Stocks/LNT

LNT

Alliant Energy Corporationv3 5.0/10 · 2026-10-30
Utilities·Regulated Electric
$73.22
$18.8B market cap
2.2% div yield
v3 Rating
5.0/104.0–6.0
Setup
2.5/101.5–3.5
Fair Value
$73.00$62.00–$84.00-0%
DCF (10%)
$48.00-34%
Base IRR
+10%+7%–+13%
Visibility
clear±15%
Wall Street
$73.75 target(6 analysts last quarter)(12 buy, 11 hold)
Rating
Revenue (TTM)
$4.5B
Owner Earnings
$720M
Next-Yr Owner Earnings
-$1.8B
Growth
+8.0% × 10y
P / Next-Yr OE
--
Net Debt
$12.1B

Alliant Energy Corporation functions as a utility holding company, specializing in the provision of regulated electricity and natural gas services. Its operational structure is divided into three principal segments: Utility Electric Operations, Utility Gas Operations, and Utility Other. Through its primary subsidiary, Interstate Power and Light Company (IPL), the corporation generates and distributes electricity, and manages the distribution and transportation of natural gas to retail customers throughout Iowa. IPL also markets electricity to wholesale buyers across Minnesota, Illinois, and Iowa, and generates and supplies steam in Cedar Rapids, Iowa. Similarly, its other subsidiary, Wisconsin Power and Light Company (WPL), is responsible for electricity generation and distribution, alongside natural gas distribution and transport, for retail clients within Wisconsin. WPL additionally sells wholesale electricity in Wisconsin. As of December 31, 2021, IPL catered to approximately 500,000 retail electric customers and 225,000 natural gas customers, while WPL provided services to about 485,000 retail electric accounts and 200,000 natural gas accounts. The company's diverse retail customer base includes businesses in farming, agriculture, industrial manufacturing, chemical production, packaging, and food processing. In addition to its core utility functions, Alliant Energy owns and operates a short-line rail freight service, a multi-modal freight terminal (encompassing barge, rail, and truck operations) on the Mississippi River, and a rail-served warehouse, all located in Iowa. It further provides freight brokerage services. The company also maintains interests in a 347-megawatt (MW) natural gas-fueled electric generating unit situated near Sheboygan Falls, Wisconsin, and a 225 MW wind farm located in Oklahoma. Alliant Energy Corporation was established in 1981 and maintains its headquarters in Madison, Wisconsin.

2-Year Price History

$72.12+30.0%
$55$60$65$70$75Initial target $73.00 · 2026-10-30volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-30

Rating
5.04.0–6.0
Setup
2.51.5–3.5
Fair value (USD)
73.0062.00 – 84.00
Upside vs 73.22
-0%
DCF (10%)
48.0035.00 – 61.00-34%
Base IRR
10%7% – 13%
Visibility
clearrange ±15%
Sentiment
7/10
2026-10-30 · claude-opus-5-5 · priced at 71.65

Alliant Energy is a well-run, plain regulated utility (Iowa through IPL, Wisconsin through WPL). It is in the middle of a data-center-driven growth spurt: five signed electric service agreements (QTS, Google, Meta and others) add more than 60% to peak demand by 2031. On 30 Oct 2026 it raised its 2027-2030 capex plan 19% to $15.9B (rate base plus CWIP growing 13% a year), lifted EPS growth to 8%+ a year through 2030, guided 2027 to $3.63-3.73 and closed a $5.1B low-cost DOE loan. The business is excellent and very visible, but the stock is not cheap. At $71.65 (close on 30 Oct 2026, which matches the pack) it trades at about 19.5x 2027 EPS and about 13x EV/EBITDA, near the top of its 3-year range and in line with Midwest peers. Real free cash flow is deeply negative because the build-out costs about $4B+ a year against about $1.6B of operating cash. Equity holders keep getting diluted: about $3.4B of new stock is due through 2030, roughly 15-18% of today's market cap. On our 10% unlevered DCF the equity is worth only about $48 a share. The stock's real proposition is a roughly 9-11% total return (8% EPS growth plus a 3% dividend, assuming the multiple holds), which is exactly what management advertises (TSR above 11%). There is no route to a 50% one-year gain short of a buyout, which is implausible at this size and multiple. The 10.7% short interest is almost certainly bank hedges against the forward equity sales, not bearish bets, and implied volatility of about 20% is too low for a covered-call setup. Rating 5.0: fairly valued, a fine low-risk compounder, not a mispricing. Research rating 2.5: little a deep dive could uncover that would change the answer.

A deep dive would have to establish: Whether the next 1+ GW of contracted data-center load and lower equity funding can push EPS growth to 9-10% a year, enough to justify a premium multiple, or whether rates and dilution cap returns near 9%.

Owner earnings, TTM
$720M$600M – $880M
Realistic peak profit
$1.4B$1.2B – $1.7B
Growth rate
8.0%6.0% – 10.0%
Years of growth
105 – 20
Market cap
$19B$18B – $19B
EV
$31B$30B – $32B
Net debt
$12B$12B – $13B
Capital return / cap
3.1%2.9% – 3.3%
P/E
19.5×18.5× – 20.8×
EV/EBITDA
13.0×11.8× – 14.0×
FCF yield
3.9%3.2% – 4.6%
Projected FCF, base case (USD millions)
Y1-$1.8B-$2.5B – -$1.1B
Y2-$1.9B-$2.7B – -$1.1B
Y3-$1.1B-$2.0B – -$200M
Y4-$300M-$1.4B – $800M
Y5$300M-$800M – $1.4B
Competition: A regulated monopoly in its territories; for new large loads it competes with MidAmerican (BHE) in Iowa, WEC in Wisconsin and other MISO utilities on speed-to-power and flat rates, where Iowa's land, transmission and 2030 rate freeze give it an edge.
Governance: none flagged
Research (expand)

What the company does

Alliant Energy (NASDAQ: LNT) is a regulated utility holding company with two operating companies. Interstate Power & Light (IPL) serves about 500k electric and 225k gas customers in Iowa. Wisconsin Power & Light (WPL) serves about 490k electric and 200k gas customers in Wisconsin. Nearly all earnings are regulated returns on rate base. The Iowa arm runs under a base-rate stability plan, now extended through the end of 2030, with no retail electric base-rate increase for existing customers. Wisconsin uses forward-test-year rate cases; the next filing comes in spring 2027 for 2028-29.

