Stocks/VST

VST

Vistra Corp.v3 5.8/10 · 2026-10-16
Utilities·Independent Power Producers
$122.65
$41.6B market cap
0.6% div yield
v3 Rating
5.8/104.8–6.8
Setup
6.0/105.0–7.0
Fair Value
$175.00$120.00–$240.00+43%
DCF (10%)
$171.00+39%
Base IRR
+11%+4%–+17%
Visibility
moderate±34%
Wall Street
$191.23 target(13 analysts last quarter)(22 buy, 3 hold)
Rating
Revenue (TTM)
$17.4B
Owner Earnings
$4.2B
Next-Yr Owner Earnings
$3.8B
Growth
+7.0% × 5y
P / Next-Yr OE
10.8x
Net Debt
$24.0B

Vistra Corp., along with its various holdings, functions as a unified entity primarily engaged in retail electricity supply and power generation. The company organizes its operations across six distinct segments: Retail, Texas, East, West, Sunset, and Asset Closure. It directly provides electricity and natural gas to residential, commercial, and industrial clients throughout 20 U.S. states and the District of Columbia. Beyond its retail endeavors, Vistra also participates in generating electricity, facilitating wholesale energy transactions, managing commodity-related risks, producing fuel, and overseeing fuel logistics. With approximately 4.3 million customers, Vistra commands an impressive generation capacity of about 38,700 megawatts. This capacity is sustained by a diverse portfolio of facilities, including those powered by natural gas, nuclear energy, coal, solar, and advanced battery energy storage systems. The enterprise, initially known as Vistra Energy Corp., adopted its current name, Vistra Corp., in July 2020. Tracing its origins back to 1882, Vistra Corp. maintains its corporate headquarters in Irving, Texas.

2-Year Price History

$120.29-14.5%
$100$120$140$160$180$200Initial target $175.00 · 2026-10-16volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-16

Rating
5.84.8–6.8
Setup
6.05.0–7.0
Fair value (USD)
175.00120.00 – 240.00
Upside vs 122.65
+43%
DCF (10%)
171.00105.00 – 245.00+39%
Base IRR
11%4% – 17%
Visibility
moderaterange ±34%
Sentiment
6/10
2026-10-16 · claude-opus-5-5 · priced at 154.17

Vistra is the largest US competitive power generator plus Texas' biggest retailer (TXU): ~41 GW of gas, nuclear and coal, 5.5 GW more coming with Cogentrix, nuclear PPAs signed with Amazon (1.2 GW Comanche Peak) and Meta (2.6 GW PJM), and a 30% share-count reduction since 2021. The business is printing records (Q2 adj. EBITDA +31% to $1.77B; 2026 guide $6.8-7.6B EBITDA / $3.9-4.7B FCF-before-growth, tracking at/above midpoint), but the stock (~$154 on Oct 15, the latest close I could confirm; ~30% below its $220 high) has de-rated because ERCOT wholesale prices have collapsed to ~$30/MWh as batteries flatten the evening scarcity hours, the Texas data-center queue is under audit, and the 2027 $7.4-7.8B EBITDA range now trends to the low end before ~$0.7B of Cogentrix + Meta adds. At ~10x EV/EBITDA and ~8% FCF-before-growth yield to common (after ~$190M preferred dividends), my base DCF (10% rate) is ~$171, a ~10-11% base IRR: decent, under the 14% hurdle, with a wide merchant-price range. Rating 5.8: a quality, well-hedged, shareholder-friendly franchise at a fair-to-modestly-cheap price, not a mispricing. Research rating 6.0: the bull case (management's $22-25 FCF/share by 2030, Street targets ~$210-218) needs ERCOT tightening and premium data-center contracts. Both are uncertain, but the Nov 6 Q3 call and its 2027 guide update will show a lot of it.

A deep dive would have to establish: Whether ERCOT forward prices recover once battery build-out slows and data-center load arrives in 2027-28, and at what premium Vistra can contract existing gas and nuclear to hyperscalers, which together decide if 2029-30 FCF/share reaches management's $22-25 or stalls near $15.

Owner earnings, TTM
$4.2B$3.9B – $4.5B
Realistic peak profit
$6.0B$4.5B – $7.5B
Growth rate
7.0%2.0% – 12.0%
Years of growth
53 – 8
Market cap
$52B$51B – $53B
EV
$76B$73B – $80B
Net debt
$24B$22B – $27B
Capital return / cap
3.0%2.0% – 5.0%
P/E
16.0×13.0× – 21.0×
EV/EBITDA
10.3×9.3× – 11.2×
FCF yield
8.0%6.5% – 9.0%
Projected FCF, base case (USD millions)
Y1$3.8B$3.0B – $4.5B
Y2$4.1B$2.9B – $5.0B
Y3$4.5B$2.9B – $5.7B
Y4$4.9B$2.9B – $6.4B
Y5$5.2B$2.8B – $7.0B
Competition: Constellation-Calpine, NRG and Talen compete for the same hyperscaler contracts and capacity revenue, while cheap batteries, solar and new-build gas erode ERCOT scarcity pricing.
Governance: none flagged
Research (expand)

What the company does

Vistra (NYSE: VST, Irving TX) is an integrated power company. Generation: ~41 GW after the Lotus deal (Oct 2025, 2.6 GW gas), made up of ~6.4 GW of nuclear (Comanche Peak in ERCOT, plus Beaver Valley, Perry and Davis-Besse in PJM from Energy Harbor), a large CCGT/peaker gas fleet across ERCOT, PJM, ISO-NE, NYISO and CAISO, residual coal (Martin Lake etc., in the Sunset segment), plus solar and batteries. Retail: ~4.3-5M customers through TXU Energy and other brands, about $2.4B of steady EBITDA a year. That retail book is a natural hedge for Texas generation. Pending: Cogentrix (10 modern gas plants, ~5.5 GW in PJM, ISO-NE and ERCOT) for ~$2.3B cash + ~$1.5B assumed debt + 5M shares at $185. FERC approved it in Aug 2026 and it should close late 2026 (~$730/kW net of tax benefits).

The investment case

1. Load growth meets scarce dispatchable supply. ERCOT and PJM both set record peaks in July 2026 (91 GW / 168 GW). Management sees 4-6%/yr ERCOT and 2-3%/yr PJM load growth through 2030, of which data centers are only ~2 points in ERCOT. New-build costs about $90/MWh against ~$30/MWh ERCOT forwards, so the existing fleet's replacement value sits far above its trading value.

