0% – 16.0%
Years of growth
84 – 12
Market cap
$4.2B$4.1B – $4.3B
EV
$7.0B$6.7B – $7.3B
Net debt
$2.8B$2.6B – $2.9B
Capital return / cap
21500.0%19000.0% – 26500.0%
P/E
8.7×7.0× – 11.0×
EV/EBITDA
8.2×7.8× – 8.7×
FCF yield
13.0%10.0% – 15.0%
Projected FCF, base case (USD millions)
Y1-$20M-$200M – $150M
Y2$195M$0M – $350M
Y3$345M$100M – $550M
Y4$510M$200M – $750M
Y5$700M$300M – $1.0B
Competition: Clear #1 in US contract compression on average horsepower, utilization and margin versus Archrock and USA Compression, but a crowded and much shallower field in distributed power (VoltaGrid, ProPetro/PROPWR, Atlas, Caterpillar dealers, hyperscaler self-supply).
Governance: No serious issues: sponsor fully exited, capital return disciplined; minor flags are the long-running Texas sales-and-use-tax audits ($65.8M liability, 2015-2025 periods open), equity issued near the June highs, and routine 10b5-1 CEO selling.
Research (expand)

What it does

Kodiak Gas Services (NYSE: KGS, HQ Montgomery, TX) rents and operates natural-gas compression under long-term contracts, almost entirely in the Permian and South Texas after exiting Mexico, Argentina, Canada, Chile and Romania in 2024-25. Three segments: Compression Infrastructure (4.4M revenue-generating HP, 991 avg HP/unit — the largest in the industry, 98.2% utilization, $23.80/HP/month, +4.5% y/y, 70.0% adjusted gross margin), Power Infrastructure (405 MW of recips/turbines, created by the April 2026 ~$675M Distributed Power Solutions acquisition, Q2 revenue $33M at 64.5% margin), and Other Services (station construction, maintenance, T&M; Q2 revenue +47%). Q2 2026: revenue $391.1M (+21%), record adjusted EBITDA $216.8M (+21.7%), adjusted EPS $0.55, discretionary cash flow $163.3M (+40%). 101.1M shares out (10-Q cover, 8/3/26) after an $836M-net primary equity raise in May.

The investment case

Two businesses at one price. The compression core is genuinely excellent: engine lead times run ~200 weeks, so supply cannot respond; Kodiak has secured 2027/28/29 packages and is already 50% contracted on 2027 deliveries; 150k HP/yr of adds take the fleet to 5.2M HP by 2030; AI/telemetry-driven condition-based maintenance has pushed gross margin from the mid-60s to 70% through a lube-oil cost spike. Archrock's Q3 2026 (EBITDA $228M, best bookings since 2Q23, "structurally tight") confirms it is the market, not just Kodiak. On top sits an option: 1.8 GW of generation equipment secured (≈2/3 turbines via a multi-year Baker Hughes framework with locked pricing at ~$1.2M/MW, ~$1.5M/MW with balance of plant), a target of 2 GW by 2030 at 15%+ unlevered IRRs, ~5x build multiples and 10-15 year contracts. That option is being marked near zero today.

Why it is cheap. Abbott directed a PUC/ERCOT audit and interconnection pause on 8/3/26, then on 9/21/26 ordered TCEQ to halt *all* data-center permits — including off-grid and behind-the-meter — through mid-December. On 11/03 Gina Hinojosa won the governorship having promised to keep approvals paused until the 90th Legislature (convenes 1/12/27) acts; she is sworn in 1/19/27. Kodiak's pipeline is Texas-centric. Jefferies cut its target to $53 and removed FY27 power accretion; Mizuho cut to $72 on a back-weighted deployment schedule. The stock is -46% from the June high and fell 17% in the week of the election.

What it earns today (real, unlevered owner earnings)

FY26 guided adjusted EBITDA $830-860M; take $850M. Subtract SBC (~$29M annualized, H1 was $14.5M — a real cost add-backed in adjusted EBITDA), maintenance capex ~$80M (Q2 $19.9M), and cash taxes (today near zero — Kodiak's own DCF guide of $570-600M = EBITDA less ~$185M cash interest less ~$80M maintenance capex implies essentially no cash tax, thanks to bonus depreciation on a $700M+/yr capex program; I normalize ~$70M). That is ~$670M of unlevered owner earnings, i.e. 79% of EBITDA reaches owners before interest — a high conversion, because overhauls and parts are already expensed inside that 70% gross margin and capital maintenance is genuinely light on long-lived iron. Against a ~$6.96B EV that is 10.4x EV/owner earnings, 8.2x EV/2026 EBITDA, ~6.9x EV/2027 consensus EBITDA ($1.01B). Take off ~$185M of cash interest and the equity earns ~$485M, ~11.5% on a $4.21B market cap; on the company's discretionary-cash-flow definition it is ~14%. The $2.04/yr dividend (raised 4.1% on 11/04 to $0.51/q) yields 4.9% and is covered 2.8-3x.

Caveat to respect: D&A is ~$370M/yr against $80M of maintenance capex. I believe the gap is real (25-year book lives on 40-year iron, overhauls in COGS), but it is the single biggest judgement in this write-up — if true maintenance is $150M+, owner earnings are ~$600M and the multiple is 11.6x.

Projected free cash flow (unlevered, after SBC and after the reinvestment the growth needs)

This is a heavy-capex build, so near-term FCF is suppressed by design:

  • 2027: EBITDA ~$970M; less SBC $32M, cash tax $15M, maintenance $95M, growth capex ~$850M (compression $300M + power ~$550M as 400 MW lands, back-end loaded) → ~-$20M
  • 2028: EBITDA ~$1,180M; growth capex ~$800M → ~$195M
  • 2029: EBITDA ~$1,350M; growth capex ~$750M → ~$345M
  • 2030: EBITDA ~$1,500M; growth capex ~$650M → ~$510M
  • 2031: EBITDA ~$1,600M; growth capex tapering to ~$350M as the 2 GW / 5.2M HP targets are met → ~$700M

Funding: ~$4.5B of capex over five years vs ~$2.1B of retained cash after interest and dividends; the ~$2.4B gap goes on the balance sheet, taking net debt to roughly $5B against $1.6B of EBITDA (~3.2x) — inside their 3.5-4.0x target but only if the EBITDA shows up. If power slips two years while equipment arrives, leverage spikes against idle iron. That is the bear case, and it is a real one given $2.5B of purchase commitments with $588M due inside twelve months.

