Stocks/SEI

SEI

Solaris Energy Infrastructure, Inc.v3 6.5/10 · 2026-11-06
Energy·Oil & Gas Equipment & Services
$61.58
$4.7B market cap
0.6% div yield
v3 Rating
6.5/104.5–8.0
Setup
8.0/106.5–9.0
Fair Value
$75.00$40.00–$115.00+22%
DCF (10%)
$85.00+38%
Base IRR
+18%+0%–+30%
Visibility
wide±50%
Wall Street
$99.55 target(11 analysts last quarter)(9 buy)
Rating
Revenue (TTM)
$936.4M
Owner Earnings
$450M
Next-Yr Owner Earnings
-$50M
Growth
+40.0% × 3y
P / Next-Yr OE
--
Net Debt
$1.1B

Headquartered in Houston, Texas, and established in 2014, Solaris Energy Infrastructure, Inc. (which adopted its current name in September 2024, previously known as Solaris Oilfield Infrastructure, Inc.) serves the United States' oil and natural gas industry. The company engineers and produces specialized equipment for exploration and production firms, as well as oilfield service providers. Beyond manufacturing, Solaris delivers critical support services, including technician assistance, final-mile logistics, and mobilization solutions. Their operations also involve the transfer and secure storage of proppant and railcars at their dedicated transloading facility. Furthermore, Solaris innovates through technology development, offering Railtronix, an inventory management software, and pioneering all-electric equipment designed to automate the low-pressure stages of oil and gas well completion processes.

2-Year Price History

$50.55+201.6%
$20$30$40$50$60$70$80Initial target $75.00 · 2026-11-06volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-06

Rating
6.54.5–8.0
Setup
8.06.5–9.0
Fair value (USD)
75.0040.00 – 115.00
Upside vs 61.58
+22%
DCF (10%)
85.0039.00 – 135.00+38%
Base IRR
18%0% – 30%
Visibility
widerange ±50%
Sentiment
5/10
2026-11-06 · · priced at 57.26

Solaris Energy Infrastructure (SEI) started as a frac-sand logistics company. It is now a behind-the-meter gas-turbine power provider for AI data centers. It has 3.2 GW under long-term contracts with investment-grade customers, a weighted average tenor of about 11 years and a stated backlog of more than $16B. It owns its turbines, which can be moved, and it is adding installation, O&M and EPC services through the GESA and Omega acquisitions. The stock fell from an $86 high to $50.55 (-37% in 30 days, -12% on Nov 5). The trigger was the Nov 3 elections: a Texas governor-elect who backs a data-center moratorium, and Democrats winning Congress. This happened even though SEI beat badly on Q3 ($136M adjusted EBITDA, up 26% quarter on quarter), raised Q4 and Q1-27 guidance (Q1-27 $220-260M, about $960M annualized), signed a 15-year 900 MW contract, and says very little of its power sits in Texas. On Nov 6 it bounced 13% to about $57. At that price we pay about $6.7B EV (fully diluted, net to SEI). Against that: about 13x 2026 EBITDA, about 6.5x 2027 EBITDA (more than double 2026 per guidance), and about 5.5-6x the $1.5-1.6B run-rate the company expects once roughly $2.2B of remaining, fully funded capex is spent. Run-rate unlevered owner earnings come to about $1.0B (about 70% of EBITDA), so the stock is about 6-7x 2029-30 levered free cash flow. My DCF (10%, 11x year-5 unlevered FCF) gives about $85 a share and a base IRR of about 18%. Fair value is set lower, at $75. The terminal value rests on re-contracting turbines after 10-15 year contracts, revenue is concentrated (one customer, reportedly the xAI complex, was 63% of Q2 revenue), the AI capex cycle could turn, and there are governance flags (a serial acquirer using stock; the 2025 Morpheus short report on MER's co-owner). Sentiment is fearful but not capitulation: the stock is still about 7x its 2023 level, and 11 of 12 analysts rate it a buy with targets averaging about $96-98. Rating 6.5 of 10: a contracted, fast-compounding infrastructure business sold off on headlines, at a multiple that turns into under 7x FCF within 3 years if execution holds. Research rating 8 of 10, because counterparty durability and residual value can be checked with more work.

A deep dive would have to establish: Whether SEI's roughly 3.5 GW of turbine contracts will actually be honored, deployed and re-contracted: who the counterparties really are, the guarantees and termination economics, how much of the stated $1.6B run-rate EBITDA is net to SEI after the JV and lumpy services, and what simple-cycle turbines are worth when the 10-15 year terms end.

Owner earnings, TTM
$450M$330M – $560M
Realistic peak profit
$1.1B$750M – $1.4B
Growth rate
40.0%20.0% – 55.0%
Years of growth
32 – 6
Market cap
$5.5B$5.2B – $5.8B
EV
$6.7B$6.3B – $7.3B
Net debt
$1.1B$1.0B – $1.7B
Capital return / cap
0.8%0.6% – 1.2%
P/E
14.0×11.0× – 32.0×
EV/EBITDA
6.8×5.5× – 13.0×
FCF yield
6.7%4.0% – 9.0%
Projected FCF, base case (USD millions)
Y1-$50M-$500M – $300M
Y2$780M$400M – $1.0B
Y3$950M$600M – $1.1B
Y4$1.0B$650M – $1.3B
Y5$1.1B$650M – $1.4B
Competition: Behind-the-meter power is crowded (ProPetro, Liberty, Atlas, VoltaGrid, Aggreko, Bloom, and OEMs selling direct), so SEI's edge rests on operating track record, early-secured turbine supply and turnkey scope, not technology.
Governance: Serial acquirer that pays partly in stock in an Up-C structure; the 2025 Morpheus short report flagged MER co-owner John Tuma's 2012 environmental conviction; the Chief Accounting Officer is changing roles; sponsor Yorktown has been selling down. None of these rises to fraud.
Research (expand)

What the company does

Solaris Energy Infrastructure (NYSE: SEI, Houston; Up-C structure with Class A and Class B shares) has two segments.