2. Contracted, lower-volatility earnings. 20-yr PPAs with AWS (1.2 GW from Comanche Peak, starting Q4'27 and ramping to 2032) and Meta (2.6 GW of PJM nuclear + 433 MW of uprates, with partial delivery from late 2026 and full by YE27). Management targets ~half of EBITDA from low-volatility sources. The DOE has conditionally committed up to $4.2B in loans for the PJM nuclear uprates and life extensions (Oct 2026), which lowers the capital burden.

3. Downside floors. The 45U nuclear PTC (through 2032) sets a floor under nuclear revenue. PJM capacity cleared at the cap again: $325/MW-day for 2028/29, against an uncapped ~$555. Hedges cover ~100% of 2026, ~94% of 2027 and ~72% of 2028 volumes.

4. Capital return. The share count is down ~30% since Nov 2021 (171M shares retired at ~$38 average), with ~336M shares out as of Aug 3, 2026. About $3B goes to shareholders over 2026-27, $1.2B of authorization remains, and the board is willing to extend it. Investment-grade ratings came from S&P (BBB-) and Fitch. The CEO bought ~$1.2M of stock at ~$135 in August.

5. Optionality. Helix Digital Infrastructure (with KKR, NVIDIA and KIA) gives Vistra a preferred-power-partner channel, with up to $1B committed (above $0.5B only on milestones). There are also Permian peakers (860 MW), co-location in PJM after FERC's June order, and Batch Zero projects in ERCOT.

What it earns today and at maturity

  • 2026: Ongoing Ops adj. EBITDA ~$7.3B (guide midpoint $7.2B, H1 $3.26B). Adj. FCF before growth ~$4.4B, or ~$4.2B after preferred dividends (~$12.5/share). GAAP earnings are noisy because of hedge marks (Q2 GAAP NI $305M after a $472M unrealized loss; H1 NI $1.33B).
  • 2027: midpoint-opportunity range $7.4-7.8B, now trending to the low end because ERCOT forwards fell, plus ~$0.7B from Cogentrix and the Meta premium, giving ~$8.1B pro forma. Management's pre-ERCOT-slump "≈$16 FCFbG/share" 2027 framework is probably ~$15 now.
  • Maturity (2029-30): management says $22-25 FCFbG/share if all cash goes to buybacks. In dollars I see ~$6.0B FCF before growth (range $4.5-7.5B), which needs AWS/Meta full delivery, uprates and some ERCOT recovery. Watch-outs: cash taxes rise as tax attributes are used up, and hedges roll off at lower ERCOT prices.

Fair value and multiples

  • Price $154.17 (Oct 15 close, confirmed against Oct 8 close $156.14 and the ~$153-156 trading range). Shares ~335.6M (10-Q cover, Aug 3), or ~340M after the Cogentrix stock. Market cap ~$51.7B.
  • Net debt at 6/30/26: long-term debt $19.6B + AR financing $0.3B + forward repurchase obligation $0.6B − cash $0.4B ≈ $20.1B. Add the $1.5B junior subordinated notes issued Sept 2026 (partly prefunding Cogentrix), $2.5B of preferred stock (8.0%/7.0%/8.875%), and Cogentrix's ~$3.8B at close. I carry ~$24B of debt-like claims (range $21.5-27B), so EV ≈ $75.7B.
  • EV/EBITDA ~10.3x 2026 and ~9.6x 2027 pro forma. P/FCFbG ~12x, an ~8% FCF-before-growth yield to common. P/E is ~15x Street 2027 EPS (~$10.35, cut from $11.30). Peers: CEG trades richer on its pure nuclear and contract mix, NRG and TLN in a similar ballpark.
  • DCF (10%, equity cash flows after interest, preferred dividends and ~$0.6-1.0B/yr of growth capex): FCF of $3.8B, $4.1B, $4.5B, $4.9B and $5.2B over 2027-31, with 2% terminal growth. PV of the explicit years is ~$16.8B and PV of the terminal value ~$41.2B, so equity ≈ $58B ÷ ~339M shares ≈ $171/share. The base-case IRR from $154 is ~10.5-11%. The range is wide ($105-245) because the terminal value depends on long-run ERCOT and PJM pricing.
  • Fair value ~$175 ($120-240). Street targets are ~$210-218 mean and $248 median, with 16 of 21 analysts at Buy.

Risks and competition

  • ERCOT price structure: batteries (31 GWh) now cover the evening ramp, so scarcity hours are vanishing (on Jul 22 the market cleared at $57 against a prior $400-500 pattern). Forwards near $30/MWh mean open 2028+ Texas gas output earns much less than the 2024-25 bull case assumed. Some offset: battery returns have fallen, which should slow new builds.
  • Policy: the Texas data-center queue audit and SB6 large-load rules may slow contracts. PJM rules are in flux (the capacity collar ends after 2028/29, the Reliability Backstop Procurement, the IRAS proposal with bring-your-own-capacity, co-location tariff compliance). An affordability backlash could cap capacity prices.
  • Leverage: ~3x net debt (incl. preferred) to EBITDA after Cogentrix, layered with junior subordinated notes and preferred. Fine at investment grade, but it amplifies merchant swings.
  • Operating: nuclear outages, Moss Landing battery-fire liabilities, coal closure costs and Asset Closure AROs. Uri litigation largely cleared in March 2026, and the EPA's proposed CCRMU rescission is a tailwind.
  • Competition: Constellation-Calpine (the biggest nuclear and gas fleet), NRG (retail + gas), Talen, and new-build gas, solar and batteries from developers and utilities. Hyperscalers can also self-build or contract with regulated utilities.

