WULF
TeraWulf Inc.v3 5.5/10 · 2026-10-16TeraWulf Inc., together with its subsidiaries, owns, develops, operates digital infrastructure in the United States. It also develops and operates bitcoin mining facilities for bitcoin mining and high-performance computing workloads, leveraging clean, cost-effective, and reliable energy. The company was founded in 2021 and is headquartered in Easton, Maryland.
2-Year Price History
Valuation v3 Opus worker · 2026-10-16
TeraWulf has finished turning itself from a bitcoin miner into a landlord for AI data centers. It owns the Lake Mariner campus in New York: 102 MW is earning rent now and 336 MW is under construction (CB-4 and CB-5). That capacity is leased to Core42 (72.5 MW) and to Fluidstack (378 MW, with Google backstopping part of the lease), on roughly 10-year terms. In July it signed a 20-year, 401 MW lease with Anthropic in Hawesville, Kentucky (about $19B over the term, delivery H2'27 to early '28). It also owns a 1 GW Kentucky site (Muskie, power from Q4'28) and a pending Maryland power-plant site (Chesapeake). It sold its Abernathy JV stake for $530M. The stock has fallen from about $27 at June 30 to about $11.65 (Oct 16 intraday, down ~7.7% on the day; the context pack's $12.62 is the Oct 15 quote). That is a sector-wide sell-off in capital-hungry AI builders with the 10-year Treasury yield at 5.3%. Two things make it worse here: the $3.5B Hawesville debt raise is not yet priced, and stock comp plus dilution are heavy. Once everything contracted is built (2028-29), net operating income should be about $1.4B a year (Lake Mariner ~$0.69B plus Hawesville ~$0.7-0.8B), against ~$110M of corporate cost and ~$580M of interest. That leaves roughly $600-700M of free cash flow to equity, on about 634M diluted shares. A 10% equity DCF of the contracted assets alone gives about $9 a share. Adding a probability-weighted value for the Muskie pipeline gives about $11. A cap-rate sum-of-parts gives about $15. I put fair value at about $13.5. Rating 5.5: priced roughly at fair value for the contracted book, with the pipeline optional, but with real execution, refinancing and governance risk. Research rating 7.5: there is a credible route to $18-20+ if Hawesville financing prices well and Muskie signs at mid-teens yields on cost, and both of those resolve within 6-9 months.
A deep dive would have to establish: Can TeraWulf price the ~$3.5B Justified debt and sign Muskie to an investment-grade tenant at mid-teens yields on cost? Does that spread survive cost overruns, stock comp and the Oct-2030 refinancing of the $3.2B Lake Mariner notes against 10-year Fluidstack/Core42 leases?
Research (expand)
What the company does
TeraWulf (Easton, MD; led by founder/CEO Paul Prager) develops and owns power-backed data-center campuses and leases the powered shells and critical IT capacity to AI tenants on long contracts. It does not own the GPUs. Bitcoin mining is now a shrinking side business: $12.8M of Q2'26 revenue against $31.9M of HPC lease revenue.
Contracted book (critical IT MW):
- Lake Mariner, NY. Core42 has 72.5 MW (~$1.1B over 10 years). Fluidstack has 378 MW across CB-3/4/5. Those leases total ~$6.7B over 10 years, plus a further >$500M from the 2026 amendments; TeraWulf put in ~$150M of fit-out for >$300M of extra rent. Google backstops part of Fluidstack's obligations; $600M of that support became effective when CB-3 finished. 102 MW is earning rent. The first CB-4 hall was due to start paying rent in late Q3'26, and CB-5 starts phasing in early 2027. Build cost is about $8-10M per MW.
- Justified Data, Hawesville, KY. Anthropic has signed a 20-year lease for ~401 MW: ~$19B over the base term, ~$950M a year on average with escalators, and up to ~$33B with the extensions. Delivery runs from H2'27 to early '28. Initial investment is about $4.0-4.5B, to be funded mainly by a ~$3.5B Morgan Stanley-led leveraged loan and high-yield package. As of mid-October that package has not been priced. Kentucky regulators approved up to 482 MW of power.
- Pipeline. Muskie, KY (1 GW tariff, first power Q4'28, could reach 2 GW; management calls it its most active data room). Chesapeake/Morgantown, MD (210 MW existing generation, up to 1 GW, FERC approved July 29, data centers ~2030). Lake Hawkeye, NY (~320 MW critical IT, ~2029). Lake Mariner (+250 MW being pursued). The company guides to signing 250-500 MW of new leases a year.
- Abernathy, TX JV. The 50.1% stake was sold for $530M: $250M received in July, $150M due by 12/31/26 and ~$130M by 4/30/27. The JV's $1.3B of notes leave with it.
The investment case
Power is the constraint on AI build-outs, and TeraWulf controls sites with power already delivered or contracted. Management says it builds at mid-teens unlevered yields on cost and finances with ~7.75-8.5% debt. On an investment-grade 20-year lease, that spread creates equity value for every MW it signs. The Anthropic lease changes the credit quality of the book: about 55% of stabilized NOI will come from an investment-grade-supported 20-year contract. If Muskie signs a similar deal in 2027, the platform roughly doubles again.