The investment case

  • Data-center load. Five executed ESAs from three sites total 3.4 GW and support more than 60% peak-demand growth by 2031. Google is taking transmission service in Cedar Rapids. QTS Cedar Rapids is commissioning its first two buildings in Q4 2026. Meta at Beaver Dam, WI moves to transmission service in Q1 2027. QTS Clinton comes later. Management expects about 1 GW more contracted load within six months, with roughly $2-3B of capex per GW, and says it would be disappointed not to update capex at AGA in May 2027. Steel maker Mesabi Metallics (Lee County) is a further, mostly curtailable load.
  • Bigger plan. The 2027-2030 capex plan is $15.9B, up 19%, giving rate base plus CWIP a 13% CAGR. EPS growth is now guided at 8%+ for 2027-2030, with 6-8%+ longer term. 2026 ongoing EPS was narrowed to $3.41-3.46 and 2027 guided to $3.63-3.73. The 2027 dividend is $2.25 (+5%), with the payout heading toward the low end of 60-70%.
  • Cheaper financing. The $5.1B DOE loan (30-year, low rate) saves customers up to $1.2B. About $2B of tax credits (storage ITCs at 30-50%) are monetized over the plan. Hybrids cut the common equity needed.
  • Affordability as a moat. Zero base-rate increases in Iowa through 2030 make the regulatory and political story easier than at most peers. Large loads pay their full cost of service.

What it earns today (real free cash flow)

The primary sources are the Q3 2026 8-K and 10-Q.

  • 9M 2026 operating cash flow was $909M, plus $318M of cash receipts on sold receivables (these sit in investing because of the AR sale program). Economic OCF is about $1.23B for 9M, or about $1.6B annualized.
  • Utility construction capex was $1,643M for 9M (plus $163M other). D&A was $665M for 9M, about $0.89B a year.
  • Treating D&A as maintenance capex and stock comp (about $25M) as a cost, owner earnings are about $0.7B a year (about $2.75/share). Ongoing net income is about $0.89B ($3.44 x about 259M shares), but it includes non-cash AFUDC equity.
  • Actual free cash flow after all capex is about -$1.2B to -$2B a year and is funded by debt, DOE loans, tax-credit sales and new shares.
  • Balance sheet at 30 Sep 2026: debt $12.16B ($11.09B long-term, $374M current, $704M commercial paper) against $26M cash, so net debt is about $12.1B. Shares outstanding are 259.4M, giving a market cap of about $18.6B and an EV of about $30.7B.
  • EBITDA for 2026E is about $2.35B (net income about $0.89B, interest about $0.56B, minimal tax because of credits, D&A about $0.89B), which puts EV/EBITDA at about 13x.

Free cash flow, next 5 years (unlevered, before interest, after ALL capex), $M

Assumptions: economic OCF grows from about $1.6B as data-center revenue ramps; after-tax interest is added back; capex follows the plan ($4.3B, $4.7B, $4.3B, $2.6B), with 2030-31 assumed topped up by roughly $1B a year for the next GW of load.

  • 2027: about -1,800
  • 2028: about -1,900
  • 2029: about -1,100
  • 2030: about -300
  • 2031: about +300

This is the utility treadmill. Growth capex earns the regulated return (about 10% ROE, about 7% on capital), so value comes from earning slightly above the cost of capital on a much larger base. It does not come from free cash flow.

In 5 years, LNT is a growing income stream, not a corpse. It should have about $32-34B of rate base plus CWIP, about $1.45-1.55B of net income, and EPS of about $4.95-5.05 in 2031 (8% a year from $3.41). Unlevered NOPAT should be about $2.3B and EBITDA about $3.9B. The share count rises to about 300-305M after roughly $3.4B of equity issuance. The category is a high-quality regulated grower at 6-8%, which the market has priced at 17-21x earnings and about 12-13x EV/EBITDA. My confidence in the 5-year picture is high. Contracts are signed, construction is underway and regulators are supportive. The main swing factors are interest rates and the multiple, not the business.