How investors feel (5.5/10)

Analysts remain near-unanimous Buys with targets ~40% above the price, but the tape is cooler than that. The stock is down ~15-25% YTD and ~30% from its $220 peak on ERCOT softness. It swings ±6-10% a day on DOE and PJM headlines (+20% from Sep 30 to Oct 7 on the DOE loan, −6% Oct 8). Options price ~51% implied volatility. Short interest is low (~10.5M shares, ~3% of float, 2 days to cover). The CEO buying in August and continued buybacks are supportive. Sentiment has gone from loved AI-power momentum to skeptical-but-owned. The Nov 6 Q3 call, with its 2026/2027 guidance update and possibly Cogentrix closing, is the next decision point.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue17356-20%16730-14%19377+25%15542-13%17837
Gross profit3721-55%2659-65%7693+49%5169+65%3131
Operating expenses2683+63%1683+15%1465+16%1260+4%1207
▸Adj EBITDA4016-58%3992-55%8860+53%5775+46%3957
▸Adj OCF6879+32%5254+8%4879+29%3787+26%2999
CapEx-4034-3430-2209-1676-1301
Adj FCF2845+0%1824-32%2670+26%2111+24%1698
▸Interest expense111611311090749854
▸Adj net income-807-115%-324-107%4395+60%2739+93%1420
▸Owner's earnings2300--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA24065100%6047100%4888100%7189100%4615100%1326100%
FCF (OCF−capex)776532%181030%64013%235433%377782%-816-62%
Net income634226%247441%94419%265937%149332%-1228-93%
▸Capital returned569624%144224%143729%113116%99822%68852%
Buybacks53779170.00126612451949
Dividends1608231306305388378
Interest paid466984511311090749854
Debt paid down-5958-5510.00-1530-1384-2493
▸Reinvestment1423359%252042%342470%530874%166836%131399%
Capex (PP&E)1113625203430220916761301
Intangibles & M&A30650.000.0030650.000.00
Leases signed (net Δ)32.0---6.0034.0-8.0012.0
Retained / other367315%121320%3347%-752-10%352876%-650-49%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 200 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)4502941550377703296632787
▸Liabilities (total)3856636440321872764427869
Net debt (incl. leases)1840319579161761119912881
Net debt / Adj EBITDA4.584.901.831.943.26
Net debt / Adj FCF6.4710.76.065.317.59
Adj EBITDA / interest3.603.538.137.714.63
Shares outstanding336338340351390
Dilution (YoY)-0.9%-0.5%-3.3%-9.8%-16.9%
Employees68506390685048704910
MarginsTTM2025202420232022
Gross margin21.4%-16.215.9%-23.839.7%+6.433.3%+15.717.6%
Adj EBITDA margin23.1%-20.823.9%-21.945.7%+8.637.2%+15.022.2%
Adj OCF margin39.6%+15.731.4%+6.225.2%+0.824.4%+7.616.8%
Adj FCF margin16.4%+3.310.9%-2.913.8%+0.213.6%+4.19.5%
Net income margin15.6%+10.35.6%-8.113.7%+4.19.6%+16.5-6.9%
Adj NI margin-4.7%-28.6-1.9%-24.622.7%+5.117.6%+9.78.0%
ROIC (adj, after-tax)3.0%3.2%21.8%14.6%8.3%
Cost of debt5.5%6.1%6.5%5.6%6.6%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Retail Segment$1.9B-5%
Texas Segment$1.4B+57%
East Segment$1.3B+21%
Revenue From Other Wholesale Contracts$472.0M+35%
By Geography (2026-Q1)
East Segment$2.3B+64%
West Segment$89.0M-43%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-07

Vistra delivered a notably strong second quarter, reporting Adjusted EBITDA of $1.767 billion, more than 30% above the second quarter of 2025. Results benefited from contributions across both generation and retail, highlighting the value of the company’s integrated business model and comprehensive hedging program. Generation EBITDA increased to approximately $994 million from $593 million, driven by favorable hedging, roughly 5% higher average realized prices per MWh, higher PJM capacity revenues, optimized dispatch of flexible gas assets, the Martin Lake Unit 1 restart and contributions from assets acquired from Lotus. Retail EBITDA also improved modestly to approximately $773 million from $756 million. Vistra completed three nuclear refueling outages and 92 gas and coal planned outages ahead of summer, helping the fleet achieve more than 97% commercial availability during recent heat waves. Management reaffirmed 2026 guidance of $6.8 billion–$7.6 billion of Adjusted EBITDA and $3.925 billion–$4.725 billion of adjusted free cash flow before growth. Given first-half performance, management expects to finish at or above the midpoint of both ranges. For 2027, Vistra maintained its $7.4 billion–$7.8 billion EBITDA midpoint opportunity range despite materially lower ERCOT forward curves than those underlying the original framework. Higher PJM prices, hedging and nuclear production tax credit protection partly offset ERCOT weakness, although the current outlook trends toward the lower end of the range. Cogentrix and the premium component of the Meta nuclear PPAs remain excluded; together, they could add approximately $700 million to the 2027 midpoint, subject to transaction closing and other market developments. The company continues to see structural power-demand growth. ERCOT and PJM both reached record summer peak loads in July, and Vistra continues to view annual growth estimates of 4%–6% in ERCOT and 2%–3% in PJM through 2030 as reasonable. While data centers are an important longer-term driver, management emphasized industrial reshoring, electrification, population growth and broader economic expansion. ERCOT’s recent price softness reflects additional supply, battery additions and weather-driven variability rather than a deterioration in long-term fundamentals. Management said battery returns have fallen sharply, which should moderate future battery additions, while expected load growth should eventually tighten the market. Texas data-center audits may pause certain queue reviews for several months, but Vistra does not currently expect meaningful delays to Comanche Peak’s late-2027 target or other projects scheduled for next year. The company supports reducing inflated queues to distinguish viable projects from speculative requests. In PJM, Vistra supports bilateral contracting and incentive-based customer flexibility rather than mandatory bring-your-own-new-capacity requirements. Management also expects FERC’s co-location order to provide greater clarity after PJM and transmission owners submit compliance filings. Vistra announced Helix Digital Infrastructure with KKR, NVIDIA and the Kuwait Investment Authority as a new channel for integrated data-center power and infrastructure solutions. Vistra will commit up to $1 billion, with amounts above $500 million dependent on milestones, and act as preferred power partner while retaining the option to provide existing assets, new build or co-location solutions. Capital allocation remains disciplined: approximately $3 billion is targeted for shareholder returns in 2026–2027, $4.5 billion–$5 billion for growth, and $2 billion–$2.5 billion remains available for further buybacks, growth or debt reduction. Vistra has $1.2 billion of current repurchase authorization and may seek additional authorization if market conditions make buybacks attractive, while continuing toward mid-investment-grade credit ratings.