What it earns today vs at maturity
- Today. Q2'26 revenue was $44.8M, adjusted EBITDA was -$18.3M and the GAAP net loss was -$940M. Of that loss, $756M was a non-cash mark-to-market on the Google warrants. Excluding the warrant marks and the debt extinguishment, the loss was about -$178M for the quarter. That figure includes $84M of stock comp, a $14M charitable stock gift and ~$13M of pre-revenue and development costs. H1'26 operating cash flow was -$154M and capex was -$1.38B.
- Maturity (2029E, contracted assets only).
- Lake Mariner NOI: ~$690M.
- Justified NOI: ~$700-800M, at the 85% NOI margin target.
- Cash corporate cost: about -$110M.
- EBITDA: about $1.3B.
- Interest: about $580M ($3.2B of Lake Mariner notes at 7.75%, ~$3.5B Justified debt at ~8-8.5%, and $2.5B of low-coupon converts).
- Levered FCF before amortization: roughly $600-700M, or ~$1.00 per diluted share.
- GAAP earnings stay small: depreciation of ~$500M+ and stock comp absorb most of it.
- Upside if the pipeline converts. Each ~400 MW signed at a mid-teens yield adds roughly $650-750M of NOI on ~$4.5-5B of capex, about 70% of it debt-funded. At a 7.5% cap rate that is worth ~$4-5B more than it costs. Probability-weighted, that is about $2-4 per share of option value per deal.
Fair value and multiples
At ~$11.65:
- Basic market cap is ~$5.8B on 498.9M shares (7/31/26).
- Including the 73.6M penny Google warrants, it is ~$6.7B.
- Fully diluted (other warrants, RSUs, in-the-money 2030 converts at $8.48) is ~634M shares, or ~$7.4B.
- Gross debt is ~$5.7B: $3.2B 7.75% secured notes due Oct-2030, plus converts of $500M (2030, $8.48 conversion price), $1.0B (2031, $12.43) and $1.025B (2032, $19.94).
- Cash plus the Abernathy receivable is ~$2.5-2.8B, so net debt is ~$3.2B and EV is ~$9.9B.
On those figures:
- EV/EBITDA. ~11.5x 2028E EBITDA of ~$1.23B, using 2028 EV that adds the Justified debt.
- FCF yield. ~9% on 2029E levered FCF.
- P/E. 50-100x+ on 2029E GAAP earnings, because D&A dominates.
Valuation:
- The equity DCF at 10% on contracted assets only gives ~$9 per share. Projected FCF is -$1.0B in 2027 (Justified equity plus development), then about +$0.45B, +$0.62B, +$0.68B and +$0.70B. The terminal value assumes zero growth, which allows for Lake Mariner's 2035-36 lease roll. The DCF also adds ~$1.4B of parent cash and receivables and subtracts ~$0.9B for the present value of stock comp.
- Adding a probability-weighted Muskie value gives ~$11.
- A cap-rate sum-of-parts gives ~$15: Lake Mariner at ~8.5%, Justified at ~7.5%, less remaining capex, net debt and capitalized overhead.
- Fair value is about $13.5. The sell-side average of ~$33 is stale, set near the June highs. More recent calls are UBS $24, Freedom $19 and Redburn Neutral $15.
Risks and competition
1. Financing and rates. The 10-year Treasury is at 5.3%. The $3.5B Justified debt raise still has to clear at a spread that keeps the yield-on-cost advantage. The $3.2B Lake Mariner notes mature in Oct-2030 while the leases behind them end in 2035-36, so refinancing depends on renewals or the Google support.
2. Execution. CB-3 had about 43 tenant change requests, which caused delays. Electrician labor is scarce: the project peaks at ~1,000 electricians and needed a second contractor. Fixed-price coverage is partial.
3. Tenant credit. Fluidstack is a GPU cloud company with little history. Google supports only part of its obligations.
4. Dilution and governance.
- Stock comp was $185M in H1'26, with $286M unrecognized.
- 73.6M penny warrants went to Google.
- In April the company raised $1.04B of equity at $19 and used up its at-the-market (ATM) program.
- There are related-party ties to Prager's Beowulf. These include the Beowulf E&D acquisition and a trust funded with 2% of annual capex for former Beowulf employees.
- Insiders have sold.
5. Policy. New York and Texas are tightening rules on large power loads.
6. Competition. IREN, Cipher (also a Fluidstack/Google partner), Applied Digital, Core Scientific/CoreWeave, Hut 8, Galaxy, and traditional developers (QTS, Vantage, Aligned) all compete for the same tenants. So do hyperscalers building for themselves. The moat is delivered power at brownfield sites, and that edge erodes as new generation comes online.