  • Power Solutions (over 90% of EBITDA going forward). SEI owns a fleet of mobile and modular gas turbines and gensets, with 3.5 GW pro forma including on-order units. It sells behind-the-meter power to AI data centers and industrial customers as a turnkey bespoke grid: generation, emissions controls, balance of plant (switchgear and transformers via HVMVLV), batteries, gas procurement, and full O&M.
  • Logistics Solutions. The legacy oilfield proppant top-fill systems: about $24M of EBITDA a quarter, sold out, more than $80M a year of free cash flow.

Acquisitions have added third-party services:

  • MER, 2024: distributed power.
  • Genco, March 2026: distributed power.
  • GESA, July 2026: 600+ technicians in installation, commissioning, O&M and aftermarket across 30 countries.
  • Omega, September 2026: specialized EPC, about $275M of which $179M was paid in stock.

SEI now operates about 1 GW of its own capacity plus about 3 GW of third-party capacity.

The contract book:

  • Stateline JV (Contract A). About 900 MW, 50.1% SEI / 49.9% customer, 7-year contract inside a 15-year JV. The customer is widely reported to be the xAI/SpaceX complex in the Memphis/Southaven area; the company does not name it.
  • Hatchbo (B). About 660 MW for 10+8 years with an affiliate of an investment-grade tech company. Turnkey with batteries; revenue starts January 2027.
  • Customer C. About 640 MW for 10+5 years, turnkey including gas supply on a cost-plus basis.
  • Contract D. Signed Oct 29, 2026: about 900 MW for 15 years plus a 15-year option with an existing investment-grade diversified industrial and technology customer. Energizes from 1H27 and ramps through mid-2028. The equipment is not tied to a specific site.
  • Other. 2-6 year industrial and energy contracts.

About 300 MW is unallocated and arrives in 2029. Termination for convenience costs the customer about 50% of the undiscounted remaining revenue, and SEI keeps the equipment.

The investment case

1. Contracted, visible growth. Adjusted EBITDA went $244M (2025) to about $505M (2026E: Q1 84 + Q2 108 + Q3 136 + Q4 guide 165-185). Management says 2027 will be more than double 2026, and the Q1-27 guide of $220-260M already annualizes near $1B. Management puts run-rate EBITDA above $1.6B once everything contracted is deployed, including the 300 MW not yet contracted. The September deck showed about $1.0B+ net to SEI before Contract D and the added capacity.

2. Funding is done. In October SEI issued $1.25B of 7.00% 2032 notes, adding to $1.3B of 6.375% 2031 notes. The revolver is now $850M and undrawn. Management says everything announced is fully funded. Ratings are BB-/Ba3/BB, with a leverage target under 3x.

3. The selloff is about headlines, not fundamentals. The Nov 3 elections (Texas governor-elect Hinojosa campaigned on a data-center moratorium; Democrats won Congress) took the AI-infrastructure group down 12-23%. SEI fell 12% on Nov 5, the day after a beat-and-raise and its largest contract ever. Management says very little of its power is in Texas, and the equipment can be moved wherever customers site their chips. Analysts largely called it a buying opportunity: Raymond James upgraded to Strong Buy ($113), Barclays went to $140, Morgan Stanley to $102, Citi to $100. Wells Fargo cut to $65 but kept Overweight.

What it earns today (real owner earnings)

  • Q3-26 adjusted EBITDA attributable to SEI was $138M; at the Q4 guide midpoint, the run-rate is about $700M a year. Take a blended run-rate of about $620M.
  • Subtract stock comp of about $60M a year (Q3 was $14.8M; it is a real cost), maintenance capex of about $50M, and cash taxes of about $30M. Cash taxes stay low because 100% bonus depreciation shelters income during the build.
  • That leaves unlevered owner earnings today of about $450M (range $330-560M).
  • Reported free cash flow is deeply negative: 9M-26 operating cash flow was $478M against $1.38B of capex plus $212M of acquisitions. Nearly all of that capex is growth spending on contracted turbines and balance of plant.
  • If nothing changed, the equity would earn about $280M a year after about $170M of after-tax interest, roughly 5% on a $5.5B market cap. Under 5% is not the right lens, though, because about 70% of the contracted capacity is not yet earning.

Five-year projection (unlevered FCF net to SEI, after stock comp, cash taxes, all capex and working capital; $M)

Assumptions:

  • Remaining capex from Oct 1, 2026 is about $2.25B: about $700M in Q4-26 (treated as part of the starting net debt), about $950M in 2027, about $400M in 2028 and about $200M in 2029, with maintenance rising to about $150M a year after that.
  • EBITDA net to SEI: about $1.1B in 2027, $1.4B in 2028, $1.5B in 2029, then about 2-3% a year of growth from services and escalators.
  • Cash taxes rise as bonus depreciation runs off.

| Year | Unlevered FCF ($M) |

|---|---|

| 2027 | about -50 |

| 2028 | about 780 |

| 2029 | about 950 |

| 2030 | about 1,000 |

| 2031 | about 1,060 |

Growth years left: about 3 years of contracted ramp. Beyond that, growth depends on new contracts (the 300 MW open plus a services pipeline). Management talks of programmatic multi-year procurement with customers.

What the company looks like in 5 years. A contracted power infrastructure owner with about 3.5 GW+ and $1.5-1.7B of EBITDA. It would have 6-10 years left on IG-backed contracts, low leverage (by 2031 it could be near net cash if it stopped growing), and a services arm worth about $150-250M of EBITDA. That is a growing income stream, not a corpse. The risk is what happens to simple-cycle turbines when contracts roll in the late 2030s. They may be re-contracted as grid-support peakers, or face a glut. That makes it a 10-12x FCF category business (durable contracted cash flow, modest growth), not a 20x compounder.