Analyst Q&A (16)
▸
Asked whether Texas data-center audits, potential delays and the Batch Zero process were creating commercial or counterparty concerns, and whether near-term outlook pressure required additional hedging for 2027–2028.
Constantine · Wells Fargo
Burke said Vistra’s long-term ERCOT load forecast remains 115–120 GW by 2030. The audit may pause reviews for a few months, but Comanche Peak’s planned late-2027 energization is not currently expected to be affected. Vistra supports thinning inflated queues and believes comprehensive hedging protects the nearer-term outlook; 2026 softness is not surprising.
▸
Asked whether long-term contracts should be priced primarily against new-build costs, roughly $90/MWh, or whether clean-energy premiums and speed-to-market could support higher pricing and margins.
Constantine · Wells Fargo
Burke said wholesale ERCOT prices around $30/MWh are insufficient to support new construction, while equipment and EPC costs have risen sharply. Large-load customers are willing to pay premiums for existing generation because it remains cheaper and faster than new build. Vistra expects demand for both existing and new capacity, with pricing dependent on speed, location and customer requirements.
▸
Asked whether Vistra’s preferred structure for data-center deals remains a hybrid of new and existing capacity.
Constantine · Wells Fargo
Burke said Vistra will pursue an all-of-the-above, customer-driven approach, including existing assets, new build, co-location and hybrid solutions. The company will participate where returns meet shareholder thresholds, without adopting a one-size-fits-all structure.
▸
Asked how PJM and ERCOT compare in terms of market tightness, customer discussions and Vistra’s efforts to secure contracts in each market.
Jeremy Tonet · J.P. Morgan
Burke and Stacey Doré said both markets continue to attract strong interest, but ERCOT is currently less tight than PJM and has a different, temporarily paused study process. PJM’s process is more localized and its rules remain in flux. Customer location strategies largely determine market preference, and contractual provisions can manage uncertainty; customers are not waiting for perfect regulatory clarity.
▸
Asked about Vistra’s strategy and level of interest as PJM approaches the Reliability Backstop Procurement, including how the RBP compares with bilateral contracting.
Jeremy Tonet · J.P. Morgan
Burke said Vistra supports bilateral contracting and sees opportunities at suitable sites with willing buyers and sellers. Successful bilateral deals could reduce the amount procured through the RBP. Batteries, peakers and CCGTs may participate in the RBP, but the proposed $555/MW-day cap may not support all projects given higher equipment and construction costs.
▸
Asked how Vistra views the proposed Integrated Resource Adequacy Structure and how the company expects the process to evolve.
Jeremy Tonet · J.P. Morgan
Burke favored incentive-based flexibility, such as faster interconnection, lower wires or capacity costs, or demand-response compensation, rather than mandatory disconnection or forced curtailment. Doré said Vistra opposes bring-your-own-new-capacity mandates, supports recognizing data-center flexibility as a grid resource, and will comment when the proposal is filed. She believes the approach could increase interest in co-location.
▸
Asked how the Helix platform will develop over time, what milestones would trigger additional investment, and how it will interact with Vistra’s existing data-center commercial discussions.
Michael Sullivan · Wolfe Research
Burke described Helix as additive to Vistra’s existing commercial efforts and a way to expand deal evaluation capacity through a simpler, integrated power-and-data-center offering. Vistra can provide existing generation or develop new projects, but participation is optional. The additional $500 million commitment is milestone-dependent, aligning capital with valuable opportunities. KKR’s capital and infrastructure capabilities complement Vistra’s power expertise.
▸
Asked what is driving confidence around the 2026 midpoint or better and whether 2027 developments imply an upward, downward or neutral bias within the midpoint opportunity range.
Michael Sullivan · Wolfe Research
Moldovan said first-half performance gives Vistra confidence it will finish 2026 at or above the guidance midpoint. For 2027, lower ERCOT forward prices are only partly offset by stronger PJM pricing, hedging and nuclear PTC protection, so Vistra currently trends toward the lower end of its range. Cogentrix and the Meta PPA remain excluded and could add about $700 million to the 2027 midpoint, subject to closing and other changes.
▸
Asked whether additional Helix partners are expected and how the platform might raise capital and evolve, including whether it could eventually become a public company.
James West · Melius Research
Moldovan said Helix expects to add investors and substantially expand its capital access. Each transaction may use different financing, including Helix equity, Vistra capital or other sources. Burke added that KKR selected Vistra as preferred power partner, giving Vistra flexibility to provide existing or new power where strategic, while allowing Helix to pursue projects outside Vistra’s capabilities.
▸
Asked whether Governor Abbott’s actions establish a timeline for completing the audit process and clearing or reducing the Texas data-center queue.
James West · Melius Research
Burke clarified that Texas has not imposed a moratorium; rather, there is a pause in communicating certain queue outcomes while PUC and ERCOT conduct audits. The company expects the work to take a few months. Comanche Peak and other projects targeted for next year are not currently expected to face material delays, though near-term projects could be affected. Vistra supports reducing overstated queues to identify viable projects.
▸
Asked how willing Vistra is to increase share repurchases from the $2–$2.5 billion of remaining cash and whether management might seek additional Board authorization beyond the current $1.2 billion.
Carly Davenport · Goldman Sachs
Moldovan said Vistra has $1.2 billion of existing repurchase authorization and expects to exhaust it by the end of 2027. Management and the Board are willing to expand the program if valuation opportunities arise. If additional 2026 authorization is approved, Vistra would seek to preserve at least $1 billion of capacity for 2027, potentially more.
▸
Asked for more detail on updated hedging activity, particularly 2028 exposure and changes in ERCOT versus eastern markets during the quarter.
Carly Davenport · Goldman Sachs
Burke did not provide detailed regional hedge activity. He said PJM strength and ERCOT weakness demonstrate the value of Vistra’s diversified portfolio and comprehensive hedging. ERCOT softness reflects recent weather, substantial battery additions and temporary supply dynamics; non-data-center demand represents roughly 3% of the 5%–6% expected growth, with data centers contributing about 2%. Battery returns have fallen materially, which should slow additions, while future load growth could support prices.
▸
Asked for additional detail on Helix’s project pipeline, including potential megawatts, timing, development progress and return targets relative to Vistra’s internal hurdle rates.
David Arcaro · Morgan Stanley
Doré said Helix was launched recently and is still building its development organization with KKR. Its opportunity set includes Vistra’s existing sites and inbound projects brought by Helix. The platform should simplify multi-party discussions and broaden Vistra’s pipeline. Vistra will apply its established mid-teens return hurdle, while Helix may accept different risk levels and provide economics even when Vistra is not the power provider.
▸
Asked whether Vistra has projects beyond Comanche Peak being developed with partners that may be included in the Texas Batch Zero process.
David Arcaro · Morgan Stanley
Doré said Vistra has multiple projects in Batch Zero baseload, Batch Zero to-be-studied load and the anticipated Batch One process, but would not provide specifics. Management expects already-studied baseload projects to move forward, while to-be-studied projects face more allocation and timing uncertainty. Comanche Peak and Vistra’s projects targeted for next year are not currently expected to be materially delayed.
▸
Asked about the expected timeline and remaining uncertainty for PJM’s co-location process, particularly in light of the proposed IRAS framework.
Rinny Singh · Bank of America
Doré said FERC’s June co-location order clearly requires PJM and transmission owners to accommodate co-located projects and revise tariffs. Compliance filings were due in mid-August, although PJM and transmission owners requested more time. Vistra expects clarity within roughly 30–60 days after FERC determines the extension. The company is optimistic because the order adopted many of its arguments.
▸
Asked whether customers are favoring energy-and-capacity contracts or energy-only arrangements, considering potential bring-your-own-capacity charges and customer flexibility.
Rinny Singh · Bank of America
Doré said customers continue to show strong interest in contracting for both energy and capacity because they need both to operate data centers and want to lock in costs amid rising prices. Vistra has not seen a major shift toward energy-only contracts, although it remains open to customer preferences.