Fair value and multiples

  • Today the stock trades at 20.8x 2026E EPS, 19.5x 2027E and about 13x EV/EBITDA (about 11.6x 2027E). Owner-earnings yield is about 3.9%, real FCF yield is negative, and the dividend yields 3.1%.
  • DCF (our method, 10% discount). The PV of 2027-31 unlevered FCF is about -$4.0B. For the terminal value I use 2031 normalized unlevered owner earnings of about $2.3B at 20x, about $46B, which is worth about $28.6B in PV. That gives an EV of about $24.5B. Less net debt of $12.1B, equity is about $12.4B, or about $48/share (range $35-61 for 18-22x). Applying a multiple to year-5 FCF after growth capex (about $0.3B) would value the equity at almost nothing, which is meaningless for a business that reinvests at regulated returns, so I use normalized owner earnings. A 10% unlevered hurdle is well above a utility's roughly 7% cost of capital. That is why the DCF lands below the market. The stock is priced for bond-like investors, not for our 10% bar.
  • Equity IRR from today. In 2030 the stock would be at about 19x 2031 EPS of about $5.0, roughly $95, plus about $9.7 of dividends. Against $71.65 that is about 9.5-10% a year. If the multiple compresses to 17x it is about 7%; if 2031 EPS reaches about $5.3 on capex upside it is about 12%. One year out: about 19.5x 2028E EPS of $3.97, roughly $77.5, plus $2.25 of dividends, is about 11%.
  • Fair value about $73, roughly the price. I accept the market's lower discount rate for a regulated monopoly with signed contracts, but I give no premium: the stock already sits at 82% of its 3-year range and the multiple is in line with peers.

Management, risks and competition

  • Management. CEO Lisa Barton (ex-AEP) and CFO Robert Durian are conservative and credible. They raise the bar for what goes into guidance (signed ESA plus land, transmission, generation and local permitting), beat guidance and use forward equity proactively. The dividend is raised every year and growth is now partly self-funded. There are no governance red flags.
  • Risks.

- Steady dilution: about 375bp a year of EPS drag from equity issuance.

- Rates and the utility multiple: the stock fell from $76 to $63 between June and September 2026 on sector moves alone.

- Data-center politics: a Linn County unincorporated moratorium and Wisconsin gubernatorial candidates floating statewide moratoriums. Iowa and Wisconsin both elect governors on 3 Nov 2026.

- Hyperscaler pullback (mitigated by capacity-only ESAs with minimum bills).

- Construction cost and turbine supply.

- Earning the authorized ROE under the Iowa rate freeze leans on tax credits, which are exposed to policy changes.

- Rising O&M.

  • Competition. As a regulated franchise, LNT faces no competition for its customers. For new large loads it competes with MidAmerican (Berkshire Hathaway Energy) in Iowa, WEC in Wisconsin, and Xcel and other MISO utilities on speed-to-power and rates. Iowa's land, transmission and flat rates are a real edge.

How investors and analysts feel (sentiment 6.5/10)

Sentiment is mildly positive. Consensus is Buy, with roughly 8-9 Buys, 5-6 Holds and no Sells. Average targets are about $75-78 (range about $73-86), only 5-10% above the price; targets will likely drift up after the 8%+ guide. Analysts on the call (Barclays, BofA, Jefferies, Mizuho, Scotia, Wolfe) were complimentary. Their questions focused on the size of the 'plus' in 8%+ and on equity needs. The stock rose 2.2% on the day of the print. Short interest of about 27.7M shares (10.7% of shares, 9-13 days to cover) looks alarming for a utility. It almost certainly reflects forward-sale counterparties hedging the roughly $1.1-1.8B of forward equity agreements, not fundamental shorts. There is no forced seller and no insider-buying signal. Options are quiet: ATM IV is about 19-21% with negligible open interest, which is not a covered-call floor setup. Retail views it as an 'AI utility' at a reasonable price. Morningstar has written it up as undervalued, but that was earlier, at lower prices.

Bottom line

LNT is a quality, visible, 8%-growth regulated compounder priced for roughly a 10% total return. It does not fit our 50%-in-a-year mandate. It is worth owning only as a low-volatility holding, and better bought near $60-63 (the September low) than at $71.65.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue4504+5%4363+10%3982-1%4027-4%4204
Gross profit1958+12%1749-2%1780+3%1735+2%1709
Operating expenses939+33%724-19%894+13%791+1%781
▸Adj EBITDA1900+1%1870+13%1659+2%1620+1%1599
▸Adj OCF851-46%1568-5%1642+14%1438+6%1356
CapEx-4095-4613-2249-1854-1484
Adj FCF-3244-3045-607-416-128
Interest expense571512449420341
▸Adj net income668-1%661+20%552+6%520-8%565
▸Owner's earnings644--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA9046100%1708100%2019100%1797100%1803100%1719100%
FCF (OCF−capex)-7214-80%-703-41%-3444-171%-1082-60%-987-55%-998-58%
Net income368041%79246%81040%69038%70339%68540%
▸Capital returned-961-11%-64.0-4%-690-34%31.02%-150-8%-88.0-5%
Buybacks-387-70.0-23.0-23.0-246-25.0
Dividends2310413521492456428
Interest paid2152430512449420341
Debt paid down-5036-837-1700-887-780-832
▸Reinvestment11964132%161294%4794237%2249125%1854103%145585%
Capex (PP&E)1181216124613224918541484
Intangibles & M&A-29.00.000.000.000.00-29.0
Leases signed (net Δ)181--181------
Retained / other-4072-45%-209-12%-2242-111%-664-37%-417-23%-540-31%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)2595425815227142123720163
▸Liabilities (total)1814618481157101446013887
Net debt (incl. leases)12537117901032594478698
Net debt / Adj EBITDA6.606.306.225.835.44
Net debt / Adj FCF----------
Adj EBITDA / interest3.333.653.693.864.69
Shares outstanding259257257256251
Dilution (YoY)+0.5%+0.2%+0.2%+2.0%+0.1%
Employees29981700299832811700
MarginsTTM2025202420232022
Gross margin43.5%+2.440.1%-4.644.7%+1.643.1%+2.440.6%
Adj EBITDA margin42.2%-1.842.9%+1.241.7%+1.440.2%+2.238.0%
Adj OCF margin18.9%-18.135.9%-5.341.2%+5.535.7%+3.532.3%
Adj FCF margin-72.0%-40.1-69.8%-54.6-15.2%-4.9-10.3%-7.3-3.0%
Net income margin20.7%+1.618.6%+1.217.3%-0.117.5%+1.216.3%
Adj NI margin14.8%-1.015.2%+1.313.9%+0.912.9%-0.513.4%
ROIC (adj, after-tax)5.0%5.2%5.1%5.8%6.0%
Cost of debt4.7%4.4%4.4%4.5%4.1%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Electric$888.0M+4%
Gas$271.0M+13%
Other Utility$2.0M-85%