How investors feel: 3.5/10
The stock is down ~57% from its June high of about $27-30. It trades below the 50-day ($15.8) and 200-day ($19.7) moving averages and near its 52-week low of $10.47. Short interest is ~119M shares, about 24% of shares outstanding and 4.5 days to cover. Options imply ~99% volatility. Zacks moved to Strong Sell on Oct 15. Coverage frames the sector as "AI dreams hit reality" and as financing-heavy builders punished by higher yields.
On the other side, the sell-side is still mostly Buy, the Anthropic lease is a marquee deal, and the parent holds ~$1.5B of cash with no near-term need for equity. Sentiment is washed out but not capitulated. A well-priced Justified financing or a Muskie lease would likely re-rate the stock quickly.
- /Users/gregwo/stocks2/data/analysisv3/context/WULF.md
- /Users/gregwo/stocks2/data/edgar_filings/WULF/10-Q_2026-08-05_0001083301-26-000166.html (Q2'26 10-Q: 498,968,677 shares 7/31/26; debt, converts, warrants, Abernathy sale terms, SBC)
- /Users/gregwo/stocks2/data/edgar_filings/WULF/8-K_2026-08-05_0001083301-26-000162_EX99-1.html (Q2'26 earnings release)
- /Users/gregwo/stocks2/data/transcripts/WULF_2026Q2.json
- https://d1io3yog0oux5.cloudfront.net/_286bff50c78a813f7d4e259725325763/terawulf/db/2265/21651/pdf/TeraWulf+Q4+2025+Investor+Presentation+(Feb+2026).pdf
- https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results
- https://investors.terawulf.com/news-events/press-releases/detail/140/terawulf-reports-first-quarter-2026-results
- https://www.tftc.io/terawulf-3-5-billion-debt-raise-anthropic-justified-data-kentucky
- https://www.stocktitan.net/sec-filings/WULF/424b5-terawulf-inc-prospectus-supplement-debt-securities-3de7f065e15e.html
- https://247wallst.com/investing/2026/10/07/iren-falls-7-as-financing-heavy-data-center-names-sell-off-apart-from-their-sector-fund-terawulf-and-core-scientific-drop-5/
- https://www.tipranks.com/news/catalyst/terawulf-stock-sinks-as-ai-dreams-hit-reality
- https://www.gurufocus.com/news/9124342/terawulf-inc-wulf-shares-fall-126-what-gf-score-of-39-tells-investors
- https://stockstotrade.com/news/terawulf-inc-wulf-news-2026_10_16/
- https://stockstotrade.com/news/terawulf-inc-wulf-news-2026_09_17/
- https://stockstotrade.com/news/terawulf-inc-wulf-news-2026_10_02/
- https://www.marketbeat.com/instant-alerts/analyst-terawulf-nasdaq-wulf-stock-gets-downgrade-from-zacks-research-2026-10-15/
- https://www.heygotrade.com/en/us-stock/wulf/
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 191+14% | 168+20% | 140+100% | 69.9+365% | 15.0 |
| Gross profit | 132+57% | 85.8+11% | 77.4+82% | 42.6+979% | 3.95 |
| Operating expenses | 501+129% | 256+67% | 154+113% | 72.0+51% | 47.7 |
| ▸Adj EBITDA | -255 | -77.3 | -15.0 | -0.07 | -36.7 |
| ▸Adj OCF | -348 | -207 | -45.2-602% | 9.01 | -48.3 |
| CapEx | -2846 | -1060 | -268 | -75.2 | -79.1 |
| Adj FCF | -3194 | -1267 | -313 | -66.2 | -127 |
| ▸Interest expense | 132 | 80.2 | 19.8 | 34.8 | 24.7 |
| ▸Adj net income | -520 | -244 | -74.8 | -64.4 | -73.0 |
| ▸Owner's earnings | -300 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -1018 | -479 | -484 | -17.4 | 0.16100% | -38.8 |
| FCF (OCF−capex) | -4103 | -2449 | -1183 | -292 | -70.9 | -107 |
| Net income | -1556 | -658 | -661 | -72.4 | -73.4 | -90.8 |
| ▸Capital returned | -6646 | -1113 | -4888 | -516 | -95.8 | -33.2 |
| Buybacks | -1434 | -1190 | 129 | -189 | -136 | -47.3 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 229 | 69.9 | 80.2 | 19.8 | 34.8 | 24.7 |
| Debt paid down | -5442 | 7.33 | -5098 | -346 | 5.35 | -10.6 |
| ▸Reinvestment | 3747 | 2232 | 1127 | 185 | 78.0 | 125 |
| Capex (PP&E) | 3713 | 2231 | 1060 | 268 | 75.2 | 79.1 |
| Intangibles & M&A | 9.12 | 0.00 | 46.2 | -86.1 | 2.85 | 46.2 |
| Leases signed (net Δ) | 25.0 | 1.47 | 20.9 | 2.80 | -0.04 | -0.09 |
| Retained / other | 2764 | -1266 | 3739 | 329 | 56.8 | -95.2 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 164 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 8151 | 6558 | 788 | 378 | 318 |
| ▸Liabilities (total) | 7280 | 6418 | 543 | 156 | 200 |
| Net debt (incl. leases) | 5260 | 1954 | 217 | 70.0 | 128 |
| Net debt / Adj EBITDA | -- | -- | -- | -- | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -1.93 | -0.96 | -0.76 | -0.00 | -1.49 |
| Shares outstanding | 499 | 445 | 404 | 277 | 1.98 |
| Dilution (YoY) | +27.3% | +10.0% | +46.1% | +110.7% | +31.4% |
| Employees | 141 | 141 | 12.0 | 10.0 | 8.00 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 69.2%+18.9 | 50.9%-4.4 | 55.3%-5.6 | 60.9%+34.7 | 26.3% |