SEC Filing Findings

SEC Filing — material findings

2026-08-10 · depth 9/10
risk 6Hidden Liability
▸

Moss Landing battery fire remediation: EPA ASAOC cost estimate raised to ~$175M (incl. $65M Q2 2026 increase); $85M still unpaid and recorded as current liability; additional litigation, contract settlements and impairments not quantified; Moss Landing 350 MW restart timing uncertain.

“Total costs are currently estimated at approximately $ 175 million, including a $ 65 million increase recorded during the second quarter of 2026 primarily due to an extended remediation timeline and higher cost estimates.”

Options

Chain Snapshot (daily)

Call IV (ATM)15%
Put IV (ATM)116%
ATM Spread0.21%
Call $OI (near money)$7.0M
Put $OI (near money)$128.1M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$140.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$120.00$9.30/$9.80268$7.85/$8.951,846
$125.00$7.00/$7.55101$10.50/$11.654,855
$130.00$5.25/$5.65198$13.35/$14.805,306
$135.00$3.85/$4.35858$17.55/$18.6510,565
$140.00$2.85/$3.151,251$21.50/$22.553,246
$145.00$1.99/$2.301,425$25.70/$26.80738
$150.00$1.43/$1.782,554$30.10/$31.251,664
$155.00$0.95/$1.171,605$34.80/$36.801,739
Snapshot: 2026-11-04

Short Interest

Short % of Float3.3%
Short Shares10.4M
Days to Cover1.9
Change (vs Prior)+4.1%
Short % Float History
3.30%+1.10pp
2.0%2.5%3.0%3.5%4.0%4.5%5.0%10-1512-3103-1305-2908-1410-30

Web Traffic

vistracorp.com
Web rank#876,406
Est. visits/mo613K
Traffic YoY▼ 36.8%
Traffic QoQ (12w)▼ 21.2%
Web Rank History
#876,406+15,133
rankest. visits/mo
200k400k600k800k1.0m303K1.1M2.0M2.8M3.7M05-1908-1811-1702-1605-1808-1711-16

Executive Compensation (2023.0-2025.0)

Direct Pay$135.5M
Incentive & Other$42.1M
Total Compensation$177.6M
% of Revenue0.3%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$4.61B$122.70+$92.7M+$102M—$6.70T
VANGUARD CAPITAL MANAGEMENT LLCPassive$3.39B$150.33−$16K+$3.39B—$4.68T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$2.69B$150.35+$5.9M+$2.69B—$2.22T
STATE STREET CORPPassive$2.67B$73.33+$12.7M+$30.2M—$3.38T
FMR LLC$2.25B$64.63−$261M−$785M—$2.30T
GEODE CAPITAL MANAGEMENT, LLCPassive$1.43B$83.65+$591K−$5.7M—$1.87T
MORGAN STANLEY$1.41B$86.40+$99.0M+$134M—$1.88T
NORGES BANK$922M$116.08+$188M+$161M—$1.00T
UBS Group AG$856M$113.53+$127M+$375M—$627.66B
GOLDMAN SACHS GROUP INC$752M$128.28+$223M+$401M—$953.46B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