What it is in five years

A contracted energy-infrastructure company: ~5.2M HP of compression on multi-year contracts in the lowest-cost US gas basin feeding LNG, plus ~2 GW of behind-the-meter generation on 6-15 year contracts with investment-grade-backed offtakes. Growing ~5-7% with very durable, utility-like cash flows — a 14-18x FCF category. I use 15x on ~$700M of 2031 FCF = ~$10.5B terminal EV (a conservative 6.6x 2031 EBITDA vs the 8.25x Mizuho applies to peers today). Confidence in the *direction* is high (compression is contracted and supply-constrained); confidence in the *power magnitude* is moderate — one 76 MW contract and one commissioning deal do not make 2 GW.

Fair value

DCF at 10%: PV of 2027-31 FCF ~$1.19B + PV of terminal ~$6.52B = ~$7.71B EV, less $2.75B net debt = ~$4.96B equity = ~$49/share. Cross-check: 2029 EBITDA $1.35B at 8x, less ~$3.5B net debt = ~$71/share in three years, ~19%/yr from here — which is roughly where the sell side is ($79.18 average target, 13 of 15 buys, range $53-93). Downside cross-check: compression + other alone (~$820M of 2027 EBITDA) at 8x less today's net debt = ~$38/share, before any credit for $700M+ already spent on power equipment. So the market is paying for the core and almost nothing for the option. Fair value $50, slightly above the DCF for that free option and the chance a strategic or infrastructure fund takes a run at a 2 GW contracted platform, tempered for leverage and Texas regulatory risk. Base IRR ~17%.

Setup note: implied vol is rich (ATM Dec calls ~38%) against a business with contracted revenue and a 4.9% dividend — this is a reasonable buy-write candidate if you want to own it defensively, but covering the whole position caps the exact re-rate you are buying.

Management, risks, competition

McKee/Griggs have delivered on what they said: international exit in under 18 months, leverage to the promised 3.5x and then 3.1x, margin from mid-60s to 70%, ERP on time and under budget, $33M to terminate operating leases on 43k contracted HP at under 6x (a genuinely good trade), and purchase-leaseback buy-ins at discounts to replacement cost. Capital return is deliberate: dividend grows, buyback opportunistic (they supported EQT's exit), and they have been honest that DCF is no longer the dividend anchor while power capex runs. Marks against: they issued equity at ~$65-70 in May and the CEO has been selling under a 10b5-1 plan (2,666 shares at ~$45 on 11/03 — immaterial size); and the Texas sales-and-use-tax saga (liability $102.3M at 12/31/25, $65.8M at 6/30/26, 2015-2025 periods still open) is a controls blemish, not fraud.

Risks, ranked: (1) Texas permitting freeze persisting under Hinojosa pushes the power ramp from 2027 into 2028-29 while committed equipment arrives; (2) leverage rising to ~3.2-3.5x on uncontracted assets, with the possibility of another equity raise at a depressed price; (3) power is a far shallower moat than compression — VoltaGrid, ProPetro/PROPWR, Atlas, Caterpillar dealers, and hyperscalers self-supplying all chase the same megawatts, and Griggs' "we will be a consolidator" is ambition, not position; (4) Permian gas growth stalling if oil breaks down; (5) lube oil / engine cost inflation. Competition in compression is Archrock and USA Compression, and Kodiak wins on average HP, utilization and margin.

Sentiment: 4/10

Not capitulation, but the air has gone out. Six months ago this was an AI-power momentum name at $77; it is now a -46% broken chart in the middle of a general AI-complex derating, with the marginal seller being growth money that bought the 2 GW slide. The sponsor overhang is gone (Frontier TopCo/EQT 39.8% → 0% by December 2025) — a structural positive — and FMR has cut 11.1% → 4.1% through 2026, another large holder largely out. Short interest ~7.8M shares (~7.7% of the float, 4.4 days to cover) is elevated but not crowded. The sell side is still loudly bullish (avg target $79.18), which is the one thing that stops me calling this blood on the ground: the estimates have not been cut to the bone yet, and the 11/09 Q3 print plus the promised year-end power contract are the near-term tells. The constructive read is that we are past the elation and into disillusion while the underlying compression business keeps setting records — which is where you want to be buying a durable asset, just not at the absolute bottom tick.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM202520242023
Revenue1472+15%1308+13%1159+36%850
Gross profit600+12%552+25%441+39%317
Operating expenses117-24%137-28%191+164%72.5
▸Adj EBITDA779+19%691+36%510+19%427
▸Adj OCF613+29%488+26%389+37%283
CapEx-597-315-337-220
Adj FCF16.1-88%173+234%51.8-18%63.1
Interest expense195198197223
▸Adj net income230+59%183+597%26.3+303%6.53
▸Owner's earnings300------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2025 +2026YTD

Where the Cash WentTotal2026YTD202520242023
▸Claimed: EBITDA2115100%553100%588100%533100%441100%
FCF (OCF−capex)1447%-177-32%28448%-8.97-2%46.511%
Net income29214%14126%80.514%49.99%20.15%
▸Capital returned47222%-715-129%45678%21240%518118%
Buybacks-692-83610440.10.00
Dividends50814316013472.1
Interest paid764146198197223
Debt paid down-108-168-5.76-159224
▸Reinvestment206298%1153208%29750%36869%24455%
Capex (PP&E)1417544315337220
Intangibles & M&A5775760.000.66-0.03
Leases signed (net Δ)69.332.7-18.630.724.6
Retained / other-140-7%10819%26.55%-24.8-5%-249-57%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 72 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM202520242023
▸Assets (total)5613431844353244
▸Liabilities (total)3414311130622101
Net debt (incl. leases)275340.626481820
Net debt / Adj EBITDA3.530.065.194.26
Net debt / Adj FCF1710.2451.128.9
Adj EBITDA / interest3.993.482.591.92
Shares outstanding10190.289.277.4
Dilution (YoY)+15.2%+1.1%+15.3%--
Employees130013001300781
MarginsTTM202520242023
Gross margin40.7%-0.842.2%+4.238.0%+0.837.2%
Adj EBITDA margin52.9%+2.152.8%+8.844.0%-6.250.2%
Adj OCF margin41.7%+4.737.3%+3.833.5%+0.333.3%
Adj FCF margin1.1%-9.713.2%+8.74.5%-3.07.4%
Net income margin11.3%+5.46.2%+1.94.3%+1.92.4%
Adj NI margin15.7%+4.414.0%+11.72.3%+1.50.8%
ROIC (adj, after-tax)7.1%23.7%4.1%5.3%
Cost of debt25.9%9.9%8.1%10.8%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Contract Services$1.6B+7%
Service, Other$38.8M-5%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-07