Earnings Calls

12 calls

Earnings Call · 2026 Q3

2026-10-30

Alliant Energy reported Q3 2026 GAAP EPS of $1.52 and described extraordinary momentum from rising customer demand and economic development. It narrowed 2026 ongoing EPS guidance to the top half of the original range ($3.41-$3.46), initiated 2027 guidance of $3.63-$3.73 (8% growth over the original 2026 midpoint) and set a 2027 dividend target of $2.25, up 5%. Dividend growth is being moderated to help fund the larger capital plan, with the payout ratio expected near the low end of the 60%-70% target range. Long-term EPS growth was raised to 6%-8%+, with 8%+ from 2027 through 2030, and projected total shareholder return exceeds 11% annually. The refreshed 2027-2030 capital plan is $15.9 billion, up 19%, and implies a 13% rate base plus CWIP CAGR (up from 12%). It adds 1.2 GW of gas combustion turbines and 200 MW of storage. The gap between 13% investment growth and 8%+ EPS growth reflects roughly 375 bps of equity dilution and 50 bps from refinancing nonutility and parent debt. Five data centers support greater than 60% contracted demand growth by 2031. Three are under construction: Google (Cedar Rapids), QTS Cedar Rapids (first two buildings to be commissioned this quarter) and Meta in Wisconsin (transmission service expected Q1 2027). Google's expansion ESA has met the planning threshold. Mesabi Metallics expects to locate in Lee County, with largely curtailable load; only its initial non-curtailable capacity is in the plan. Management has raised the bar for including projects to require land, transmission, generation and now local permitting. Three sites total 3.4 GW, and management expects about 1 additional GW of contracted load within six months, with roughly $2-$3 billion of CapEx per GW to be reflected at EEI or AGA updates. Financing: equity is about 40% of incremental CapEx, with $2.7 billion of common equity in the four-year plan, of which $1.1 billion is secured through forwards, covering needs through the first half of 2028. About $600-$700 million more is expected before year-end. The plan also includes roughly $2 billion of tax credits, a $5.1 billion DOE loan guarantee (up to $1.2 billion of customer savings) and hybrids. Debt plans include up to $500 million more in 2026 and up to $2.8 billion in 2027. Affordability: IPL's Iowa base rate stability plan is extended one year through 2030, supported by storage tax credits (potentially 30%-50% ITC). Wisconsin filed a large load tariff, with decisions on it and a second Google ICR expected in the first half of 2027. A QTS Clinton ICR filing is expected in the first half of 2027, and the next Wisconsin rate review (test years 2028-2029) is expected in spring.

SEC Filing Findings

SEC Filing — material findings

2026-10-30 · depth 9/10
risk 6Dilution
▸

Forward-sale ATM programs: 2025 ATM forwards could settle into 18.67M shares for $1,232M and 2026 ATM forwards into 6.91M shares for $504M; the company plans up to $2.7B of common stock issuance 2027-2030, beyond the already-secured forwards. Forward prices (~$66 and ~$73) are below recent trading (~$65-76), and the forwards are subject to floating-rate daily adjustment.

“As of September 30, 2026, Alliant Energy could have settled all of its outstanding forward sale agreements under the 2025 at-the-market offering program with physical delivery of 18,668,448 shares of Alliant Energy common stock to the counterparties in exchange for cash of $ 1,232 million.”

Options

Chain Snapshot (daily)

Call IV (ATM)22%
Put IV (ATM)21%
ATM Spread3.8%
Call $OI (near money)$136K
Put $OI (near money)$7K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$72.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$60.00$12.10/$16.000--/$0.950
$62.50$10.10/$13.500--/$0.950
$65.00$7.60/$11.100--/$0.950
$67.50$5.30/$8.000--/$2.500
$70.00$3.50/$6.402--/$2.750
$72.50$0.85/$3.6015$0.80/$3.300
$75.00$1.05/$1.9016$1.80/$3.900
$80.00--/$0.750$5.70/$7.800
Snapshot: 2026-11-04

Short Interest

Short % of Float11.0%
Short Shares28.6M
Days to Cover9.3
Change (vs Prior)+4.1%
Short % Float History
11.00%+5.50pp
5.0%6.0%7.0%8.0%9.0%10.0%11.0%10-1512-3103-1305-2908-1410-30

Web Traffic

alliantenergy.com
Web rank#745,903
Est. visits/mo657K
Traffic YoY▼ 48.7%
Traffic QoQ (12w)▼ 7.0%
Web Rank History
#745,903+138,230
rankest. visits/mo
400k600k800k385K1.0M1.7M2.4M3.0M05-1908-2512-0103-0906-1509-2111-16

Executive Compensation (2023.0-2025.0)

Direct Pay$83.0M
Incentive & Other$28.0M
Total Compensation$110.9M
% of Revenue0.9%