016.7M33.3M50.0M66.7M$20$64$108$152$1952021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
FMR LLC14.2MJPMORGAN CHASE & CO3.3MMORGAN STANLEY8.9MMASSACHUSETTS FINANCIAL SERVICES CO /MA/3.2MLONE PINE CAPITAL LLC—NORGES BANK5.8MInvesco Ltd.3.7MUBS Group AG5.4MGOLDMAN SACHS GROUP INC4.7MBANK OF AMERICA CORP /DE/3.0M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
AALAmerican Airlines Group Inc.338.24×
TLNTalen Energy Corporation1128.05×
NRGNRG Energy, Inc.625.50×
NINiSource Inc321.85×
KGSKodiak Gas Services, Inc.321.85×
DTMDT Midstream, Inc.319.12×
CEGConstellation Energy Corporation718.30×
GDSGDS Holdings Limited318.00×
UALUnited Airlines Holdings, Inc.517.00×
NCLHNorwegian Cruise Line Holdings Ltd.317.00×
CIFRCipher Mining Inc.316.10×
MGMMGM Resorts International316.10×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (13 analysts)$191.23+54.4%
Last Year (38 analysts)$213.24+72.1%
Current Price$123.87
Analyst Ratings
22
3
Buy: 22Hold: 3Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2017 Q11.3B373M72M$0.07$0.06 – $0.0917
2017 Q21.5B198M-67M$0.18$0.14 – $0.2213
2017 Q31.6B544M239M$0.34$0.27 – $0.4111
2017 Q41.2B-388M-684M$0.26$0.21 – $0.3114
2018 Q1140M-1.8B-2.1B$0.87$0.70 – $1.0513
2018 Q23.5B785M136M$0.34$0.27 – $0.417
2018 Q34.7B1.2B432M$1.14$0.91 – $1.3716
2018 Q43.5B40M-459M$1.23$0.99 – $1.487
2019 Q12.6B803M208M$0.24$0.18 – $0.293
2019 Q22.5B793M246M$0.26$0.20 – $0.315
2019 Q33.4B794M177M$0.87$0.66 – $1.024
2019 Q43.5B978M256M$0.54$0.41 – $0.644
2020 Q12.8B718M86M$0.35$0.26 – $0.413
2020 Q22.8B888M194M$0.44$0.33 – $0.522
2020 Q33.9B1.1B362M$0.76$0.58 – $0.902
2020 Q43.4B559M-76M$0.76$0.58 – $0.902
2021 Q11.9B-609M-1.2B$-2.83$-3.34 – $-2.152
2021 Q23.3B656M52M$0.55$0.42 – $0.651
2021 Q35.0B712M13M$1.32$1.28 – $1.351
2021 Q46.0B623M-84M$2.50$1.89 – $2.941
2022 Q13.8B-889M-1.6B$0.19$0.14 – $0.221
2022 Q24.0B739M57M$0.24$0.18 – $0.291
2022 Q36.6B677M14M$1.61$1.22 – $1.901
2022 Q46.4B795M-92M$1.32$1.00 – $1.551
2023 Q11.9B-1.3B-2.0B$0.06$0.05 – $0.071
2023 Q22.8B709M63M$0.88$0.66 – $1.031
2023 Q35.1B705M15M$1.59$1.20 – $1.871
2023 Q43.5B558M-101M$-0.04$-0.05 – $-0.032
2024 Q12.9B-1.7B-2.5B$0.62$0.27 – $0.973
2024 Q24.0B1.5B469M$1.38$1.05 – $1.631
2024 Q35.0B1.5B394M$1.16$0.83 – $1.354
2024 Q43.9B1.9B752M$2.22$2.05 – $2.323
2025 Q14.5B1.3B181M$0.54$0.51 – $0.563
2025 Q24.7B1.4B296M$0.88$0.43 – $1.076
2025 Q36.1B1.9B701M$2.08$1.90 – $2.425
2025 Q45.8B2.0B779M$2.31$0.98 – $5.186
2026 Q15.2B1.6B447M$1.32$0.64 – $3.446
2026 Q25.5B1.7B545M$1.61$1.12 – $1.826
2026 Q36.0B2.5B1.0B$2.98$2.77 – $3.104
2026 Q46.0B2.1B667M$1.97$1.37 – $2.294
2027 Q15.4B2.0B593M$1.76$0.90 – $2.612
2027 Q25.4B2.3B841M$2.49$2.12 – $2.841
2027 Q36.6B2.6B1.1B$3.18$2.71 – $3.631
2027 Q46.5B2.6B1.1B$3.12$2.66 – $3.571
2028 Q16.0B2.2B779M$2.31$1.96 – $2.641
2028 Q25.8B2.5B1.0B$3.02$2.57 – $3.451
2028 Q37.0B2.9B1.3B$3.91$3.33 – $4.471
2028 Q46.8B2.7B1.2B$3.42$2.91 – $3.911
2029 Q13.8B1.8B456M$1.35$1.15 – $1.541
2029 Q24.9B2.3B915M$2.71$2.31 – $3.101
2029 Q38.4B4.2B2.3B$6.87$5.85 – $7.851
2029 Q44.3B2.0B678M$2.01$1.71 – $2.291

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$1.17M
3 txns · 1 insider · 8,665 sh
Sells ($, 12mo)
$32.51M
14 txns · 9 insiders · 203,724 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-10-07SELLMoldovan Kristopher E.officer: EVP and CFO20,000$165.00$3.30M$29.54M
2026-10-06SELLHUDSON SCOTT Aofficer: EVP & President Vistra Retail22,222$160.14$3.56M$49.47M
2026-09-08SELLHUDSON SCOTT Aofficer: EVP & President Vistra Retail44,444$151.82$6.75M$50.27M
2026-09-08SELLMoldovan Kristopher E.officer: EVP and CFO20,000$151.03$3.02M$30.06M
2026-09-01BUYBURKE JAMES Adirector, officer: President and CEO4,465$135.25$604K$155.04M
2026-08-31BUYBURKE JAMES Adirector, officer: President and CEO2,200$135.99$299K$155.29M
2026-08-24BUYBURKE JAMES Adirector, officer: President and CEO2,000$135.00$270K$153.86M
2026-06-18SELLSULT JOHN Rdirector6,500$170.00$1.10M$12.02M
2026-06-18SELLAcosta Arciliadirector15,000$167.52$2.51M$5.46M
2026-06-16SELLHELM SCOTT Bdirector25,000$160.00$4.00M$37.15M
2026-06-15SELLBARBAS PAUL Mdirector244$153.00$37K$8.11M
2026-06-12SELLBARBAS PAUL Mdirector244$147.93$36K$7.88M
2026-06-02SELLMontemayor Margaretofficer: SVP, Chief Accounting Officer4,600$160.00$736K$1.56M
2026-05-27SELLMontemayor Margaretofficer: SVP, Chief Accounting Officer5,000$164.96$825K$2.37M
2026-03-09SELLMoore Stephanie Zapataofficer: EVP and General Counsel10,000$160.31$1.60M$18.34M
2025-12-11SELLBURKE JAMES Adirector, officer: President and CEO22,251$162.05$3.61M$48.29M
2025-11-24SELLMoore Stephanie Zapataofficer: EVP and General Counsel8,219$173.35$1.42M$13.84M
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand

Thesis

Vistra owns a strategically valuable portfolio of nuclear, gas and retail assets in markets where electricity demand may grow faster than new generation can be built. Its integrated retail-generation model and hedging reduce, but do not eliminate, commodity exposure. PJM capacity prices, nuclear PPAs and the prospect of data-center colocations are substantial positives. The principal risk is that investors capitalize a temporary power-price cycle as if it were permanent, while Vistra continues to consume significant cash in growth capex and acquisitions. The latest quarter supports the structural thesis operationally: generation improved, retail remained solid, fleet availability was high and management reaffirmed 2026 guidance. However, 2027 is trending toward the lower end of the opportunity range because ERCOT forward prices are weaker. Helix is strategically interesting but early, and Cogentrix, Meta-related economics and new data-center projects still carry closing, regulatory and execution risk. I therefore value the company on normalized owner earnings rather than peak adjusted EBITDA.