Kodiak Gas Services delivered another strong quarter, with management emphasizing robust natural-gas compression demand, growing data-center power needs, and the company’s expanding role in behind-the-meter generation. Second-quarter revenue was $391 million, up 21% year over year, while adjusted EBITDA reached a record $217 million, a 22% increase. Adjusted net income was $54 million, or $0.55 per diluted share. The board declared a $0.49 per-share dividend, which remained covered by more than three times quarterly discretionary cash flow. Compression Infrastructure continued to perform exceptionally well. Revenue increased 7% year over year and 3% sequentially, with revenue-generating horsepower rising by approximately 24,000 to 4.4 million horsepower. Fleet utilization reached an industry-leading 98.2%, while average horsepower per revenue-generating unit rose to 991. Pricing increased 4.5% year over year to $23.80 per ending revenue-generating horsepower, reflecting successful recontracting and tight market conditions. Adjusted gross margin was 70%, up 170 basis points year over year and marking a second consecutive quarter at or above that level. Results absorbed substantial lube-oil inflation, which management mitigated through supplier relationships, scale, predictive maintenance, artificial intelligence, machine learning, training, and improved labor productivity. Kodiak has secured large-horsepower packages for 2027-2029 deliveries and is already 50% contracted for 2027 deliveries. Power Infrastructure, established through the DPS acquisition, generated $33 million of revenue and a 64.5% adjusted gross margin from a 405 MW fleet. Management expects margins to expand as distributed-power operations are integrated with Kodiak’s compression platform, particularly because many power assets use Caterpillar engines familiar to Kodiak technicians. Existing power assets were approximately 90% utilized, contracts continued to be extended, and a commissioning contract received a rate increase. Kodiak expects approximately 50 MW of new gensets in the second half of 2026. The company is building a substantial power platform for data centers and other customers. A Baker Hughes agreement provides 1 GW of turbine power by 2030, with an option for up to 1.8 GW. Including other purchases, Kodiak has secured approximately 1.8 GW of generation capacity, roughly 66% turbines, toward a 2 GW 2030 target. Management expects the final mix to be approximately 75% turbines and 25% reciprocating engines. Kodiak is also developing technician training, including Baker Hughes turbine programs and expanded Waukesha certifications. The commercial pipeline is growing quickly and now significantly exceeds secured capacity. Kodiak added about 2 GW of prospective projects in one month while removing lower-quality or slower opportunities. It signed a limited notice to proceed for detailed engineering on a West Texas data center whose capacity is leased to a hyperscaler, received an initial equipment-reservation deposit, and is targeting a long-term contract before year-end. The project could begin equipment installation in early 2027 and scale beyond an initial sub-100 MW deployment. Other opportunities range from mobile commissioning projects of several hundred megawatts to permanent behind-the-meter systems scaling toward 1 GW. Customers include hyperscalers, data-center developers, and powered-land developers, as well as Permian oil and gas customers pursuing microgrids. Kodiak’s screening criteria focus on counterparty credit quality and evidence that a data center has secured a tenant and can contract quickly. Preliminary power contracts generally span 10-15 years, with some seven- or eight-year possibilities. Management continues to target five-year paybacks and unlevered returns above 15%. Balance-of-plant costs, including transformers, switchgear, SCR systems, and potentially batteries, are expected to bring total costs to roughly $1.5 million per MW, plus or minus, compared with approximately $1.2 million per MW for raw generation equipment. Financially, net debt ended the quarter at approximately $2.6 billion, with leverage at a company-low 3.1x following the May equity offering, which raised $836 million after expenses. Kodiak raised 2026 adjusted EBITDA guidance to $830 million-$860 million, compression adjusted gross margin guidance to 69%-70.5%, and discretionary cash flow guidance to $570 million-$600 million. Compression growth CapEx was increased to $280 million-$300 million, partly reflecting the purchase of 43,000 horsepower previously under operating leases. Power CapEx was reduced to $400 million-$450 million because equipment costs, timing, and Baker Hughes payment terms are now more certain. Management remains willing to pursue additional compression purchase-leasebacks, power tuck-in acquisitions, third-party equipment operating contracts, and growth beyond the 2 GW target, but intends first to establish a strong operating foundation for the new power business.