Cash Runway

0.1months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$1.91B$58.37+$37.2M+$92.2M—$6.70T
STATE STREET CORPPassive$1.34B$53.18+$42.8M+$63.9M—$3.38T
VANGUARD CAPITAL MANAGEMENT LLCPassive$1.29B$71.80+$12.4M+$1.29B—$4.68T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$1.10B$71.76−$15.9M+$1.10B—$2.22T
PRICE T ROWE ASSOCIATES INC /MD/$879M$66.93+$69.0M+$850M—$999.12B
Jupiter Topco LLC$837M$76.29+$837M+$837M—$244.60B
Nuveen, LLC$602M$62.52+$34.4M−$36.2M—$417.75B
GEODE CAPITAL MANAGEMENT, LLCPassive$563M$55.25+$11.4M+$42.5M—$1.87T
MASSACHUSETTS FINANCIAL SERVICES CO /MA/$534M$50.60−$8.4M−$11.2M—$314.43B
VICTORY CAPITAL MANAGEMENT INC$491M$49.19−$60.8M−$270M—$178.34B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

014.8M29.7M44.5M59.3M$44$52$60$68$762021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
PRICE T ROWE ASSOCIATES INC /MD/11.5MJupiter Topco LLC11.0MJANUS HENDERSON GROUP PLC—VICTORY CAPITAL MANAGEMENT INC6.4MNuveen, LLC7.9MMASSACHUSETTS FINANCIAL SERVICES CO /MA/6.9MNuveen Asset Management, LLC—BANK OF AMERICA CORP /DE/5.6MFMR LLC5.0MInvesco Ltd.4.9M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
CNPCenterPoint Energy, Inc.4125.52×
EVRGEvergy, Inc.381.59×
XELXcel Energy Inc.470.95×
ETREntergy Corporation766.41×
NVTnVent Electric plc350.99×
SRESempra446.62×
AEPAmerican Electric Power Company, Inc.533.99×
LLYEli Lilly and Company41.89×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (6 analysts)$73.75+1.7%
Last Year (22 analysts)$75.16+3.7%
Current Price$72.49
Analyst Ratings
12
11
Buy: 12Hold: 11Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2006 Q1698M82M2M$0.12$0.10 – $0.1411
2006 Q2557M124M38M$0.12$0.10 – $0.1413
2006 Q31.2B221M113M$0.62$0.50 – $0.747
2006 Q4841M303M179M$0.28$0.22 – $0.347
2007 Q1945M162M66M$0.30$0.24 – $0.3613
2007 Q2821M172M53M$0.24$0.19 – $0.2919
2007 Q3805M209M104M$0.41$0.33 – $0.4915
2007 Q4817M306M180M$0.28$0.22 – $0.3418
2008 Q11.0B180M70M$0.33$0.26 – $0.408
2008 Q2919M200M67M$0.22$0.18 – $0.268
2008 Q3980M237M109M$0.50$0.40 – $0.6014
2008 Q41.1B209M82M$0.33$0.26 – $0.4013
2009 Q11.7B239M100M$0.35$0.28 – $0.4211
2009 Q2741M155M34M$0.17$0.14 – $0.2019
2009 Q3997M68M-44M$0.49$0.39 – $0.5913
2009 Q4701M182M46M$0.18$0.14 – $0.2219
2010 Q1968M181M52M$0.27$0.22 – $0.3220
2010 Q2742M172M53M$0.22$0.18 – $0.2617
2010 Q3764M264M116M$0.40$0.32 – $0.488
2010 Q4833M183M52M$0.28$0.22 – $0.349
2011 Q1671M189M55M$0.18$0.14 – $0.2212
2011 Q2745M196M58M$0.24$0.19 – $0.2920
2011 Q31.0B304M145M$0.76$0.61 – $0.9117
2011 Q4819M203M65M$0.30$0.24 – $0.3615
2012 Q1980M183M47M$0.39$0.31 – $0.4719
2012 Q2547M198M52M$0.17$0.14 – $0.2012
2012 Q3848M309M148M$0.62$0.50 – $0.7416
2012 Q4657M267M62M$0.24$0.19 – $0.2918
2013 Q1740M220M67M$0.26$0.21 – $0.3112
2013 Q2670M215M63M$0.26$0.21 – $0.3115
2013 Q3806M332M148M$0.62$0.50 – $0.7414
2013 Q4773M240M63M$0.24$0.19 – $0.297
2014 Q1758M245M82M$0.29$0.23 – $0.3520
2014 Q2804M228M69M$0.32$0.26 – $0.3814
2014 Q3843M339M156M$0.70$0.56 – $0.8412
2014 Q4834M251M65M$0.29$0.23 – $0.3514
2015 Q1938M278M104M$0.48$0.38 – $0.589
2015 Q2694M233M68M$0.29$0.23 – $0.3518
2015 Q3876M371M178M$0.76$0.61 – $0.9116
2015 Q4971M231M45M$0.26$0.21 – $0.3110
2016 Q1824M273M97M$0.41$0.33 – $0.499
2016 Q2775M262M89M$0.39$0.31 – $0.4714
2016 Q31.1B339M147M$1.02$0.82 – $1.227
2016 Q4797M257M65M$0.28$0.22 – $0.348
2017 Q1834M287M101M$0.42$0.34 – $0.507
2017 Q2709M281M89M$0.35$0.28 – $0.4220
2017 Q31.0B419M193M$0.97$0.78 – $1.1617
2017 Q4934M324M104M$0.39$0.31 – $0.4718
2018 Q1881M330M119M$0.48$0.38 – $0.589
2018 Q2854M324M107M$0.47$0.38 – $0.5615
2018 Q3918M453M206M$0.83$0.66 – $1.007
2018 Q4849M304M85M$0.34$0.27 – $0.4114
2019 Q1904M359M123M$0.51$0.48 – $0.547
2019 Q2843M346M106M$0.44$0.41 – $0.4611
2019 Q3969M499M226M$0.93$0.87 – $0.987
2019 Q4938M374M106M$0.43$0.40 – $0.4510
2020 Q11.0B369M121M$0.54$0.51 – $0.579
2020 Q2806M365M113M$0.46$0.43 – $0.496
2020 Q3974M518M232M$0.88$0.83 – $0.936
2020 Q41.1B325M63M$0.23$0.22 – $0.246
2021 Q1900M453M174M$0.69$0.65 – $0.736
2021 Q2754M409M138M$0.56$0.52 – $0.591
2021 Q3920M540M243M$0.96$0.91 – $1.021
2021 Q4577M361M95M$0.36$0.34 – $0.381
2022 Q1952M466M179M$0.72$0.67 – $0.761
2022 Q2857M428M145M$0.58$0.55 – $0.612
2022 Q31.1B590M267M$1.02$0.96 – $1.082
2022 Q4738M428M120M$0.47$0.44 – $0.501
2023 Q11.1B509M197M$0.71$0.66 – $0.751
2023 Q2956M465M160M$0.58$0.55 – $0.621
2023 Q31.1B641M294M$0.93$0.92 – $0.983
2023 Q41.1B496M152M$0.55$0.52 – $0.583
2024 Q11.0B570M216M$0.62$0.58 – $0.664
2024 Q2897M507M167M$0.64$0.61 – $0.665
2024 Q31.1B674M289M$1.11$1.09 – $1.138
2024 Q4870M546M178M$0.68$0.67 – $0.694
2025 Q1985M556M179M$0.69$0.68 – $0.693
2025 Q2887M544M167M$0.64$0.60 – $0.698
2025 Q31.2B732M310M$1.19$1.18 – $1.194
2025 Q4706M550M153M$0.59$0.58 – $0.595
2026 Q11.1B627M207M$0.79$0.76 – $0.816
2026 Q2897M554M151M$0.58$0.51 – $0.616
2026 Q31.3B799M341M$1.31$1.28 – $1.365
2026 Q41.0B548M134M$0.51$0.35 – $0.602
2027 Q11.3B697M238M$0.91$0.90 – $0.913
2027 Q21.1B660M199M$0.76$0.76 – $0.761
2027 Q31.4B859M342M$1.31$1.31 – $1.311
2027 Q4945M625M151M$0.58$0.58 – $0.581
2028 Q11.4B766M250M$0.96$0.95 – $0.962
2028 Q21.2B741M220M$0.84$0.84 – $0.842
2028 Q31.5B952M373M$1.43$1.43 – $1.432
2028 Q41.0B755M212M$0.81$0.81 – $0.812
2029 Q11.5B842M268M$1.03$1.02 – $1.031
2029 Q21.3B820M241M$0.92$0.92 – $0.921
2029 Q31.6B1.0B404M$1.55$1.54 – $1.551
2029 Q41.1B831M231M$0.89$0.88 – $0.891
2030 Q11.6B925M292M$1.12$1.11 – $1.121
2030 Q21.4B904M266M$1.02$1.02 – $1.021
2030 Q31.7B1.1B440M$1.69$1.68 – $1.691
2030 Q41.2B918M258M$0.99$0.99 – $0.991