Trade Signal

Trade rating
-0.2/10
No trade
Horizon
~6mo
gpt-5.6-luna2026-08-07 · saw $140.36-12.6% since

No trade: Vistra's strategic power assets and positive operating inflection are real, but the analyst's fair value is essentially the current market cap and the 2% FCF yield leaves inadequate compensation for power-price, capex and execution risk.

Temporary mispricing+2.0

Vistra fell from the $190–$210 area in late 2025 to the low $140s by February 2026, recovered toward $170–$173 in February, and then oscillated between roughly $140 and $169 through the spring and summer. The latest leg down from $169 in June to $141 after early-August earnings occurred despite strong Q2 results and reaffirmed guidance; the earnings-day move was effectively flat, indicating that good news was already expected. The decline is partly a durable repricing of high expectations and lower ERCOT forward curves, not pure panic. Still, the market appears to have undershot the improving PJM, nuclear-contract and dispatchable-capacity facts modestly. That gap could close on execution, but there is no sufficiently clear temporary dislocation to make it a trade by itself.

Market view-2.0

The stock has shifted from a crowded power/data-center winner to a disliked but still widely recommended growth utility. The 1-year analyst target averages $228.78 and the consensus is 20 buys, 2 holds and no sells, yet the shares are down 31% over one year and 35% below the 52-week high. Short interest is only moderate and falling, while put open interest materially exceeds call open interest. Bulls see structural load growth, PJM scarcity and nuclear PPAs; bears see cyclical power prices, high capex, Cogentrix leverage and a large gap between adjusted EBITDA and free cash flow. The bullish consensus may be stale on valuation, but the stock is not hated enough to create a strong contrarian setup.

Inflectionwindow ~3mo+2.0

The operational trajectory is positive: Q2 EBITDA rose more than 30%, PJM capacity prices are exceptional, Cogentrix is pending, and Meta/Helix could improve contract quality. But much of the attractive narrative is already embedded in consensus and the analyst's bull/base cases. The key missing evidence is conversion from EBITDA growth to durable owner earnings after maintenance and growth capex. The first meaningful proof should come from the Q3 print and Cogentrix timing, with a fuller test at 2027 guidance.

Catalysts
  • ▲2026-08 · FERC regional-grid compliance filings and clarification of behind-the-meter co-location rules — Expected around the 60-day response period from the June 18 show-cause orders; clearer rules could support premium nuclear/data-center contracts.
  • ▲H2 2026 · Cogentrix acquisition closing — The 5.5 GW gas portfolio should add dispatchable PJM/ISO-NE exposure, but leverage and integration execution remain risks.
  • ▲2026-11 · Q3 2026 earnings and updated 2027 outlook — A result above the reaffirmed 2026 midpoint, evidence of Cogentrix contribution or stronger hedging could challenge the current cautious valuation.
  • ▲Q4 2026–Q1 2027 · 2027 contracting, capacity-price and nuclear PPA updates — Further visibility on PJM capacity revenues, Meta economics and data-center load growth could improve the earnings-quality narrative.
  • ▲2027-02 · Q4 2026 earnings and 2027 guidance — This is the clearest near-term test of whether the EBITDA opportunity range converts into owner earnings after growth capex.
Flow-2.0

Net share count has modestly declined TTM and management has a $1.2 billion repurchase authorization, with additional capital potentially available for buybacks. That is supportive but not yet an aggressive buyback commitment. The offset is substantial insider selling—48 sales totaling about $192 million and no insider purchases—plus acquisition and growth-capex funding needs. Short interest at 4% of float is declining and offers only modest squeeze fuel.

Floor / Ceiling-1.0

There is no hard floor near the current price. The company is solvent, cash generative and has valuable generation assets, but the reported EV/FCF and 2% FCF yield provide limited valuation support if ERCOT remains weak or capex consumes more cash. The bear case still supports approximately $89 per share, while the main ceiling is the high valuation required for the bullish data-center and power-scarcity scenario; insider selling may also create supply into rallies.

Buyability

Vistra is a credible, liquid US power-platform investment with real strategic appeal: scarce nuclear and dispatchable generation, improving PJM economics, Meta PPAs and potential data-center demand. However, at roughly 49x EV/FCF and a 2% FCF yield, the next buyer needs to underwrite sustained power scarcity and successful growth capex rather than simply recognize an obvious bargain.

Fear vs Greedfear 5/10 (-1.0)greed 7/10 (+1.0)

Fear is slightly stronger than greed at this price. The business and strategic assets are attractive, but the stock still requires a great deal of future power-price durability, data-center monetization and cash conversion to justify its valuation. The post-earnings nonreaction suggests the market is not willing to pay more merely for another strong EBITDA print.

Valuation

Our Target
$47.5B+14%
Market Should Pay
$43.7B+5%
target ×0.92 (fear discount)
Current Market Cap
$41.6BSlightly bearish
What Changed
transcript · 2026-08-07
+6%fair value on this information

The Q2 result newly gave the market evidence that generation and retail can both improve despite weaker ERCOT forward curves: generation benefited from hedging, PJM capacity revenue, optimized gas dispatch, the Martin Lake restart and Lotus assets, while fleet availability exceeded 97%. Management also explicitly expressed confidence in finishing 2026 at or above the guidance midpoint. Offsetting new information was that 2027 currently trends toward the low end of its range, and management could not provide detailed regional 2028 hedge information. The Texas queue audit is expected to last months but is not currently expected to delay Comanche Peak.

▸ How the cases moved

Versus the day before the Q2 report, the bear case rises modestly from $28,000M to $30,000M as the quarter confirms operating resilience and liquidity, while its probability falls from 0.23 to 0.20. The base case rises from $57,000M to $60,000M and its probability increases from 0.55 to 0.55, reflecting confidence in at least the 2026 midpoint and stronger PJM/nuclear contributions, partly offset by lower ERCOT forward prices. The bull case rises from $87,000M to $91,000M and its probability increases from 0.22 to 0.25 because Helix, data-center demand and the potential Cogentrix/Meta contribution remain credible upside options. The event does not justify a major re-rating because management guided 2027 toward the lower end and gave limited detail on 2028 hedges and Helix economics.