| Adj EBITDA margin | -133.4%-100.0 | -45.9%-35.1 | -10.7%-10.6 | -0.1%+244.2 | -244.3% |
| Adj OCF margin | -182.6%-63.0 | -122.8%-90.4 | -32.3%-45.2 | 12.9%+334.0 | -321.1% |
| Adj FCF margin | -1673.7%-1196.8 | -752.1%-528.5 | -223.6%-129.0 | -94.6%+752.6 | -847.2% |
| Net income margin | -410.9%-74.4 | -392.6%-340.9 | -51.7%+53.3 | -105.0%+498.9 | -603.9% |
| Adj NI margin | -272.3%-196.5 | -145.0%-91.6 | -53.4%+38.6 | -92.0%+393.7 | -485.8% |
| ROIC (adj, after-tax) | -4.8% | -2.5% | -8.2% | -6.7% | -14.0% |
| Cost of debt | 2.5% | 4.4% | 11.9% | 28.7% | 20.6% |
Earnings Calls
Earnings Call · 2026 Q2
TeraWulf’s second quarter and subsequent developments underscored its strategy of converting power-advantaged industrial sites into contracted high-performance computing infrastructure, delivering capacity in phases and recycling capital into larger projects under direct control. Execution was most visible at Lake Mariner. CB-3 was fully delivered and began generating lease revenue in early July, bringing total revenue-generating critical IT capacity at the campus to 102 megawatts. Completion also satisfied conditions for $600 million of Google credit support for FluidStack’s obligations to become effective. CB-4’s first data hall is in Level 2 commissioning, with Level 3 expected in mid-August and revenue generation targeted for late September. CB-5 is progressing toward initial energization in very early January. Management attributed schedule complexity to constrained electrical labor and evolving customer design requirements, but said a second electrical contractor and a peak workforce of approximately 1,000 electricians provide greater execution visibility. FluidStack lease amendments increased contracted capacity at CB-4 and CB-5 from 162 to 168 critical megawatts each, incorporated tenant-requested fit-out changes and updated data-hall delivery schedules. TeraWulf expects to contribute approximately $150 million for fit-out costs incurred through June 30, 2026, in exchange for more than $300 million of incremental rent over the initial 10-year term. Including the capacity increase, the amendments should add over $500 million of lease revenue. Management deliberately funded the changes with additional equity rather than maximum debt, supporting conservative leverage and stronger project deleveraging. Second-quarter revenue increased 32% sequentially to $44.8 million, primarily from additional HPC capacity. HPC lease revenue rose 52% to $31.9 million and represented 71% of total revenue. Reported HPC leasing margin was 28%, depressed by $2.8 million of tenant fit-out revenue and costs, $6.8 million of pre-revenue operating expenses and $6.0 million of development costs. Excluding those items, margin was approximately 80%, with management expecting progression toward its long-term 85% target as more capacity enters service. Adjusted EBITDA was negative $18.3 million, while GAAP net loss attributable to TeraWulf reached $939.9 million, mainly because of a $755.7 million noncash loss on Google warrants. Cash and restricted cash totaled approximately $3.0 billion at quarter end; parent unrestricted liquidity rose to roughly $1.45 billion after the initial Abernathy payment. Expansion accelerated in Kentucky. TeraWulf signed a 20-year lease with Anthropic for approximately 401 megawatts at Justified Data in Hawesville, representing about $19 billion of initial-term contracted revenue. The company also acquired Muskie, a gigawatt-scale Eastern Kentucky site supported by Kentucky Power and an approved tariff providing for 1 gigawatt of service. Initial power is expected in the fourth quarter of 2028, with potential expansion to 2 gigawatts. Demand for Muskie is robust, particularly for 2028 capacity, and management expects to finance it through conservatively leveraged project debt with a significant equity component. TeraWulf agreed to sell its 50.1% Abernathy interest for approximately $530 million, generating a reported 20% IRR and allowing capital and management focus to shift toward directly controlled assets. FERC also authorized the proposed Chesapeake acquisition, which includes 210 megawatts of existing generation and potential development of up to 1 gigawatt. Management reaffirmed annual contracting guidance of 250–500 megawatts, emphasizing deliverable contracted power rather than queue positions, regional diversification, labor availability, responsible regulation and customer credit quality. It said New York and Texas policy developments have not materially impaired demand and may favor experienced, well-capitalized developers.