Analyst Q&A (25)
▸
What differentiates Kodiak from peers pursuing behind-the-meter data-center power, and what milestones should investors expect before the targeted year-end contract?
Elias Jossen · JPMorgan
Kodiak differentiates itself through DPS’s engineering and commercial capabilities combined with Kodiak’s rotating-equipment operating expertise, balance sheet, and execution capabilities. The West Texas project is in detailed engineering, with equipment installation potentially beginning in Q1 2027; management hopes to provide a firmer contract update before year-end.
▸
How is Kodiak mitigating lube-oil cost headwinds and able to raise its compression-margin guidance?
Elias Jossen · JPMorgan
Operational AI, machine learning, training, predictive maintenance, and higher labor productivity are reducing equipment failures and maintenance costs. Long-term supplier relationships and scale also provide favorable lube-oil pricing, helping offset market price increases.
▸
How will the 1.8 GW of secured power equipment be delivered from 2027 through 2030?
James Rollyson · Raymond James
Kodiak expects approximately 50 MW of power gensets late in 2026 and roughly 400 MW of additional power deliveries in each of 2027-2030. The 2027 deliveries will be back-end loaded because the first large Baker Hughes turbines arrive in early Q4, after which deliveries should normalize.
▸
What balance-of-plant requirements are expected for data-center projects, and how will they affect total capital needs and returns?
James Rollyson · Raymond James
Standard balance-of-plant costs include transformers, switchgear, and SCR emissions systems, bringing total costs to roughly $1.5 million-$1.6 million per MW, plus additional costs if battery backup is required. Kodiak expects to incorporate these costs into project pricing and returns.
▸
Beyond the recently announced lease buyout, is Kodiak seeing further opportunities to acquire compression equipment from E&P or midstream customers and other owners?
Neal Dingmann · William Blair
Kodiak converted operating leases covering 43,000 horsepower into owned assets at an attractive cost using its lower-cost capital. Additional purchase-leaseback opportunities are under discussion and could be pursued opportunistically, though none is necessarily imminent.
▸
How should investors think about capital allocation among power CapEx, debt repayment, dividend growth, and potential opportunistic buybacks?
Neal Dingmann · William Blair
Power growth CapEx and balance-sheet management will take priority, while the dividend is intended to remain attractive and grow over time. Share repurchases remain possible when opportunistic, especially with lower leverage, but Kodiak will first fund its power build-out.
▸
What criteria does Kodiak use to high-grade its power pipeline, and what trade-offs determine whether projects are advanced or deprioritized?
Theresa Chen · Barclays
Kodiak prioritizes counterparty creditworthiness and the likelihood that a data center has secured a tenant and can move quickly toward contracting. The company avoids speculative projects that could consume resources without a realistic path to execution.
▸
Have expected project economics changed as customer discussions and designs have advanced, and what contractual duration and terms are emerging?
Theresa Chen · Barclays
Management continues to target approximately five-year paybacks and unlevered IRRs above 15%, with economics varying by contract duration and customer type. Preliminary discussions generally involve 10-15 year contracts, although some opportunities could support seven- or eight-year terms.
▸
What is the expected size range of current power projects, where does Kodiak have the greatest advantage, and will the secured gigawatt be deployed through a few large deals or many smaller contracts?
Douglas Irwin · Citi
The pipeline spans sub-100 MW projects, several-hundred-megawatt mobile commissioning arrangements, and permanent behind-the-meter projects that could scale to 1 GW. The initial West Texas project is smaller because near-term fleet availability is limited; all projects are evaluated for long-term commitments and strong counterparties.
▸
What demand is Kodiak seeing for longer-duration compression contracts, and can it continue extending the term of its fleet?
Douglas Irwin · Citi
Kodiak would welcome longer compression contracts and is discussing them with customers. Contract duration depends on customer preferences: some want shorter terms for flexibility, while attractive customers and locations can support longer commitments.
▸
What can Kodiak disclose about the West Texas data-center developer and the developer’s commitment from the underlying hyperscaler?
Jacqueline Koletas · Goldman Sachs
Kodiak is not yet disclosing the specific counterparty structure. Management is focused on ensuring the counterparty is creditworthy and that the risk assumed is appropriate for the project’s size.
▸
How does the increasingly visible long-term compression spending outlook affect equipment procurement and pricing leverage on contract extensions?
Jacqueline Koletas · Goldman Sachs
Compression equipment deliveries remain nearly 200 weeks out, requiring Kodiak to plan three to five years ahead. Long-term visibility into Permian gas growth, vendor relationships, and packager capacity are helping secure equipment and support future contracting.
▸
Is the reduction in power CapEx driven solely by Baker Hughes down payments, and have expected all-in costs including balance of plant increased from prior estimates?
Alex Overmeer · Jefferies
The lower power CapEx outlook reflects improved certainty regarding equipment purchases, delivery timing, and pricing, as well as favorable payment terms under the Baker Hughes agreement. Management believes all-in costs remain near $1.5 million per MW including balance of plant, with raw power around $1.2 million per MW, broadly unchanged from prior expectations.
▸
What is Kodiak’s view of the new Texas moratorium on data-center grid connections, and what feedback has it received from customers?
Alex Overmeer · Jefferies
Management views the Texas data-center interconnection moratorium positively because it should distinguish credible projects from speculative ones and increase demand for behind-the-meter solutions. Early customer feedback indicates that such solutions will be important to future data-center development.
▸
How are Kodiak’s power discussions progressing in markets outside data centers?
Derrick Whitfield · Texas Capital
Beyond data centers, Kodiak is pursuing microgrid opportunities in the Permian with oil and gas customers. The combination of reciprocating engines and turbines gives Kodiak flexibility as power constraints increase.
▸
Under what circumstances would Kodiak accelerate compression fleet growth to meet pipeline and customer demand in the Permian?
Derrick Whitfield · Texas Capital
Kodiak would consider accelerating compression growth if it could secure equipment, balance-sheet capacity, and attractive customer opportunities. Near-term equipment availability is constrained by long lead times, but purchase-leasebacks or other customer-led structures could enable incremental growth. Management believes leverage capacity remains available within its target range.
▸
Will the West Texas data center ultimately connect to the grid, or is it expected to rely permanently on primary behind-the-meter generation?
Derek Podhaizer · Piper Sandler
The West Texas project, like many opportunities, could ultimately use a mix of grid and behind-the-meter power. Some customers prefer fully behind-the-meter solutions, and the Texas interconnection moratorium could shift more projects toward that model.
▸
How will Kodiak develop turbine technicians and use Baker Hughes expertise as its fleet becomes more heavily weighted toward turbines?
Derek Podhaizer · Piper Sandler
Kodiak plans a partnership approach with Baker Hughes, including in-house turbine training and technician development. The company will begin building its turbine curriculum before deliveries start so qualified personnel are ready to operate and maintain the equipment.
▸
Can Kodiak exceed 2 GW of power capacity by 2030, and would it consider additional distributed-power acquisitions?
Elvira Scotto · RBC Capital Markets
Kodiak has balance-sheet capacity to exceed the 2 GW target, but its immediate focus is establishing a strong operational foundation. Over time, the company expects to build a competitive moat and could pursue tuck-in acquisitions involving technology, services, capabilities, or additional capacity; management expects Kodiak eventually to be a consolidator.
▸
Absent the lube-oil headwind, where might compression margins have been, and how much further could they rise?
Elvira Scotto · RBC Capital Markets
Lube-oil costs are approximately $1.5 million higher per month than at the beginning of the year, or about $18 million annualized. In a normalized cost environment, compression margins would therefore be roughly $18 million higher on an annualized basis, all else equal.
▸
How should investors view the current engine-versus-turbine mix relative to Kodiak’s long-term target, and what are customers saying about the two technologies?
James Larkin · Bank of America
Kodiak continues to target a power mix of approximately 75% turbines and 25% reciprocating engines by 2030, with Baker Hughes and Solar supplying much of the turbine capacity. Customers are currently largely technology-agnostic because speed to power is the primary consideration.
▸
Can Kodiak operate power equipment purchased by data-center developers outside its 2 GW owned-fleet target?
James Larkin · Bank of America
Yes. Data-center developers that have purchased their own equipment may need help installing it and, more importantly, operating and maintaining it. Kodiak is discussing opportunities to operate third-party equipment alongside its own fleet.
▸
Will Kodiak provide gas infrastructure and fuel procurement for distributed-power projects, or will those responsibilities remain with data-center customers?
Sunil Sibal · Seaport Global Securities
Most near-term customers have already procured and arranged fuel infrastructure, so Kodiak is not currently responsible for sourcing gas on the projects under consideration. However, Kodiak has the in-house expertise and partner relationships to provide fuel procurement if customers require it in the future.
▸
How important is balance of plant to prospective customers, how readily can Kodiak procure items such as batteries and switchgear, and can the potential EBITDA uplift be quantified?
Sebastian Erskine · Rothschild & Company, Redburn
Every project will require some baseline balance of plant, including transformers, switchgear, and SCR emissions equipment. Kodiak has begun procuring these items and batteries, using a supply-chain strategy focused on securing long-lead components in advance. Lead times range from roughly four months to 18-24 months, but project-specific EBITDA upside is difficult to quantify.
▸
What is the mix of prospective customers in the power pipeline, including hyperscalers, powered-land developers, and data-center builders?
Sebastian Erskine · Rothschild & Company, Redburn
Kodiak is communicating directly with hyperscalers, data-center developers, and powered-land developers. It evaluates each opportunity based on project maturity, counterparty quality, and contracting progress, and currently sees a diversified mix across all three customer categories.