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$7
1 txn · 1 insider · 0 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-08-10SELLDURIAN ROBERT Jofficer: EVP and CFO0$68.60$7$10.85M
v2 analysis (legacy, 2026-07-30) — for comparison onlyclick to expand

Thesis

Alliant is a regulated utility with improving operating momentum and an unusually attractive long-term load-growth opportunity from hyperscale data centers. Five executed service agreements totaling 3.4 GW, a 60% prospective peak-load increase, constructive Iowa regulation, and a large contracted capital plan materially improve the growth outlook versus a conventional low-growth utility. The tradeoff is substantial: net debt is $11.7B, net debt is 6.3x adjusted EBITDA, adjusted free cash flow is deeply negative, and the buildout will require significant equity issuance. The business is not currently self-funding, so the central risk is not demand alone but whether capital spending earns timely regulated returns without excessive dilution or customer-affordability backlash. Base case value is supported by durable regulated earnings growth, but the range is wide because the load ramp, interconnection, construction timing, and financing burden are all consequential.

Trade Signal

Trade rating
-6.2/10
Short
Horizon
~6mo
gpt-5.6-luna2026-07-30 · saw $69.82+4.9% since

Short: at $70.89, Alliant's valuable data-center growth is already priced in while leverage, negative free cash flow, and future equity issuance make the analyst's roughly $39 fair value materially more credible than the consensus bullish narrative.

Temporary mispricing+1.0

The stock rose from $64.49 at year-end 2025 to a $77.65 July high, helped by the data-center growth narrative, the March Iowa wind/rate-case developments, the IPL credit upgrade, and the April/May Q1 report. It then declined roughly 9% from the July high to $70.89, despite strong Q1 results and the new 370 MW ESA. The post-earnings move was modestly negative overall, suggesting the market did not fully reward the good news because the growth was already anticipated and financing concerns remain. This is more a gradual premium repricing and drift than a panic overshoot; the gap may widen if dilution becomes explicit, but there is no large temporary oversold dislocation today.

Market view+4.0

The market is constructive to bullish: analysts overwhelmingly rate the shares Buy, the average target is slightly above the current price, and the hyperscaler/data-center narrative has attracted attention. Bulls point to 3.4 GW of contracted load, 7%+ long-term EPS growth, Iowa rate stability, and fast-track MISO interconnection. Bears increasingly focus on leverage, negative free cash flow, execution risk, and dilution; short interest has risen steadily from about 2.5% in mid-2025 to 10.9%. The stock is not euphoric, but the consensus is stale in one important respect: it emphasizes total-company growth more than the weaker near-term per-share and financing economics.