▸What utility partnership structures should investors expect, and will utilities share project economics? Also, is TeraWulf’s lack of a direct lease with a highly investment-grade hyperscaler deliberate, and how would such a deal differ from existing arrangements?Nick Giles · B. Riley Securities
▸How does TeraWulf balance pursuing additional sites with digesting its current portfolio, and what limits expansion? What community, governmental and geographic factors guide market selection, and are certain regions preferred?Darren Paul Aftahi · Lucid Capital Markets
▸How large could TeraWulf’s pipeline become over the next decade beyond the current 2.9 gigawatts of line-of-sight capacity? How are Texas and New York timing or regulatory developments affecting demand, customer interest and pre-leasing?Michael Rollins · Citi
▸Where will the industry obtain enough electricians, HVAC trades and other workers for rapidly expanding data-center construction? Are labor and construction costs locked down, particularly for the Anthropic project, and how will TeraWulf compete for workers?Timothy Horan · Oppenheimer
▸How does demand for the potentially expanded 2-gigawatt Muskie campus compare with Hawesville, and how should investors think about financing Muskie?Logan Hennen · Northland
▸Can management provide more detail on the three to five sites in active pursuit or final diligence, including capacity, geography and energization timing? Also, what is the status and expected counterparty for credit support on the Hawesville Anthropic lease?Stephen Glagola · KBW
▸What drove the FluidStack lease modifications—higher costs, design changes or both? Why did TeraWulf increase equity rather than debt financing? Separately, how does management view the changing political environment in New York and Texas relative to West Virginia, Maryland and Kentucky?Christopher Brendler · Rosenblatt Securities
▸What contractual protections does TeraWulf have against rising electrical-labor and other construction costs, and how are those costs affecting development yields and returns?Michael Funk · Bank of America
SEC Filing Findings
SEC Filing — material findings
2026-08-05 · depth 10/10risk 8Liquidity/Covenants▸Muskie power agreements require posting of ~$631M in collateral (letters of credit or parent guaranty), with additional LOA collateral due in future periods; $295.3M of cash is pledged as cash collateral for a separate LC facility.
Muskie power agreements require posting of ~$631M in collateral (letters of credit or parent guaranty), with additional LOA collateral due in future periods; $295.3M of cash is pledged as cash collateral for a separate LC facility.
risk 7Hidden Liability▸Muskie acquisition includes $50M deferred cash due April 2027 and $90M contingent consideration already recognized as a liability, on top of $30M paid at closing.
Muskie acquisition includes $50M deferred cash due April 2027 and $90M contingent consideration already recognized as a liability, on top of $30M paid at closing.
risk 7Dilution▸Google Warrants for 73.58M shares at $0.01 strike drive large non-cash warrant liability; warrant fair-value losses of $972M in 1H26 are tied to stock price, and warrants are auto-exercised net if not exercised. Total warrant liability is $1.82B.
Google Warrants for 73.58M shares at $0.01 strike drive large non-cash warrant liability; warrant fair-value losses of $972M in 1H26 are tied to stock price, and warrants are auto-exercised net if not exercised. Total warrant liability is $1.82B.
risk 6Dilution▸Common stock warrants outstanding total 77.7M shares at weighted average strike of $0.10, a large near-zero-strike overhang relative to 499M shares outstanding.
Common stock warrants outstanding total 77.7M shares at weighted average strike of $0.10, a large near-zero-strike overhang relative to 499M shares outstanding.
risk 6Toxic Financing▸Convertible notes are classified as short-term because holders can convert; 2030 and 2031 notes are convertible on sale-price triggers, with $1.10B in short-term convertible notes and conversion prices of $8.48 and $12.43, well below the April 2026 offering price of $19.00.
Convertible notes are classified as short-term because holders can convert; 2030 and 2031 notes are convertible on sale-price triggers, with $1.10B in short-term convertible notes and conversion prices of $8.48 and $12.43, well below the April 2026 offering price of $19.00.
risk 6Liquidity/Covenants▸Revolving credit facility contains a minimum liquidity covenant and springing maturity; capacity limited to $75M until the first Fluidstack commencement date.
Revolving credit facility contains a minimum liquidity covenant and springing maturity; capacity limited to $75M until the first Fluidstack commencement date.
risk 6Liquidity/Covenants▸Company must fund completion guarantees for Lake Mariner HPC buildout and must fund ~$150M of Fluidstack fit-out costs, with additional Muskie collateral to come.
Company must fund completion guarantees for Lake Mariner HPC buildout and must fund ~$150M of Fluidstack fit-out costs, with additional Muskie collateral to come.
risk 6Customer Concentration▸HPC lease revenue is generated from only two customers, and the Anthropic Hawesville lease's credit support provider has not been disclosed.
HPC lease revenue is generated from only two customers, and the Anthropic Hawesville lease's credit support provider has not been disclosed.
upsideHidden Upside▸Abernathy JV 50.1% stake sold for ~$530M cash (vs $450M invested), with installments through April 2027, a stated gain-type premium to invested capital.