SEC Filing Findings

SEC Filing — material findings

2026-08-07 · depth 9/10
risk 6Hidden Liability
▸

Sales tax contingency: Texas Comptroller audits; liability $65.8M at 6/30/26 (down from $102.3M after Q1 2026 settlement). Remaining Texas audit exposure and 2015-2025 audit periods still open; sales tax liability in accrued liabilities $69.6M.

“As of June 30, 2026 and December 31, 2025, the Company’s associated liability was $ 65.8 million and $ 102.3 million, respectively, relating solely to the Texas portion of sales and use tax.”
risk 6Purchase Commitments / Capital Commitments
▸

Purchase commitments for compression and power equipment of $2.5B, of which $587.9M due within twelve months; includes Baker Hughes power generation arrangement; off-balance-sheet commitments not in the summary.

“As of June 30, 2026, these commitments amounted to $ 2.5 billion, of which $ 587.9 million is expected to be settled within the next twelve months.”

Options

Chain Snapshot (daily)

Call IV (ATM)38%
Put IV (ATM)112%
ATM Spread5.6%
Call $OI (near money)$356K
Put $OI (near money)$1.8M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$47.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$37.50$4.60/$6.800$1.50/$2.250
$40.00$3.30/$4.700$2.05/$4.001,109
$42.50$2.25/$3.500$3.00/$4.9014
$45.00$1.25/$3.700$5.20/$6.70289
$47.50$0.80/$3.400$6.40/$8.800
$50.00$0.60/$3.1049$9.20/$10.800
$52.50$0.40/$2.35511$10.80/$13.101
$55.00--/$2.6565$13.10/$15.300
Snapshot: 2026-11-04

Short Interest

Short % of Float10.2%
Short Shares6.6M
Days to Cover3.8
Change (vs Prior)-15.4%
Short % Float History
10.20%+2.10pp
6.0%8.0%10.0%12.0%14.0%10-1512-3103-1305-2908-1410-30

Web Traffic

kodiakgas.com
Web rank#840,756
Est. visits/mo624K
Web Rank History
#840,756-78,501
rankest. visits/mo
840k860k880k900k920k599K606K613K620K627K07-1408-0402-09

Executive Compensation (2023.0-2025.0)

Direct Pay$49.8M
Incentive & Other$17.0M
Total Compensation$66.8M
% of Revenue1.7%

Cash Runway

29.5months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$1.14B$43.04+$217M+$836M—$6.70T
Invesco Ltd.$605M$31.89−$9.5M+$240M—$1.26T
VANGUARD CAPITAL MANAGEMENT LLCPassive$329M$60.85+$49.6M+$329M—$4.68T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$310M$67.26+$165M+$310M—$2.22T
STATE STREET CORPPassive$310M$40.97+$52.1M+$210M—$3.38T
FMR LLC$306M$32.11−$36.9M−$243M—$2.30T
PRICE T ROWE ASSOCIATES INC /MD/$228M$43.28+$74.0M+$119M—$999.12B
AMERICAN CENTURY COMPANIES INC$222M$42.46+$37.7M+$99.7M—$225.72B
Zimmer Partners, LP$190M$31.32+$11.2M−$132M—$4.23B
DIMENSIONAL FUND ADVISORS LPPassive$190M$36.64−$43.7M+$26.3M—$551.30B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