Fair value and the multiples we pay

Capital structure:

  • Shares: 69.5M Class A plus 10.7M Class B as of Nov 2, which is 80.2M basic. On an if-converted basis there are 96.4M fully diluted shares: the 2030 converts at $26.39 ($155M) and the 2031 converts at $57.20 ($748M) are both at or in the money at $57.
  • Market cap: about $5.5B fully diluted.
  • Net debt to SEI, excluding the converts and pro forma for the October notes: about $2.55B of senior notes plus about $190M (SEI's share of the Stateline loan), less about $1.6B of cash = about $1.15B.
  • EV: about $6.7B.

Multiples:

  • EV/EBITDA: about 13x 2026, about 6.5x 2027, and about 5.5-6x run-rate once the remaining capex is added to EV.
  • Share of EBITDA reaching owners at run-rate: about 70% unlevered (after about $150M maintenance capex, about $70M stock comp and about $250M of cash tax), and about 58% after interest.
  • P/E: about 32x the Q3 annualized adjusted EPS of $0.45, about 14x 2027E.
  • Run-rate levered FCF of about $850-900M is about 6-6.5x the market cap.

DCF:

  • Inputs: 10% discount rate, the FCF above, and 11x year-5 unlevered FCF (about 7.5x EBITDA, close to Raymond James' 7x 2029 EBITDA).
  • Enterprise value of about $9.9B, less the starting net debt plus the Q4-26 burn (about $1.65B), gives about $85 a share (range about $39-135).
  • Base IRR from $57 is about 18%.

I set fair value at $75, a discount to the DCF for terminal-value, concentration and AI-cycle risk. That is about 30% upside. A 50% one-year return needs the market to move back toward the consensus targets (about $96-98) as 2027 EBITDA prints.

On the chart: the 1-year range is $40.5-86.2 and the stock sits about 40% of the way up. It is back near the September-2025 to March-2026 base after giving up the whole 2026 rally. It is not at the bottom of its range, but it has fully retraced in a month while the fundamentals improved.

Management, risks and competition

Management. Founder Bill Zartler (Chairman and co-CEO, about 10%), co-CEO Amanda Brock and President Kyle Ramachandran. They have executed an aggressive pivot well. EBITDA blew through the $425M-by-2027 target that the March-2025 Morpheus short report mocked. Insiders own about 20%, a director bought $250K at $64 in September, and SEI has paid 33 straight quarterly dividends ($0.12 a quarter).

Negatives:

  • Governance flags. The company is a serial acquirer paying partly in stock. The Morpheus report focused on MER co-owner John Tuma's 2012 environmental conviction. The Chief Accounting Officer is changing roles.
  • Possible overhangs. Sponsor Yorktown Energy Partners cut from 16% to 7.2%, and Encompass and Driehaus have also reduced. Both could be continuing supply.

Risks:

1. Counterparty and AI-cycle risk. One customer was 63% of Q2 revenue and 68% of receivables. Management says no customer will exceed 35% of EBITDA at full deployment. Termination fees of about 50% of remaining revenue limit the downside, but would not make SEI whole.

2. Regulation and politics. Data-center moratoria, ratepayer politics and air permits (Title V; the temporary-permit regime). The turbines are mobile, but deployments can still slip.

3. Residual value. Simple-cycle turbines are less efficient than CCGT. After contracts end, a turbine glut is possible if grid build-out catches up.

4. Execution and leverage. About $2.2B of capex is left. The Baker Hughes purchase obligation ($365M) and up to $130M of contingent consideration to Colusa sit off the stated commitment table. Revolver covenants started on Sept 30, 2026, and a material-contract termination triggers a prepayment.

5. Services lumpiness. EPC and services growth is hard to forecast, and management only guides one quarter ahead.

Competition. Rental and behind-the-meter power peers include ProPetro/PROPWR, Liberty Energy (LPI), Atlas Energy, Kodiak, Aggreko, VoltaGrid, Bloom Energy fuel cells, and direct OEM-to-hyperscaler deals with GE Vernova, Siemens Energy and Caterpillar. SEI's edge is two years of 99.9% uptime running large AI loads, owned and redeployable turbines secured early, and turnkey scope. It is not a technology moat; the moat is execution and relationships.

Sentiment: 4.5 of 10

The sell side loves SEI: 11 Buy or Strong Buy versus 1 Hold, average target about $96-98, and estimates being revised up after Q3. The market, though, is in fear mode on AI-infrastructure politics:

  • The stock fell 37% in 30 days and 12% on the day after a beat-and-raise.
  • Short interest is about 16.5M shares, more than 20% of the Class A float, and rising every period since August.
  • The CEO said on the call that the company needs to keep 'educating certain shareholders'.

This is not full capitulation: the stock is still up about 7x from 2023, and it bounced 13% on Nov 6 on upgrades. Sentiment is fearful but not euphoric. Implied volatility is elevated after the crash, but this is not a valuation-floor covered-call setup, because forward earnings depend on the ramp.