Abernathy JV 50.1% stake sold for ~$530M cash (vs $450M invested), with installments through April 2027, a stated gain-type premium to invested capital.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $9.00 | $3.10/$3.50 | 140 | $0.53/$0.57 | 14,310 |
| $10.00 | $2.51/$2.89 | 1,694 | $0.87/$0.90 | 15,584 |
| $11.00 | $2.04/$2.09 | 756 | $1.30/$1.34 | 20,854 |
| $12.00 | $1.57/$1.62 | 8,421 | $1.83/$1.99 | 15,617 |
| $13.00 | $1.21/$1.25 | 17,744 | $2.46/$2.50 | 18,813 |
| $14.00 | $0.91/$0.95 | 59,579 | $3.15/$3.40 | 5,628 |
| $15.00 | $0.67/$0.71 | 27,973 | $3.75/$4.00 | 7,172 |
| $16.00 | $0.49/$0.54 | 29,321 | $4.65/$4.90 | 18,461 |
Short Interest
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $406M | $5.64 | +$3.5M | +$56.3M | — | $5.69T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $324M | $14.43 | +$324M | +$324M | — | $1.91T |
| LONE PINE CAPITAL LLC | $287M | $13.04 | +$266M | +$287M | +2.3% | $12.54B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $226M | $14.43 | +$226M | +$226M | — | $4.04T |
| MARSHALL WACE, LLP | $135M | $11.77 | +$89.3M | +$116M | -0.2% | $92.71B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $123M | $3.55 | +$2.1M | +$1.6M | -0.1% | $1.61T |
| Value Aligned Research Advisors, LLC | $113M | $13.99 | +$96.8M | +$113M | +10.7% | $8.44B |
| TWO SIGMA INVESTMENTS, LP | $113M | $7.12 | +$56.0M | +$86.4M | +0.0% | $117.03B |
| STATE STREET CORPPassive | $110M | $4.08 | +$3.8M | +$2.8M | -0.2% | $2.89T |
| SCOGGIN MANAGEMENT LP | $108M | $7.07 | +$17.0M | +$46.9M | -1.1% | $254M |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
| Ticker | Name | Co-holders | Score |
|---|---|---|---|
| CIFR | Cipher Mining Inc. | 5 | 183.11× |
| BKV | BKV Corporation | 3 | 85.45× |
| HUT.TO | Hut 8 Mining Corp. | 6 | 69.92× |
| CORZ | Core Scientific, Inc. | 7 | 52.78× |
| TLN | Talen Energy Corporation | 6 | 34.18× |
| SATS | EchoStar Corporation | 6 | 20.51× |
| VST | Vistra Corp. | 4 | 15.30× |
| BE | Bloom Energy Corporation | 3 | 11.48× |
| AMAT | Applied Materials, Inc. | 3 | 2.63× |
| MU | Micron Technology, Inc. | 3 | 2.58× |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2022 Q2 | 0M | -59M | -59M | $-0.14 | $-0.22 – $-0.08 | 1 |
| 2022 Q3 | 5M | -41M | -42M | $-0.10 | $-0.16 – $-0.05 | 1 |
| 2022 Q4 | 9M | -41M | -47M | $-0.11 | $-0.17 – $-0.06 | 1 |
| 2023 Q1 | 15M | -11M | -17M | $-0.04 | $-0.06 – $-0.02 | 1 |
| 2023 Q2 | 19M | -7M | -14M | $-0.03 | $-0.05 – $-0.02 | 1 |
| 2023 Q3 | 20M | -5M | -14M | $-0.03 | $-0.05 – $-0.02 | 3 |
| 2023 Q4 | 24M | -1M | -10M | $-0.02 | $-0.02 – $-0.02 | 3 |
| 2024 Q1 | 45M | 32M | 16M | $0.04 | $0.03 – $0.06 | 3 |
| 2024 Q2 | 35M | 7M | -8M | $-0.02 | $-0.07 – $0.04 | 3 |
| 2024 Q3 | 32M | 1M | -15M | $-0.03 | $-0.05 – $-0.02 | 7 |
| 2024 Q4 | 39M | -2M | -17M | $-0.03 | $-0.04 – $-0.01 | 4 |
| 2025 Q1 | 41M | -24M | -40M | $-0.07 | $-0.21 – $0.14 | 2 |
| 2025 Q2 | 47M | -12M | -32M | $-0.06 | $-0.09 – $-0.03 | 5 |
| 2025 Q3 | 53M | 3M | -25M | $-0.04 | $-0.07 – $-0.03 | 4 |
| 2025 Q4 | 45M | -46M | -76M | $-0.13 | $-0.27 – $-0.02 | 5 |
| 2026 Q1 | 35M | -79M | -110M | $-0.19 | $-0.36 – $-0.10 | 5 |
| 2026 Q2 | 46M | -117M | -140M | $-0.24 | $-0.38 – $-0.13 | 3 |
| 2026 Q3 | 62M | -73M | -105M | $-0.18 | $-0.34 – $0.05 | 4 |
| 2026 Q4 | 93M | -56M | -90M | $-0.16 | $-0.24 – $-0.07 | 5 |
| 2027 Q1 | 157M | -34M | -72M | $-0.13 | $-0.19 – $-0.08 | 2 |
| 2027 Q2 | 207M | -11M | -55M | $-0.10 | $-0.14 – $-0.06 | 1 |
| 2027 Q3 | 220M | -5M | -56M | $-0.10 | $-0.14 – $-0.06 | 1 |
| 2027 Q4 | 267M | 12M | -47M | $-0.08 | $-0.12 – $-0.05 | 1 |
| 2028 Q1 | 359M | 77M | 6M | $0.01 | $0.01 – $0.02 | 1 |
| 2028 Q2 | 446M | 124M | 37M | $0.06 | $0.04 – $0.09 | 1 |
| 2028 Q3 | 490M | 152M | 49M | $0.09 | $0.05 – $0.12 | 1 |