011.7M23.4M35.1M46.9M$14$29$45$60$752023-062024-032024-122025-092026-06
hover the chart for per-quarter detailprice (right axis)
EQT Fund Management S.a r.l.—Invesco Ltd.8.1MFMR LLC4.1MPRICE T ROWE ASSOCIATES INC /MD/3.0MAMERICAN CENTURY COMPANIES INC2.9MZimmer Partners, LP2.5MWELLINGTON MANAGEMENT GROUP LLP2.4MTWO SIGMA INVESTMENTS, LP2.1MGOLDMAN SACHS GROUP INC1.7MCITADEL ADVISORS LLC1.2M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
DTMDT Midstream, Inc.387.42×
TRGPTarga Resources Corp.334.97×
LNGCheniere Energy, Inc.323.71×
VSTVistra Corp.321.85×
KMIKinder Morgan, Inc.320.27×
WMBThe Williams Companies, Inc.419.03×
ETEnergy Transfer LP317.06×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (10 analysts)$67.70+65.2%
Last Year (26 analysts)$72.08+75.9%
Current Price$40.98
Analyst Ratings
11
Buy: 11Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2023 Q2199M106M-13M$-0.14$-0.14 – $-0.131
2023 Q3208M111M18M$0.19$0.18 – $0.191
2023 Q4225M125M28M$0.29$0.18 – $0.412
2024 Q1221M135M35M$0.37$0.33 – $0.423
2024 Q2311M193M53M$0.55$0.34 – $0.834
2024 Q3317M173M34M$0.35$0.24 – $0.516
2024 Q4324M174M39M$0.38$0.37 – $0.392
2025 Q1326M171M39M$0.39$0.34 – $0.432
2025 Q2333M175M46M$0.45$0.36 – $0.534
2025 Q3327M191M51M$0.49$0.41 – $0.573
2025 Q4331M190M50M$0.49$0.45 – $0.553
2026 Q1340M191M55M$0.53$0.44 – $0.604
2026 Q2386M222M69M$0.67$0.54 – $0.815
2026 Q3387M208M63M$0.62$0.58 – $0.655
2026 Q4386M214M65M$0.64$0.58 – $0.706
2027 Q1410M216M65M$0.64$0.58 – $0.684
2027 Q2423M220M66M$0.64$0.63 – $0.661
2027 Q3431M228M70M$0.68$0.67 – $0.701
2027 Q4438M228M68M$0.67$0.66 – $0.681
2028 Q1455M235M72M$0.70$0.69 – $0.712
2028 Q2475M247M79M$0.77$0.76 – $0.792
2028 Q3490M254M82M$0.80$0.79 – $0.822
2028 Q4503M261M85M$0.83$0.82 – $0.852

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$1.17M
6 txns · 5 insiders · 23,578 sh
Sells ($, 12mo)
$5.79M
21 txns · 5 insiders · 99,927 sh
Major holders (≥10% beneficial owners)
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$335.54M
1 txn · 1 insider · 9,762,573 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-11-12BUYHolloway Gretchen Lynndirector1,145$43.63$50K$990K
2026-11-11BUYDarden Alexander Newsomdirector10,000$44.99$450K$771K
2026-11-11SELLLenamon William Chadofficer: Executive Vice President & COO1,000$44.20$44K$3.68M
2026-11-11BUYMontana Margaret Cdirector1,000$44.26$44K$1.31M
2026-11-03SELLMcKee Robert Michaeldirector, officer: President & CEO2,666$45.55$121K$13.08M
2026-10-12SELLLenamon William Chadofficer: Executive Vice President & COO1,000$53.25$53K$4.49M
2026-10-05SELLMcKee Robert Michaeldirector, officer: President & CEO2,666$53.95$144K$15.64M
2026-09-16SELLBuhigas Pedro R.officer: Chief Information Officer3,663$58.14$213K$1.88M
2026-09-14SELLHamilton Ewan Williamofficer: EVP & Chief Accounting Officer2,729$61.85$169K$1.65M
2026-09-11SELLLenamon William Chadofficer: Executive Vice President & COO1,000$63.21$63K$5.39M
2026-09-01SELLMcKee Robert Michaeldirector, officer: President & CEO5,999$59.31$356K$17.35M
2026-08-19SELLMcKee Robert Michaeldirector, officer: President & CEO6,008$62.39$375K$18.63M
2026-08-11SELLLenamon William Chadofficer: Executive Vice President & COO1,000$61.93$62K$5.34M
2026-07-13SELLLenamon William Chadofficer: Executive Vice President & COO1,000$67.79$68K$5.92M
2026-07-08SELLRoclawski Cory Anneofficer: EVP & CHRO4,169$68.36$285K$1.69M
2026-06-17SELLBuhigas Pedro R.officer: Chief Information Officer4,625$67.78$313K$2.61M
2026-06-16SELLHamilton Ewan Williamofficer: EVP & Chief Accounting Officer2,729$68.62$187K$2.17M
2026-06-11SELLLenamon William Chadofficer: Executive Vice President & COO1,000$67.79$68K$6.16M
2026-03-19SELLBuhigas Pedro R.officer: Chief Information Officer13,942$55.73$777K$2.38M
2026-03-17SELLHamilton Ewan Williamofficer: EVP & Chief Accounting Officer5,797$56.18$326K$1.93M
v2 analysis (legacy, 2026-08-11) — for comparison onlyclick to expand

Thesis

Kodiak owns an attractive, difficult-to-replicate large-horsepower compression fleet operating at roughly 98% utilization in a supply-constrained market. Pricing, contract extensions and long equipment lead times support a strong core business. The newer Power Infrastructure segment offers substantial upside from Texas grid constraints and data-center demand, but much of the value remains prospective: the pipeline exceeds secured capacity, the West Texas project is not yet finally contracted, and the platform requires roughly $1.5M-$1.6M per MW of all-in capital. The near-term financial picture is consequently mixed. EBITDA and adjusted OCF are strong, but FCF is thin after CapEx, the company has diluted shareholders materially, and current reported net debt of approximately $2.6B leaves the equity exposed if deployment or customer contracting disappoints. The Mexico payments investigation is an additional governance and valuation risk. The likely path is continued compression strength, gradual power monetization and improving cash flow, with a wide outcome range depending on whether power becomes a contracted infrastructure franchise or an expensive growth treadmill.