Bonds

The context pack has no Bonds section. For reference, SEI has 6.375% 2031 and 7.00% 2032 senior unsecured notes (BB-/Ba3). By 2029, coverage from contracted cash flow (EBITDA about 6x interest) looks adequate.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue936+74%622+99%313+7%293-8%320
Gross profit394+127%201+148%81.0+3%78.9+13%69.8
Operating expenses180+255%64.2+128%28.1-3%29.0+4%28.0
▸Adj EBITDA326+63%218+118%100+16%86.1+19%72.2
▸Adj OCF345+117%202+160%77.5-7%83.2+17%71.2
CapEx-1637-647-188-64.4-81.4
Adj FCF-1292-445-111-690%18.8-10.2
Interest expense48.823.811.83.310.49
▸Adj net income134+237%73.1+268%19.9-18%24.3+15%21.2
▸Owner's earnings100--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA695100%263100%178100%95.9100%86.1100%72.2100%
FCF (OCF−capex)-1461-210%-904-344%-438-246%-129-135%23.928%-13.4-19%
Net income16824%76.529%30.217%15.816%24.328%21.229%
▸Capital returned-2180-314%-1232-468%-715-401%-266-277%22.826%9.3413%
Buybacks52.216.00.009.7926.40.00
Dividends88.522.821.814.614.115.2
Interest paid84.144.623.811.83.310.49
Debt paid down-2405-1315-761-302-21.0-6.39
▸Reinvestment2520362%1513575%673378%179186%69.781%86.4120%
Capex (PP&E)2363138264718864.481.4
Intangibles & M&A13210829.2-5.000.000.00
Leases signed (net Δ)25.322.6-2.93-4.645.314.96
Retained / other67297%264101%272153%154160%4.385%-22.3-31%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 69 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)495121431123468463
▸Liabilities (total)33591316456153145
Net debt (incl. leases)223372621542.011.6
Net debt / Adj EBITDA6.853.332.150.490.16
Net debt / Adj FCF------2.23--
Adj EBITDA / interest6.689.158.4726.0148
Shares outstanding76.649.530.429.031.6
Dilution (YoY)+13.3%+62.6%+4.9%-8.3%+1.6%
Employees364--------
MarginsTTM2025202420232022
Gross margin42.1%+9.932.3%+6.525.9%-1.126.9%+5.121.8%
Adj EBITDA margin34.8%-2.435.0%+3.131.9%+2.629.4%+6.822.6%
Adj OCF margin36.8%+7.332.4%+7.724.7%-3.728.4%+6.222.2%
Adj FCF margin-138.0%-71.2-71.5%-36.1-35.4%-41.96.4%+9.6-3.2%
Net income margin8.0%+0.94.8%-0.25.0%-3.38.3%+1.76.6%
Adj NI margin14.3%+6.911.8%+5.46.3%-2.08.3%+1.76.6%
ROIC (adj, after-tax)3.9%5.6%5.1%14.9%12.9%
Cost of debt2.5%3.8%6.4%6.6%3.7%

Earnings Calls

11 calls

Earnings Call · 2026 Q3

2026-11-05

Solaris reported record third quarter 2026 results as it continues its transformation into a comprehensive power infrastructure provider. Revenue was $341 million, up 55% sequentially, and adjusted EBITDA was $136 million, up 26%. Net income was $35 million, and adjusted pro forma net income was $43 million, or $0.45 per share. Power Solutions revenue was $284 million (up 79%) with segment adjusted EBITDA of $127 million. Owned capacity earning revenue rose 20% sequentially, but the 820 MW average was down 14% in total because temporary third-party generation was released. Logistics averaged 104 fully utilized systems, with revenue of $57 million and adjusted EBITDA of $24 million. Last week Solaris signed its largest and longest contract: roughly 900 MW over 15 years, with an option for 15 more, with an existing investment-grade industrial technology customer. It covers generation, balance of plant, and O&M, and the equipment is not site-specific. Energization begins in the first half of 2027 and ramps through mid-2028. Contracted backlog exceeds $16 billion, with an 11-year weighted average tenor across 3.2 GW of long-term contracts. Including 300 MW of unallocated capacity expected to be contracted for 2029, management sees over $1.6 billion of run-rate adjusted EBITDA. No customer is expected to exceed 35% of EBITDA. Project-level returns on the 3+ GW under development are in the high teens. Solaris bought another 200 MW of generation, bringing acquisitions over the last 12 months to about 1 GW. Guidance was raised again. Q4 2026 adjusted EBITDA is now $165-185 million (previously $145-180 million), and Q1 2027 is $220-260 million (previously $200-240 million). Management expects 2027 EBITDA to more than double 2026. Total expected capital through 2029 rose about $600 million for the added 200 MW and balance of plant. Q3 capex was $547 million, below guidance because of payment timing. In October Solaris added nearly $1.5 billion of liquidity through $1.25 billion of senior unsecured notes and an upsized $850 million revolver, which is undrawn. Management says it is fully funded for announced projects. The Q4 dividend is $0.12 per share, the 33rd consecutive quarterly dividend. Chief Accounting Officer Chris Wirtz is moving to a special projects role, and Jake Gobar will join as the new CAO. Services, expanded through the Omega and GESA acquisitions, now include site prep, engineering, installation, and O&M. Solaris operates 1 GW of owned power plus 3 GW of third-party power. Headcount is nearly 3,000. In Q&A, analysts focused on political and permitting risk after Texas developments. Management said contracts are not site-specific, so customers can relocate equipment. Little power is in Texas today, and termination for convenience provisions require payment of 50% of undiscounted future revenue, with Solaris keeping the equipment. Other topics included the competitive environment, the services outlook, which is lumpy for construction but has a long maintenance tailwind, the evolution toward more efficient grid-interactive plants, and the 15-year contract tenor.

SEC Filing Findings

SEC Filing — material findings

2026-08-06 · depth 8/10
risk 6Hidden Liability
▸

Non-cancellable Baker Hughes turbine purchase obligation of $364.9M plus up to $130.2M contingent additional consideration owed to Colusa, excluded from the stated purchase commitment table; company paid $64.3M to Baker Hughes for overdue milestone invoices and suspension costs at closing, indicating prior supplier delay.

“the Company has a non-cancellable purchase obligation of $ 364.9 million payable to Baker Hughes as manufacturing and delivery milestones are achieved”
risk 6Liquidity/Covenants
▸

Revolver covenants (net leverage up to 5.25x, secured leverage 3.5x, interest coverage 3.0x) begin Sept 30, 2026; a termination or suspension of a Material Contract could trigger mandatory prepayment and reduce revolver availability if pro forma compliance fails.