| 2028 Q4 | 497M | 153M | 36M | $0.06 | $0.04 – $0.09 | 1 |
| 2029 Q1 | 557M | 164M | 30M | $0.05 | $0.03 – $0.07 | 1 |
| 2029 Q2 | 586M | 190M | 39M | $0.07 | $0.04 – $0.10 | 1 |
| 2029 Q3 | 612M | 209M | 41M | $0.07 | $0.05 – $0.10 | 1 |
| 2029 Q4 | 638M | 232M | 46M | $0.08 | $0.05 – $0.11 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-09-15 | BUY | Bucella Michael C. | director | 6,085 | $14.79 | $90K | $5.19M |
| 2026-09-08 | SELL | Motz Catherine J. | director | 56,023 | $17.81 | $998K | $2.73M |
| 2026-08-31 | SELL | Carter Walter E. | director | 130,626 | $15.14 | $1.98M | $3.47M |
| 2026-08-27 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 137,500 | $17.06 | $2.35M | $64.95M |
| 2026-08-17 | BUY | Bucella Michael C. | director | 2,860 | $17.47 | $50K | $6.02M |
| 2026-08-14 | BUY | Bucella Michael C. | director | 3,023 | $16.54 | $50K | $5.65M |
| 2026-06-29 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 137,500 | $26.60 | $3.66M | $104.92M |
| 2026-05-27 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 166,650 | $25.92 | $4.32M | $105.80M |
| 2026-05-26 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 166,650 | $24.43 | $4.07M | $103.81M |
| 2026-04-28 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 79,200 | $20.62 | $1.63M | $18.24M |
| 2026-04-27 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 137,500 | $20.80 | $2.86M | $20.04M |
| 2026-04-24 | SELL | Khan Nazar M. | director, officer: Chief Technology Officer | 452,152 | $0.00 | $0 | $0 |
| 2026-03-25 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 137,500 | $16.96 | $2.33M | $3.67M |
| 2026-03-24 | SELL | Prager Paul B. | director, officer: Chief Executive Officer | 137,500 | $16.10 | $2.21M | $5.70M |
| 2026-03-20 | BUY | Bucella Michael C. | director | 1,665 | $15.04 | $25K | $4.21M |
| 2026-03-19 | BUY | Bucella Michael C. | director | 1,670 | $14.96 | $25K | $4.16M |
| 2026-03-18 | BUY | Bucella Michael C. | director | 1,581 | $15.79 | $25K | $4.37M |
| 2026-03-17 | BUY | Bucella Michael C. | director | 1,584 | $16.00 | $25K | $4.40M |
| 2026-03-17 | SELL | Fleury Patrick | officer: Chief Financial Officer | 600,000 | $16.14 | $9.68M | $0 |
| 2026-03-11 | BUY | Bucella Michael C. | director | 1,338 | $14.91 | $20K | $4.08M |
v2 analysis (legacy, 2026-08-05) — for comparison onlyclick to expand
Thesis
TeraWulf is attempting a high-risk but potentially valuable conversion from bitcoin mining to contracted HPC infrastructure. The strongest part of the story is not the speculative pipeline; it is the evidence that Lake Mariner is beginning to produce HPC lease revenue and that customers are willing to sign long-duration contracts for scarce, deliverable power. The Anthropic agreement materially expands the opportunity set, while Google-backed FluidStack obligations improve counterparty quality. The business is nevertheless far from a normal infrastructure company. TTM adjusted EBITDA and OCF are deeply negative, capex is enormous, dilution is substantial, and stock compensation is unusually large relative to revenue. Management also faces execution risk from electrical labor, design changes, power availability, permitting and project financing. The balance sheet currently appears liquid, so the principal risk is not immediate insolvency but permanent dilution and poor returns on capital if projects are delayed or overbuilt. I expect rapid reported revenue growth and a transition to positive EBITDA over the next two years, but only moderate confidence that accounting EBITDA will translate into owner earnings. The valuation therefore depends heavily on successful commissioning and the market continuing to value contracted HPC capacity at infrastructure-like multiples.