Inflectionwindow ~3mo+2.0

The operating inflection is real: five executed ESAs represent 3.4 GW of contracted demand and could increase peak load by roughly 60% by 2031. Iowa regulation is supportive, and the company has a credible path to add generation and grid capacity. But this is primarily a multi-year rate-base inflection, not an imminent earnings step-change. Consensus is already constructive, with 12 buys, no sells, and a one-year target around $74.78; the market's price also implies substantial confidence. Near-term evidence may therefore disappoint on per-share earnings because spending and financing precede rate-base returns.

Catalysts
  • ▲2026-08 · Q2 2026 earnings and capital-plan update — Results and commentary should show whether data-center demand, construction execution, and financing needs remain on track; a beat or higher guidance could support the stock.
  • ▲2026-Q3 · Resource plan and refreshed 2027-2029 EPS-growth outlook — Management expects to provide an update in the third-quarter period; confirmation of high-single-digit earnings growth could prolong the premium valuation.
  • ▲Late 2026 · EEI conference investor update — Additional hyperscaler agreements, resource-plan detail, or evidence of timely power delivery could reinforce the bull case, while weak per-share economics would expose the valuation gap.
  • ▼H2 2026-H1 2027 · Equity financing / ATM utilization — The $1B ATM and ongoing funding requirements can cap per-share upside and make dilution more visible as the capital program accelerates.
  • ▼2026-Q4 · Q3/Q4 earnings and financing-cost updates — The thesis is vulnerable to evidence that rate-base earnings lag spending, data-center load ramps slowly, or leverage and interest expense rise faster than expected.
Flow-3.0

No meaningful buyback support is evident. The company has already raised $1.3B through forward equity agreements and filed a $1B ATM to fund the buildout through 2029. Current TTM dilution is reported at 0%, but prospective dilution is a central risk. Rising short interest to 10.9% of float and 12.8 days to cover create squeeze fuel, while options activity is call-heavy and could make the stock volatile on positive news.

Floor / Ceiling-2.0

There is a real but soft floor from regulated utility assets, recurring customer demand, a 3% dividend, and low near-term insolvency risk. However, net debt of $11.7B, 6.3x adjusted EBITDA leverage, negative free cash flow, and required equity financing prevent this from being a hard asset-value floor. The more important feature is a ceiling: at roughly 28x earnings and 4.1x sales, the stock already discounts much of the data-center opportunity, while ATM issuance and future equity needs can absorb upside.

Buyability

Poor for a fresh long at $70.89: the company is operationally attractive and regulated, but prospective buyers must underwrite a roughly $13.4B capital program, $11.7B of net debt, deeply negative free cash flow, and substantial equity issuance. The likely next buyer is a growth-oriented utility investor attracted to hyperscaler load growth, but the consensus already broadly owns that narrative.

Fear vs Greedfear 5/10 (-2.0)greed 7/10 (+3.0)

Fear is stronger than greed at $70.89. The business is high quality and the data-center contracts are genuine, but the price appears to capitalize a favorable long-term scenario before the earnings and per-share cash economics are visible. The risk is not business failure; it is paying a growth multiple for regulated growth that will be financed and realized slowly.

Valuation

Our Target
$9.5B-49%
Market Should Pay
$8.7B-54%
target ×0.92 (fear discount)
Current Market Cap
$18.8BBullish
What Changed
financials release · 2026-05-01
+8%fair value on this information

The genuinely new information is the signed 370 MW Iowa electric service agreement, bringing fully executed contracted demand to 3.4 GW, plus confirmation that three projects are already under construction. The quarter also showed ongoing EPS of $0.82 despite mild weather. The broader data-center thesis and capital plan were already substantially known before the release.

▸ How the cases moved

The newly reported 370 MW Iowa agreement and confirmation of five fully executed ESAs totaling 3.4 GW shift value toward the upside: the bull case rises from roughly $15,500M to $17,100M and its probability increases from 0.20 to 0.25; the base case rises from roughly $12,200M to $12,800M and increases from 0.50 to 0.55; the bear case declines from roughly $6,200M to $6,000M and its probability falls from 0.30 to 0.20. The changes reflect better visibility into contracted demand, although the reaffirmed guidance and financing requirements prevent a more aggressive shift.

2-Year Plausible Outcomes
bear20%
$6.0B
rev +1%/yrOE $500M

Data-center demand ramps slowly, projects face transmission or regulatory delays, and the heavy capital program produces dilution without proportional near-term earnings. Rate-base growth is modest and financing costs remain elevated. Alliant remains solvent and regulated, but earnings stagnate around $500M and the market applies a defensive utility multiple.

▸ Valuation

12x $500M owner earnings = $6,000M equity value

base55%
$12.8B
rev +8%/yrOE $800M

The five contracted data-center projects proceed, though load additions and associated generation come online over several years rather than immediately. Rate-base growth, constructive Iowa regulation, and disciplined cost recovery support roughly high-single-digit revenue and earnings growth. Equity issuance funds much of the buildout, limiting per-share leverage, while owner earnings reach approximately $800M.

▸ Valuation

16x $800M owner earnings = $12,800M equity value

bull25%
$17.1B
rev +12%/yrOE $950M

The 3.4 GW contracted load converts rapidly, additional pipeline projects are secured, and Alliant's speed-to-market generation and transmission strategy earns attractive regulated returns. Iowa rate stability and favorable Wisconsin outcomes reduce execution risk. Growth in rate base and earnings exceeds current expectations, with owner earnings reaching approximately $950M despite ongoing equity financing.