“a mandatory prepayment requirement and a limitation on the availability of borrowings thereunder that could become effective upon the early termination or suspension of certain Material Contracts”
risk 6Customer Concentration
▸

One customer accounted for 63% of Q2 2026 revenue (58% YTD) and 68% of receivables; a single-customer default or termination would hit the majority of cash flows.

“As of June 30, 2026, one customer accounted for 68 % of our total trade receivables.”

Options

Chain Snapshot (daily)

Call IV (ATM)33%
Put IV (ATM)166%
ATM Spread1.3%
Call $OI (near money)$6.5M
Put $OI (near money)$6.1M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$70.0
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$60.00$4.20/$7.906$8.00/$9.3029
$62.50$4.60/$5.9017$9.20/$10.909
$65.00$3.40/$4.9092$11.10/$12.8013
$67.50$2.80/$4.108$12.50/$14.603
$70.00$2.60/$3.50840$14.80/$16.9016
$72.50$1.85/$2.9018$16.70/$18.508
$75.00$1.45/$2.4037$18.20/$20.902
$77.50$1.05/$2.0520$19.90/$22.900
Snapshot: 2026-11-04

Short Interest

Short % of Float29.6%
Short Shares16.8M
Days to Cover5.9
Change (vs Prior)+1.7%
Short % Float History
29.60%+8.10pp
22.0%24.0%26.0%28.0%30.0%10-1512-3103-1305-2908-1410-30

Cash Runway

4.5months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$419M$29.91+$87.1M−$74.9M—$6.70T
Encompass Capital Advisors LLC$203M$25.12+$61.9M−$89.1M—$2.32B
VANGUARD CAPITAL MANAGEMENT LLCPassive$197M$60.49+$32.8M+$197M—$4.68T
MORGAN STANLEY$163M$26.98+$25.5M+$35.4M—$1.88T
TWO SIGMA INVESTMENTS, LP$159M$35.72+$3.1M+$116M—$128.44B
SUMMIT PARTNERS PUBLIC ASSET MANAGEMENT, LLC$136M$29.54−$2.9M−$57.7M—$3.84B
JENNISON ASSOCIATES LLC$136M$60.06+$41.2M+$135M—$166.63B
Valiant Capital Management, L.P.$129M$58.87+$39.0M+$129M—$1.61B
DRIEHAUS CAPITAL MANAGEMENT LLC$128M$30.53−$3.5M−$53.1M—$17.26B
FMR LLC$127M$31.40−$22.6M−$5.7M—$2.30T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

04.3M8.6M12.9M17.2M$7.49$26$44$62$802021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
Encompass Capital Advisors LLC2.5MMORGAN STANLEY2.0MTWO SIGMA INVESTMENTS, LP2.0MSUMMIT PARTNERS PUBLIC ASSET MANAGEMENT, LLC1.7MJENNISON ASSOCIATES LLC1.7MMILLENNIUM MANAGEMENT LLC268KValiant Capital Management, L.P.1.6MDRIEHAUS CAPITAL MANAGEMENT LLC1.6MFMR LLC1.6MVAN ECK ASSOCIATES CORP1.5M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
CTRICenturi Holdings, Inc.345.33×
TKRThe Timken Company340.29×
DOCNDigitalOcean Holdings, Inc.438.68×
PUMPProPetro Holding Corp.338.17×
UCTTUltra Clean Holdings, Inc.336.26×
FPSForgent Power Solutions, Inc.334.53×
HUTHut 8 Corp.533.58×
RBCRBC Bearings Incorporated331.53×
CORZCore Scientific, Inc.430.22×
GNRCGenerac Holdings Inc.419.34×
MKSIMKS Inc.417.27×
VSTVistra Corp.415.11×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (11 analysts)$99.55+62.6%
Last Year (28 analysts)$90.54+47.9%
Current Price$61.23
Analyst Ratings
9
Buy: 9Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q154M47M32M$0.41$0.38 – $0.431
2019 Q258M52M36M$0.45$0.42 – $0.481
2019 Q359M46M31M$0.39$0.36 – $0.411
2019 Q443M26M15M$0.19$0.18 – $0.201
2020 Q142M24M14M$0.17$0.16 – $0.181
2020 Q211M-8M-15M$-0.19$-0.20 – $-0.181
2020 Q314M-0M-7M$-0.09$-0.09 – $-0.081
2020 Q422M2M-4M$-0.06$-0.06 – $-0.051
2021 Q128M4M-3M$-0.03$-0.04 – $-0.031
2021 Q230M5M-2M$-0.02$-0.02 – $-0.021
2021 Q333M6M-1M$-0.01$-0.01 – $-0.011
2021 Q444M6M-1M$-0.01$-0.01 – $-0.011
2022 Q152M13M5M$0.06$0.05 – $0.061
2022 Q265M20M10M$0.13$0.12 – $0.131
2022 Q396M31M18M$0.23$0.22 – $0.251
2022 Q493M32M18M$0.23$0.22 – $0.241
2023 Q188M31M18M$0.22$0.21 – $0.241
2023 Q279M32M18M$0.22$0.21 – $0.241
2023 Q375M34M19M$0.24$0.22 – $0.251
2023 Q467M28M14M$0.18$0.17 – $0.191
2024 Q164M25M11M$0.14$0.14 – $0.151
2024 Q271M22M10M$0.12$0.11 – $0.131
2024 Q374M19M4M$0.05$0.02 – $0.082
2024 Q493M38M11M$0.14$0.10 – $0.172
2025 Q1114M40M12M$0.14$0.10 – $0.182
2025 Q2124M47M18M$0.22$0.13 – $0.506
2025 Q3141M69M30M$0.36$0.22 – $0.465
2025 Q4164M60M25M$0.30$0.14 – $0.486
2026 Q1183M64M27M$0.33$0.23 – $0.395
2026 Q2208M96M31M$0.38$0.23 – $0.576
2026 Q3267M82M25M$0.29$0.11 – $0.555
2026 Q4377M117M54M$0.64$0.18 – $1.387
2027 Q1477M164M84M$1.01$0.76 – $1.576
2027 Q2518M175M85M$1.02$0.75 – $1.302
2027 Q3565M199M97M$1.16$0.85 – $1.492
2027 Q4559M225M110M$1.31$0.96 – $1.692
2028 Q1604M254M125M$1.49$1.10 – $1.925
2028 Q2640M283M140M$1.67$1.23 – $2.155
2028 Q3678M315M157M$1.88$1.38 – $2.415
2028 Q4707M338M167M$2.00$1.47 – $2.575
2029 Q1624M287M120M$1.44$1.06 – $1.852
2029 Q2651M299M123M$1.47$1.08 – $1.892
2029 Q3661M310M125M$1.50$1.10 – $1.932
2029 Q4667M324M130M$1.56$1.15 – $2.012
2030 Q1707M375M164M$1.96$1.44 – $2.522
2030 Q2707M382M163M$1.95$1.43 – $2.512
2030 Q3708M389M163M$1.95$1.43 – $2.502
2030 Q4709M396M163M$1.95$1.43 – $2.512