2-Year Plausible Outcomes
bear20%
$30.0B
rev -3%/yrOE $3000M

ERCOT remains oversupplied for longer, data-center projects are delayed or economically repriced, and lower forward power prices offset PJM capacity strength. Cogentrix adds leverage without fully delivering its expected earnings, while maintenance and growth capex keep owner earnings below reported EBITDA. Vistra remains solvent and cash generative, but investors apply a lower-quality power-generator multiple.

▸ Valuation

10x $3,000M owner earnings = $30,000M equity value

base55%
$60.0B
rev +4%/yrOE $5000M

Vistra delivers the lower-to-middle portion of its 2027 EBITDA opportunity range, with Cogentrix closing and the Meta-related economics developing but not fully mature. PJM capacity pricing, nuclear PPAs and hedging offset much of ERCOT weakness. The business becomes more contracted and resilient, while disciplined buybacks and moderate deleveraging support a durable owner-earnings stream.

▸ Valuation

12x $5,000M owner earnings = $60,000M equity value

bull25%
$91.0B
rev +10%/yrOE $6500M

Power demand from data centers, industrial reshoring and electrification tightens both ERCOT and PJM. Cogentrix closes smoothly, Meta and other nuclear PPAs monetize at attractive premiums, and Helix creates a high-return channel for colocated power and infrastructure. Owner earnings approach the company's prospective adjusted free-cash-flow potential as growth spending produces returns, justifying a premium for contracted, scarce dispatchable generation.

▸ Valuation

14x $6,500M owner earnings = $91,000M equity value

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is $49,400M. I set the analytical target at $47,500M, modestly below the model, because the scenario framework does not fully capture the uncertainty around sustaining power prices, the capital intensity of the growth program, Cogentrix integration, and the gap between adjusted EBITDA and cash actually available after reinvestment. This is a business-quality and execution adjustment, not a sentiment discount; sentiment is handled separately in the fear-greed modifier.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now7/10
Trajectory8/10
Risk5/10
Governance7/10
Insolvency prob (2yr)2%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Launch of Helix Digital Infrastructure (June 2026): Vistra committed a $1 billion anchor investment to establish Helix Digital Infrastructure alongside partners KKR, Nvidia, and the Kuwait Investment Authority. Helix is a new $10 billion platform engineered to construct integrated infrastructure at the speed and scale required for heavy AI workloads. Crucially, Vistra has been designated as the preferred power provider for the venture, offering a direct strategic channel to contract its existing fleet, leverage hyperscaler relationships, and capture high-return data center opportunities.
  • Acquisition of Cogentrix Energy (January 2026): Vistra signed a definitive agreement to acquire Cogentrix Energy's 5.5 GW natural gas generation portfolio for a net value of approximately $4.0 billion. The deal, which adds 10 dispatchable gas plants to VST's fleet, is expected to close in the second half of 2026. These assets provide Vistra with much-needed dispatchable scale in highly constrained power markets such as PJM and ISO-NE, acting as a crucial bridge as grid-connected power demand outpaces infrastructure timelines.
  • Meta Nuclear PPAs (Early 2026): Vistra executed long-term, 20-year power purchase agreements (PPAs) with Meta. These agreements contract carbon-free electricity generated from Vistra's nuclear assets in PJM, providing long-term cash flow visibility and securing stable, premium returns to support the operations of large tech infrastructure.
  • Q1 2026 Financial Results & Credit Upgrades (May 2026): On May 7, 2026, Vistra reported strong first-quarter results with GAAP net income of $1.029 billion and Ongoing Operations Adjusted EBITDA of $1.494 billion. Management reaffirmed full-year 2026 Adjusted EBITDA guidance of $6.8 billion to $7.6 billion and free cash flow before growth of $3.925 billion to $4.725 billion. Additionally, Fitch upgraded Vistra’s corporate credit rating to Investment Grade, following a similar move by S&P, reflecting the company’s strengthened balance sheet and earnings durability.
▸ Thesis-test Findings
  • PJM capacity auction clearing prices 2026 2027: The PJM 2026/2027 Base Residual Auction (BRA) cleared at a record-breaking $329.17/MW-day, hitting the RTO cap of the price collar. In December 2025, the subsequent 2027/2028 BRA also hit the maximum price cap, clearing at $333.44/MW-day as the entire RTO grid operator fell short of its reliability target, securing only a 14.8% reserve margin instead of the targeted 20%. This extreme price action is highly bullish for Vistra. Driven by the combination of fossil-fuel retirements and forecasted data center demand (which accounted for nearly 5,100 MW of the RTO's load growth), back-to-back cap-clearing prices solidify highly lucrative capacity revenue streams for VST's nuclear and newly expanded gas-fired dispatchable assets in the region.
  • FERC behind the meter colocation nuclear ruling updates: In December 2025, FERC issued a landmark order directing PJM to reform its "unjust and unreasonable" tariff, requiring the grid operator to establish clear rules, interconnection pathways, and new transmission products for data centers co-locating behind-the-meter (BTM) at power plants. FERC followed this in April 2026 by approving four clear interconnection pathways for BTM configurations under PJM's "Bring Your Own Generation" filings. This regulatory momentum culminated on June 18, 2026, when FERC issued sweeping Section 206 "show-cause" orders to all six major US regional grid operators (excluding ERCOT), giving them 60 days to revise their rules to facilitate BTM co-location and large load integration. This is overwhelmingly bullish for VST's thesis. Standardizing BTM pathways bypasses the grid's massive, multi-year interconnection backlogs, allowing Vistra to directly monetize its nuclear fleet with premium-priced, long-term hyperscaler contracts.
  • ERCOT large load interconnection queue data center demand 2026: ERCOT's large-load interconnection queue (tracking energy consumers requiring 75 MW or more) ballooned to over 410–445 GW in early 2026, with data centers making up nearly 87% to 89% of the pending capacity. To manage this massive backlog, the Public Utility Commission of Texas (PUCT) approved ERCOT's first "Batch Zero" framework on June 18, 2026. Under these new rules, ERCOT will study large loads in grouped batches rather than first-come-first-served, requiring developers to show site control, pay nonrefundable fees, and prove financial backing to weed out speculative projects. This development is bullish for Vistra. While the batching process introduces a formal screening hurdle, filtering out speculative "paper" projects stabilizes the queue, and VST's position as the state's leading integrated generator makes it the premier counterparty for the well-capitalized, legitimate hyperscalers that survive the screening process.