▸ Valuation

18x $950M owner earnings = $17,100M equity value

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is $10,012M. I set the analytical target below that figure at $9,500M because the scenario math does not fully capture Alliant's financing and execution burden: adjusted free cash flow is deeply negative, leverage is already high, and the $13.4B capital plan will require substantial equity issuance. The discount is not a sentiment adjustment; it reflects the possibility that regulated rate-base growth arrives later than spending and that per-share economics are weaker than total-company earnings growth suggests.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now7/10
Trajectory8/10
Risk5/10
Governance7/10
Insolvency prob (2yr)2%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Results & Data Center Demand Surge (April / May 2026): Alliant Energy reported first-quarter 2026 GAAP EPS of $0.87 (ongoing EPS of $0.82), exceeding consensus estimates. Reflecting a massive wave of industrial development, management announced that the company now has five fully executed electric service agreements (ESAs) representing 3.4 GW of contracted demand. This contracted demand is projected to drive a ~60% increase in Alliant’s peak load by 2031 (compared to 2025 levels). The total includes a newly executed 370 MW agreement signed in April 2026 with a hyperscale customer in Iowa.
  • Four-Year Capital Expenditure Plan (May 2026): To support this rapid load growth, Alliant is executing a $13.4 billion capital investment plan spanning 2026–2029 (~12% compound annual investment growth rate). Approximately $3.045 billion is designated for 2026 alone, heavily weighted toward natural gas generation ($1.055 billion), renewables and storage ($875 million), and electric distribution grid infrastructure ($550 million).
  • IPL Credit Rating Upgrade (March 2026): Standard & Poor's upgraded the issuer credit and senior unsecured debt ratings of Alliant’s Iowa utility subsidiary, Interstate Power and Light Company (IPL), to A- from BBB+. The upgrade is supported by robust ring-fencing and financial insulation measures, which should help lower IPL's future borrowing costs.
  • Approval of Iowa Wind Expansion (March 2026): The Iowa Utilities Commission (IUC) approved a settlement authorizing IPL to develop up to 1,000 MW of new wind generation (New Wind III). The project has advanced ratemaking principles with a construction cost cap of $3,020/kW, representing approximately $3 billion in capital commitment over the next four decades.
  • Burlington Generation Upgrades (February 2026): Iowa regulators approved Alliant's proposal to add five new reciprocating internal combustion engine (RICE) units at the Burlington Generating Station, replacing aging infrastructure with highly flexible capacity to support grid stability.
  • Wisconsin Wind Expansion (January 2026): Alliant filed an application with the Public Service Commission (PSC) of Wisconsin to construct the 277 MW Columbia Wind Farm in Columbia County, representing over 40 wind turbines and generating millions in local tax revenues.
▸ Thesis-test Findings
  • MISO grid interconnection queue status Wisconsin Iowa 2026

The standard MISO generator interconnection queue remains highly congested, with total requests exceeding 309 GW. In January 2026, MISO announced further processing delays for its 2022, 2023, and 2025 study cycles. To bypass these standard years-long delays and connect capacity quickly, Alliant is aggressively leveraging MISO’s Expedited Resource Addition Study (ERAS) fast-track process, which secures interconnection agreements in months rather than years. Alliant represents 3.3 GW (roughly 13%) of the total capacity under active ERAS review, making it the third-largest participant in the fast-track program. In late May 2026, Alliant's 150 MW Neenah gas plant expansion in Wisconsin was selected for the ERAS Cycle 4 review. This fast-track progress is a major bull-case indicator, demonstrating that Alliant can successfully bypass broader grid queue bottlenecks to bring capacity online. However, persistent localized transmission congestion in Iowa and Wisconsin remains a watchpoint, though Alliant has successfully used topology optimization to mitigate some grid constraints.

  • Alliant Energy Interstate Power and Light rate case decisions 2026

In March 2026, the Iowa Utilities Commission (IUC) approved a favorable advanced ratemaking principles settlement for IPL's 1,000 MW New Wind III project, granting cost recovery up to a $3,020/kW cap. More importantly for the bull case, Alliant announced in Q1 2026 that no active base electric rate reviews are planned in Iowa through at least 2030. This base-rate stabilization period, which provides four more years of billing predictability, represents an exceptionally supportive regulatory compromise following the resolution of IPL's previous contested rate case in late 2024. Coupled with S&P's upgrade of IPL's credit rating to A- in March 2026, Alliant’s Iowa operations face minimal regulatory friction and enjoy a strong, lower-cost financing runway to support its multi-billion dollar capital buildout.

  • QTS Cedar Rapids data center construction progress power supply

The QTS Cedar Rapids Data Center campus is a monumental, $10 billion project under active development on 612 acres. As of April 2026, the construction has progressed to a massive scale, with 8,500 laborers active on-site (visited by U.S. Energy Secretary Chris Wright). However, the project's sheer size has created immediate power supply bottlenecks. In May/June 2026, QTS filed plans with the city and airport commission to install a temporary power plant of modular, self-contained generator units near the Eastern Iowa Airport. This temporary plant is designed to support the testing and commissioning of the data center while permanent utility infrastructure is finalized. This development highlights a mixed thesis outcome: while it reinforces the bull case of massive, near-term electricity demand, it also exposes the execution risk of permanent grid delivery. Alliant is undertaking a massive local infrastructure upgrade—including substation and transmission builds—to permanently serve the QTS site and Google's planned Palo facility, illustrating both the high capital expenditure potential and the pressure on Alliant's localized distribution grid.