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$1.34M
7 txns · 2 insiders · 22,934 sh
Sells ($, 12mo)
$159.08M
8 txns · 7 insiders · 2,160,181 sh
Major holders (≥10% beneficial owners)
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$141.50M
1 txn · 1 insider · 2,000,000 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-11-11BUYTEAGUE AJdirector150$65.81$10K$994K
2026-11-10BUYTEAGUE AJdirector170$59.50$10K$6.98M
2026-11-09BUYTEAGUE AJdirector350$59.23$21K$6.94M
2026-09-08BUYTEAGUE AJdirector7,800$64.23$501K$7.51M
2026-05-13SELLWirtz Christopher P.officer: Chief Accounting Officer700$77.22$54K$2.79M
2026-05-12SELLArgo Laurie Hdirector5,200$72.88$379K$3.27M
2026-05-11SELLPowell Christopher Mofficer: Chief Legal Officer36,852$74.63$2.75M$8.52M
2026-05-08BUYTEAGUE AJdirector6,175$72.98$451K$8.02M
2026-05-08SELLWalker Ray N JRdirector56,841$72.11$4.10M$415K
2026-05-06SELLKeenan W Howard JRdirector2,000,000$74.50$149.00M$0
2026-04-30SELLKTR Management Company, LLC10 percent owner2,000,000$70.75$141.50M$0
2025-12-17SELLArgo Laurie Hdirector2,300$44.25$102K$2.21M
2025-12-17BUYBrock Amanda Mdirector, officer: Co-Chief Executive Officer3,669$40.89$150K$5.77M
2025-12-17SELLDurrett Cynthia M.director, officer: CHIEF ADMINISTRATIVE OFFICER47,011$44.62$2.10M$5.85M
2025-12-17BUYTEAGUE AJdirector4,620$43.12$199K$4.59M
2025-12-10SELLBURKE JAMES Rdirector11,277$53.03$598K$302K
v2 analysis (legacy, 2026-08-06) — for comparison onlyclick to expand

Thesis

Solaris is rapidly shifting from an oilfield-oriented equipment and logistics company into a behind-the-meter power infrastructure platform serving data centers and industrial customers. The strategic opportunity is unusually large: grid delays, transformer shortages, permitting constraints and the premium value of earlier compute availability support long-duration contracts for gas-fired generation and increasingly comprehensive balance-of-plant services. Q2 reinforced that customers are expanding scope and duration, while GESA adds installation, maintenance, refurbishment and global sourcing capabilities. The central analytical issue is cash conversion. EBITDA and OCF have grown rapidly, but capex has vastly exceeded OCF for several years. The company is therefore not yet a conventional free-cash-flow compounder; it is financing a fleet and customer infrastructure buildout. The new senior notes improve liquidity but leave meaningful leverage, and further growth could require additional debt, partners or equity. The base case assumes the contracted fleet begins converting into durable owner earnings over the next two years, but not all management opportunity framing is treated as value today. Q2 was materially positive: revenue and EBITDA accelerated, guidance rose, customer contracts expanded, and liquidity improved. Nonetheless, the business remains exposed to permitting, construction, equipment sourcing, integration, covenant and customer-concentration risks. The upside is substantial, but the range of outcomes is wide and the stock would likely retain a meaningful fear discount until free cash flow and leverage visibly improve.

Trade Signal

Trade rating
+2.2/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-08-06 · saw $56.90+8.2% since

No trade for now: the business is improving and the post-earnings reaction looks too weak, but only a modest valuation gap remains after discounting substantial leverage, dilution and cash-conversion risk.

Temporary mispricing+3.5

SEI rose from roughly $46 at year-end to a $82.88 June peak as the Genco acquisition, hyperscaler contracts, financing and growth narrative were progressively recognized. It then fell sharply through July—from about $80 to $43 at the low—amid profit-taking and skepticism about valuation, leverage, dilution and cash conversion, rather than a disclosed deterioration in the contract book. The stock recovered to the mid-$50s into earnings, but Q2's 47% year-over-year revenue growth, 30% sequential EBITDA growth and raised guidance produced no post-earnings move. The recent decline appears to have overshot near-term operating facts and the earnings reaction was a modestly missed positive, but this is only a temporary dislocation if Solaris demonstrates cash conversion; otherwise the repricing is durable.