Trade Signal

Trade rating
-5.8/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-11 · saw $60.64-29.9% since

Short KGS because a strong but capital-intensive compression business is being valued as though the largely prospective power platform is already contracted and delivering, with fair value materially below the current market price.

Temporary mispricing-3.0

The stock advanced from roughly $41.60 in January to $76.27 in late June as investors embraced the DPS acquisition, the 2 GW power target, Texas data-center demand and repeated guidance increases. It then fell about 24% from the June high to $56.86 by August 6, likely reflecting profit-taking, dilution/capital intensity concerns and de-risking of the still-uncontracted power pipeline rather than a collapse in compression fundamentals. After the August 7 earnings release, record EBITDA and higher guidance drove an 8% rebound to about $61. This post-earnings move was fundamentally understandable, but the price still appears to have overshot the durable earnings evidence: the market is rewarding prospective power value faster than contracts and free cash flow can validate it. The dislocation is more likely a gradual valuation correction than an immediate panic unwind.

Market view+5.0

The prevailing view is strongly bullish: analysts rate the shares Buy, passive holders have increased positions, and the narrative centers on a scarce compression fleet plus a potentially large data-center power franchise. Bulls point to 98% utilization, pricing gains, supply-chain constraints and Texas grid bottlenecks. Bears focus on valuation, 15% dilution, leverage, negative FCF, execution risk on roughly $1.5M/MW power capex and the unresolved Mexico investigation. The market is not ignoring the risks, but appears to be assigning substantial value to prospective power growth before it is contracted. Short interest of 11.7% is meaningful but not extreme, and declining short interest suggests some bearish positioning has already covered.

Inflectionwindow ~4mo+2.0

The business has a genuine positive inflection through Kodiak Power Solutions and data-center demand, but the market already understands and largely pays for it. Consensus is constructive, with an average one-year target of $65.94 and no sell ratings, while the stock has already risen 89% over one year. The next major upside step requires signed, profitable projects rather than additional pipeline announcements; near-term earnings growth is therefore more confirmation than an unexpected re-rating trigger.

Catalysts
  • ▲2026-11 · Q3 2026 earnings and updated full-year guidance — A continued 98%+ compression utilization rate or further EBITDA guidance increases could support the premium; evidence of weak cash conversion or capex pressure would undermine it.
  • ▲Late 2026 · West Texas data-center project long-term contract — Management is targeting a final contract before year-end; signing with a credible hyperscaler would convert part of the power pipeline from narrative into contracted value.
  • ▼H2 2026–2027 · Mexico compliance investigation update — DOJ, SEC or OFAC action could create penalties, legal costs or reputational damage, although timing and outcome remain uncertain.
  • ▲2027 · 2027 power and compression deployment milestones — Successful delivery of secured turbines and engines, plus contracted projects with targeted returns, would validate the power-platform thesis.
  • ▼2026-2027 · Capital-spending and financing updates — The roughly $1.5M–$1.6M/MW all-in power investment requirement creates execution, leverage and potential dilution risk if projects are delayed or returns disappoint.
Flow-5.0

Flow is negative overall. The May equity offering raised $836M and TTM dilution is reported at 15%; further power investment may require additional equity or debt. Officers and directors sold substantially more than they bought, and a major holder sold about $1.0B over the past year. Passive ownership and 11.7% short interest can provide technical support or squeeze fuel, but they do not offset the structural share-supply risk.

Floor / Ceiling-3.5

There is no hard floor near the current price. The compression fleet and contracted cash flows provide asset value, but net debt of roughly $2.6B, negative reported FCF, high growth capex and the unproven power build-out leave equity exposed to a meaningful de-rating. Above the current price, the large May equity offering, insider/holder selling and already-optimistic consensus create a meaningful ceiling, though not a mechanical one.

Buyability

A real, investable growth story: compression is highly utilized and Texas behind-the-meter power demand is credible, so infrastructure and energy investors can readily buy the stock. However, at roughly 8.3x TTM EV/EBITDA, negative FCF and substantial growth capital needs, the next buyer must underwrite successful power execution rather than simply buy a cheap cash-flow asset.

Fear vs Greedfear 7/10 (-2.0)greed 8/10 (+3.0)

Fear pulls harder than greed at $61: the operating business is good, but the market is capitalizing a large portion of the aspirational power opportunity before final contracts, returns and durable free cash flow are demonstrated. The main reason not to be aggressively short is that strong execution or a hyperscaler contract could sustain the premium and create a squeeze.

Valuation

Our Target
$3.5B-16%
Market Should Pay
$3.0B-28%
target ×0.85 (fear discount)
Current Market Cap
$4.1BSlightly bearish
What Changed
transcript · 2026-08-07
+8%fair value on this information

Q2 delivered record adjusted EBITDA of approximately $217M and management raised 2026 EBITDA, compression-margin and discretionary-cash-flow guidance. Compression pricing and utilization remained exceptionally strong, while Power Infrastructure contributed $33M of revenue at a 64.5% adjusted gross margin. New prospective power projects and the West Texas limited notice to proceed add commercial evidence, but there is still no final hyperscaler-backed contract. The lower power CapEx outlook and May equity raise also provide more balance-sheet visibility, although net debt remains about $2.6B.

▸ How the cases moved

The strong Q2 result and higher full-year guidance raise the base case from roughly $4,600M to $5,000M and its probability from 0.48 to 0.50; the bull case rises from roughly $8,200M to $9,000M and its probability from 0.23 to 0.25 as power capacity, demand and compression pricing become more tangible. The bear case remains near $450M, but its probability declines from 0.29 to 0.25 because utilization, pricing and leverage improved. The probability shift is funded mainly by reducing bear probability rather than assuming the entire pipeline is already valuable.

2-Year Plausible Outcomes
bear25%
$450M
rev -3%/yrOE $75M

Compression remains operationally solid but pricing and utilization normalize, while the power build-out consumes capital before achieving adequate contracted returns. The data-center pipeline produces delays rather than meaningful EBITDA, leverage remains elevated, and the Mexico compliance investigation results in material costs or reputational damage. The company is valued as a capital-intensive contract-services business at a depressed multiple.