Market view-4.5

The stock is disliked and volatile rather than universally loved. It is down 28% over three months and 33% from its 52-week high despite strong Q2 results, while short interest has risen to 34.4% of float. Analysts remain unanimously constructive, but the price action, heavy shorting and insider/holder selling show skepticism about cash conversion, leverage, dilution and execution. The market may be stale on the strength of contracted demand, but it is not ignoring the central risks.

Inflectionwindow ~3mo+4.0

A real operating inflection is underway: Solaris is adding contracted behind-the-meter capacity, expanding into balance-of-plant and O&M, and integrating GESA. Q3/Q4 guidance and the 2027 Hatchbo start could make the transition visible in reported earnings. That said, the market is already aware of the hyperscaler narrative, the analyst consensus is broadly Buy with an $80.82 target, and the current valuation already reflects significant growth. The upside inflection is therefore meaningful but not clearly unpriced.

Catalysts
  • ▲2026-09 · Next hyperscaler deployment and Q3 operating update — The next deployment is expected to energize in September; proof of on-time execution would validate the contracted growth pipeline.
  • ▲2026-11 · Q3 2026 earnings and guidance — The market will test whether the raised $90M-$105M EBITDA outlook is achieved and whether Stateline ramp is progressing.
  • ▲2027-01 · Hatchbo 660 MW project revenue commencement — Revenue is expected to begin in January 2027; balance-of-plant and O&M scope could improve confidence in recurring margins.
  • ▲2027-02 · Q4 2026 earnings and 2027 outlook — This should provide the first meaningful evidence of the larger contracted fleet, GESA integration and cash conversion.
  • ▼2027-03 · Stateline debt covenant testing — The 1.35x fixed-charge coverage test begins in the quarter ending March 2027; any ramp or financing issue could pressure the equity.
Flow-4.5

Net flow is negative: trailing dilution is approximately 9%, there is no announced buyback, and officers and major holders have sold substantially more than they bought over the last year, including two roughly $140M-$150M sales. The dividend and 34% short interest offer some marginal demand and squeeze fuel, but they do not offset ongoing capital needs and equity supply.

Floor / Ceiling+0.5

There is meaningful liquidity—more than $800M of cash, an undrawn $650M revolver and contracted customer demand—but this is not a hard equity floor. Corporate and project-level debt, negative current FCF, high capex intensity, noncontrolling interests and possible future dilution weaken asset support. There is also no obvious hard ceiling, although insider and large-holder selling may reappear into rallies.

Buyability

Moderate, not compelling. Data-center power demand, long-duration hyperscaler contracts and a 1% dividend provide a credible buyer base, but the stock requires continued capital spending and execution before negative free cash flow converts into distributable cash. Growth-oriented infrastructure investors may buy the transition, while traditional value buyers will hesitate at roughly 6x sales and no current FCF yield.

Fear vs Greedfear 7/10 (-2.0)greed 9/10 (+3.0)

Slight greed on the business trajectory, but not enough greed on the stock. The Q2 result and contract expansions were genuinely strong and the post-earnings nonreaction suggests some good news was missed; however, leverage, negative FCF, dilution and a valuation that already discounts substantial success make the risk/reward only modestly attractive.

Valuation

Our Target
$4.7B+0%
Market Should Pay
$3.7B-22%
target ×0.78 (fear discount)
Current Market Cap
$4.7BSlightly bearish
What Changed
transcript · 2026-08-06
+18%fair value on this information

The genuinely new information was the Q2 operating acceleration and the breadth of contract expansions: revenue reached approximately $219M, adjusted EBITDA approximately $108M, Q3 guidance was raised to $90M-$105M, Q4 guidance began at $100M-$120M, and major customer agreements expanded to include balance of plant, batteries, storage, fuel procurement and longer terms. The quarter also provided new evidence that GESA can broaden execution and lifecycle capabilities. Liquidity and the large note financing were important context, but much of the strategic opportunity and financing story was already known before the release.

▸ How the cases moved

Before the Q2 result, I would have assigned approximately $1,200M, $4,500M and $8,500M to the bear, base and bull cases, with probabilities of 0.30, 0.50 and 0.20. After the result, the bear value rises to $1,400M because liquidity and contract visibility improved; the base rises to $5,600M because Q2 EBITDA acceleration, expanded hyperscaler scope and raised guidance improve the two-year earnings path; and the bull rises to $10,350M because GESA and broader turnkey scope increase the ceiling. Probabilities shift to 0.22 bear, 0.52 base and 0.26 bull. The bear probability falls as financing and customer commitments reduce near-term liquidity risk, while the bull probability rises on evidence that customers are expanding contracts rather than merely discussing a pipeline.

2-Year Plausible Outcomes
bear22%
$1.4B
rev +10%/yrOE $120M

Execution, permitting, turbine availability or customer deployment timing disappoints, while Logistics softens. Solaris still reaches a larger contracted fleet, but heavy reinvestment, dilution and project-level financing keep owner earnings well below EBITDA.

▸ Valuation

7x $300M EBITDA = $2,100M EV - $700M net debt = $1,400M equity

base52%
$5.6B
rev +30%/yrOE $400M

The signed hyperscaler contracts ramp substantially, GESA improves execution and aftermarket capability, and balance-of-plant scope expands. Revenue and EBITDA grow strongly, while capex intensity moderates as the deployed fleet begins producing recurring cash returns.

▸ Valuation

10.5x $600M EBITDA = $6,300M EV - $700M net debt = $5,600M equity

bull26%
$10.3B
rev +45%/yrOE $650M

Solaris becomes a scaled, utility-like behind-the-meter power and turnkey infrastructure provider. Hyperscaler demand remains exceptional, open capacity is contracted quickly, GESA creates meaningful third-party and lifecycle revenue, and balance-of-plant economics lift both margins and cash conversion.

▸ Valuation

13x $850M EBITDA = $11,050M EV - $700M net debt = $10,350M equity

▸ Target Rationale

The probability-weighted scenario value discounts to $4,980M at 12% over two years. I set the analytical target at $4,700M, below the model value, because the arithmetic does not fully capture execution risk, high current capex intensity, approximately $1.4B of new senior financing, potential project-level obligations, noncontrolling interests and the likelihood of additional dilution to fund the growth pipeline. The target still recognizes that signed long-duration contracts and improving liquidity have materially reduced the risk that current investment fails to produce a valuable recurring infrastructure platform.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now7/10
Trajectory9/10
Risk8/10
Governance6/10
Insolvency prob (2yr)8%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

Solaris Energy Infrastructure (SEI) has made several highly material announcements over the last six months (January–June 2026) regarding major asset acquisitions, significant contract expansions, and a complete transformation of its capital structure:

  • 900 MW Capacity Expansion & Genco Acquisition (March 16, 2026): Solaris completed the acquisition of Genco Power Solutions for approximately $81 million in cash and 4.18 million shares of Class A common stock, expanding its distributed generation platform. In a concurrent transaction, the company assumed a turbine supply agreement, securing 30 gas turbine generator delivery slots totaling about 500 MW between 2027 and 2029. These moves add 900 MW of new capacity, positioning Solaris to operate roughly 3,100 MW of total power capacity by the end of 2029.
  • Q1 2026 Financial Results (April 27, 2026): Solaris reported strong Q1 2026 earnings with revenues of $196.2 million (exceeding estimates of $182.66 million) and basic EPS rising to $0.40 (compared to $0.14 in Q1 2025). Trailing 12-month revenue reached $692.1 million, and management upgraded its full-year earnings guidance.
  • Major Hyperscaler Power Contracts (April & May 2026): On April 24, 2026, Solaris entered into a new 10-year contract to provide over 600 MW of power capacity, including balance of plant scope, to an affiliate of an investment-grade technology company starting in late 2026. On May 13, 2026, the company expanded an existing contract (originally signed in February 2026) to add 130 MW of capacity and broader balance of plant scope, increasing the total contracted investment under that agreement by over 60% (retaining a 10-year term with a 5-year extension option).
  • Completion of $2 Billion Growth Financing (May 13, 2026): Solaris closed nearly $2 billion in financing to support its massive capital expenditure backlog. This included an inaugural offering of $1.3 billion of 6.375% senior unsecured notes due 2031 (used to retire existing high-cost debt and adding $800 million in net proceeds to the balance sheet) and a new $650 million revolving credit facility.

---

▸ Thesis-test Findings
EPA Quad K mobile turbine emissions compliance updates 2026

On January 15, 2026, the US Environmental Protection Agency (EPA) finalized amendments to the New Source Performance Standards (NSPS) for Stationary Combustion Turbines under 40 CFR Part 60, Subpart KKKKa ("Quad K"). Significantly weaker than the 2024 proposal, the final rule created a special, less-stringent NOx requirement for "temporary" application turbines (up to 850 MMBtu/hour used for less than 24 months). Crucially, the EPA included a conditional exclusion that removes combustion turbines from the "stationary" definition if they meet the "nonroad engine" definition under Title II.

  • Bearing on the Thesis: This is highly bullish for Solaris. The reclassification of trailer-mounted, mobile turbines as "mobile sources" allows data center developers to bypass the lengthy, rigorous Prevention of Significant Deterioration (PSD) major-source stationary permitting process (which has severely delayed rival projects). It solidifies Solaris' rapid speed-to-market advantage for temporary, off-grid power.
Solaris Energy Infrastructure Stateline Power JV debt terms

Formed in April 2025 as a 50.1% joint venture to power a data center campus (associated with Elon Musk's xAI "Colossus" supercomputer project in Memphis), Stateline Power, LLC entered into a Loan and Security Agreement with Stonebriar Commercial Finance on May 23, 2025. The facility allows a maximum draw of the lesser of $550 million or 80% of equipment costs. Debt consists of a floating-rate progress payment phase (Interim Notes) and a term loan phase (Term Notes). The interest rate is structured at SOFR + 350 bps (converting from floating to fixed at approximately 9% to 10% annually). Covenants restrict debt and distributions, and require the JV to maintain a Fixed Charge Coverage Ratio (FCCR) of at least 1.35x to 1.00, with testing set to begin in the fiscal quarter ending March 31, 2027.

  • Bearing on the Thesis: Mostly bullish. This structure represents non-recourse, project-level financing that funds heavy development without over-leveraging Solaris’ corporate balance sheet (though the VIE is consolidated, $250 million is carved out as non-controlling interest). The upcoming 1.35x FCCR covenant test in early 2027 and the relatively high fixed rate of 9–10% are marginal risks, but they are mitigated by a strong, contracted 7-year rental agreement with a high-profile tenant.
Hyperscaler behind-the-meter natural gas turbine contract lengths

According to industry reports and credit rating assessments (such as Fitch's first-time BB rating of SEI in May 2026), behind-the-meter (BTM) natural gas turbine contracts for hyperscalers typically range from 7 to 10 years in tenor. Solaris’ contract with its primary customer under the Stateline JV is structured for 7 years starting in 2026. Its subsequent February 2026 (expanded in May 2026) and April 2026 agreements with other investment-grade hyperscalers are structured for 10-year terms, with some featuring 5-year extension options.

  • Bearing on the Thesis: Strongly bullish. The long-term, 7-to-10-year nature of these contracts shifts the business model away from volatile oilfield services toward predictable, utility-like infrastructure cash flows. Crucially, these agreements are structured as fixed monthly payments or dry leases that pass fuel procurement, commodity price, and electricity price risk directly to the hyperscaler, insulating Solaris' margins from energy price volatility.