▸ Valuation

5x $650M EBITDA = $3,250M EV − $2,800M net debt = $450M equity

base50%
$5.0B
rev +8%/yrOE $350M

Compression remains tight, with high utilization and modest price increases, while Power Infrastructure scales gradually from its acquired base. Kodiak secures several long-term projects but does not fully monetize the aspirational 2 GW platform within two years. Cash generation improves after the current investment spike, though growth CapEx, interest expense, dilution and compliance uncertainty limit the equity multiple.

▸ Valuation

8x $900M EBITDA = $7,200M EV − $2,200M net debt = $5,000M equity

bull25%
$9.0B
rev +20%/yrOE $750M

Compression pricing and utilization remain near peak levels and the power platform converts its pipeline into contracted hyperscaler and industrial projects. Kodiak deploys secured turbines and engines on attractive long-duration contracts, achieves its targeted returns, and demonstrates that Power Infrastructure is a scalable infrastructure franchise rather than an acquisition-driven capital sink. EBITDA and owner earnings compound while leverage falls, supporting a premium multiple.

▸ Valuation

10x $1,100M EBITDA = $11,000M EV − $2,000M net debt = $9,000M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is $3,890M. I set the analytical target at $3,500M, below the model, because the arithmetic does not fully capture execution risk in the unproven power platform, substantial capital requirements, shareholder dilution, the unresolved Mexico compliance investigation and the gap between adjusted EBITDA and durable free cash flow. The core compression franchise deserves meaningful value, but I do not capitalize the full 2 GW opportunity before contracts and returns are demonstrated.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now7/10
Trajectory8/10
Risk7/10
Governance4/10
Insolvency prob (2yr)4%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Rebranding and Completion of the DPS Acquisition: On April 1, 2026, Kodiak Gas Services (KGS) completed its acquisition of Distributed Power Solutions (DPS), which has been rebranded as "Kodiak Power Solutions". The $587 million cash-and-stock transaction adds approximately 395 MW of distributed, behind-the-meter power generation capacity. The acquisition diversifies KGS's customer base into high-growth end markets, with contracted capacity weighted toward data centers (67%), microgrids (21%), and manufacturing (12%).
  • Record Q1 2026 Earnings & Guidance Increase: On May 11, 2026, KGS reported record Q1 2026 Contract Services segment revenues of $307.0 million (up 6.2% y/y) and record Adjusted EBITDA of $190.1 million. The Contract Services gross margin percentage was 48.2% (70.6% adjusted). Driven by the addition of the new power segment, KGS raised its full-year 2026 Adjusted EBITDA guidance to a range of $820 million to $860 million (up from $750 million to $780 million).
  • Power Capacity Procurement Expansion: KGS announced it has secured an additional 260+ MW of power generation capacity to support its newly acquired power division, taking delivery of 61 MW in 2026 and the remainder between 2027 and 2029. KGS outlines a growth target of adding 300 to 500 MW of capacity annually through 2030.
  • Permian Compression Asset Acquisition: In late March 2026, KGS acquired over 20,000 horsepower (HP) of large-horsepower compression assets in the Permian Basin for $24 million. The assets are contracted under a seven-year service agreement expected to generate more than $7 million in incremental annualized revenues.
  • $1 Billion Unsecured Notes Offering: To optimize its capital structure, KGS successfully issued $1 billion of senior unsecured notes in Q1 2026, enhancing liquidity and reducing its weighted average borrowing rate.
▸ Thesis-test Findings
Kodiak Gas Services DOJ SEC Mexico investigation updates 2026

In late 2025, KGS disclosed that it had uncovered potential compliance issues under U.S. law regarding certain payments made to local government officials in Mexico. These payments commenced prior to KGS's acquisition of CSI Compressco LP in April 2024 and likely benefited cartels designated as Specially Designated Global Terrorists (SDGTs) to protect employees and ensure access to work sites. KGS sold its Mexican operations on September 30, 2025, and proactively self-reported the findings of its internal investigation to the DOJ, SEC, and OFAC. As of mid-2026, there are no updates regarding official enforcement actions, penalties, or resolutions. However, legal defense and white-collar compliance experts are closely monitoring KGS, as this represents a high-profile "test case" of voluntary self-disclosure under updated DOJ guidelines that prioritize prosecuting material support to transnational criminal organizations and cartels.

Texas Permian Basin data center power capacity contracts

The demand for behind-the-meter, gas-fired power generation in the Permian Basin is accelerating rapidly, bolstering KGS's bull case for Kodiak Power Solutions. Grid interconnection queues in Texas have reached a severe bottleneck, with ERCOT tracking over 418 GW of large-load connection requests (nearly 89% from data centers). To manage this, the Public Utility Commission of Texas (PUCT) approved a new "Batch Zero" framework in June 2026 to weed out speculative projects, creating an incentive for data centers to bypass the utility queue entirely using onsite generation. In June 2026, Circe Energy secured a massive 2 GW natural gas supply agreement with Cummins for a West Texas AI campus, bypassing traditional grid interconnection. Additionally, Chevron and Microsoft confirmed ongoing negotiations for a 2.5 GW to 5 GW data center in West Texas powered by in-basin gas. This macroeconomic trend directly validates KGS's pivot into localized, highly reliable natural gas-fired generation.

Archrock USA Compression large horsepower contract rates 2026

Data from peer companies confirms a highly favorable, tight pricing environment for large-horsepower contract compression, supporting a strong fundamental bull case. In its Q1 2026 earnings call, USA Compression Partners (USAC) reported that it had contracted over 90% of its 2026 horsepower and pushed average pricing to an all-time high of $22.73 per horsepower per month (an 8% year-over-year increase). Meanwhile, Archrock reported a strong 95% fleet utilization rate and 72% contract operations adjusted gross margins in Q1 2026. Crucially, both competitors highlighted that supply-chain constraints remain severe; lead times for the most desirable Caterpillar 3600-series engines have tripled from 50 weeks to approximately 150–160 weeks. These prolonged lead times prevent market oversupply and sustain high barriers to entry, enabling established fleet operators like KGS to command premium, leading-edge pricing.