Trade Signal
Short bias: at $18.07, the stock prices a successful AI-infrastructure transformation despite negative owner earnings, extreme dilution and a study-based fair value near $11.19 per share.
The stock rose from $11.49 at the end of 2025 to a $28.98 June high as the market capitalized the AI-hosting strategy, FluidStack/Google support, Kentucky site acquisitions and expanding contracted capacity. It then fell 38% from the high to $18.07, including a 30% three-month decline and a 19% one-month decline, amid broad de-risking and concern over execution, financing and dilution. The latest earnings reaction was only -4% from $18.88 to $18.07 despite the company reporting stronger HPC revenue and major contracted developments, suggesting the market is beginning to discount the story but has not fully repriced it. The recent decline is partly a justified durable repricing from speculative peak valuation, not a pure panic overshoot; the remaining gap versus the analyst's $11.19 fair value and $7.87 risk-adjusted target is still a potentially temporary downside dislocation, though high volatility and positive commissioning news can interrupt it.
The stock is loved by sell-side analysts and remains a high-attention AI/data-center proxy, with a consensus Buy and targets far above the current price. Bulls point to scarce power, Google-backed FluidStack obligations, Anthropic demand and rapid Lake Mariner execution. Bears focus on negative owner earnings, extreme P/S, project and permitting risk, equity dilution, customer-design changes and the gap between contracted capacity and commissioned cash-generating assets. Positioning is conflicted: short interest is very high at 27.3% of float, options imply roughly 104-108% volatility, call open interest exceeds puts, and retail trading is elevated. The bullish narrative is therefore crowded in attention but vulnerable to sharp short-covering rallies; it also appears stale on dilution and cash-return economics.
There is a real operational inflection at Lake Mariner: CB-3 is producing lease revenue, CB-4 is nearing revenue commencement and CB-5 is targeted for early 2027. That is better than the historical bitcoin-mining profile. However, the market already broadly expects an AI-infrastructure transformation: 28 analysts show a consensus Buy and a $30.69 target, while the stock has risen 257% over one year. The analyst's base case expects positive EBITDA and owner earnings, but consensus estimates supplied in the study still show negative EBITDA through 2029, highlighting unusually poor earnings visibility. The next operational prints could improve the story, but they do not clearly represent an unpriced step-up relative to the valuation.
- ▲2026-11 · Q3 2026 earnings and Lake Mariner ramp update — The market will test whether CB-3 revenue growth and HPC margins are progressing toward management's roughly 80-85% normalized margin framework.
- ▲late 2026-09 · CB-4 Level 3 commissioning and first revenue — Revenue commencement targeted for late September; successful delivery would validate the FluidStack deployment schedule and Google-backed lease economics.
- ▲2027-01 · CB-5 initial energization — Initial energization is targeted for very early January; delay, cost escalation or further tenant-design changes would challenge the ramp thesis.
- ▲H2 2026 · Additional Anthropic/Hawesville contracting and project financing — Conversion of the 401 MW lease into financed, deliverable construction would add credibility, but also expose the company to substantial equity and debt funding needs.
- ▼H2 2026 · Morgantown FERC and environmental review — Challenges concerning disclosure of Google's warrant interest, transmission cost allocation and environmental issues could delay or block the planned Maryland expansion.
- ▼next 6-12 months · Capital raises, warrants and equity-funded fit-out — The company has already chosen additional equity to fund expansion; further financing could pressure per-share value even if enterprise value grows.
Strongly negative net share flow. TTM dilution is approximately 29%, management is funding project fit-outs with equity, and insider selling totaled roughly $31.4 million versus negligible purchases. Passive ownership and high retail participation can support demand, but the 27.3% short interest creates squeeze risk rather than durable fundamental buying pressure.
There is meaningful liquidity and some value in contracted Lake Mariner capacity, customer credit support and power-secured sites, but cash is not a hard floor because a large portion is restricted or required for aggressive development and fit-out spending. The company remains cash-burning, has negative owner earnings and substantial execution liabilities. Above the current price, the main ceiling is valuation: the stock already capitalizes a highly successful AI-infrastructure ramp, while dilution and insider selling can increase into strength. There is no committed bid or active buyback to create a firm downside anchor.
High but speculative. AI-infrastructure scarcity, Google-backed customer credit, long-duration contracts and strong retail/institutional attention can attract marginal buyers; however, the 29% TTM dilution, negative owner earnings and execution risk make it unsuitable for fundamental long-only buyers without strong risk tolerance.
Fear pulls stronger than greed at $18.07. The operating story is genuinely improving, but the stock price assumes a successful transition to a profitable infrastructure platform well before owner earnings, dilution and project-financing risks are resolved. I would prefer a defined-risk short or put structure because the bull case can still produce sharp squeezes on commissioning news.
Valuation
The quarter provided fresh evidence that the HPC transition is operating rather than merely prospective: revenue rose sequentially to $44.8M, HPC lease revenue reached $31.9M, CB-3 was delivered and began generating rent, and total revenue-generating Lake Mariner capacity reached 102 MW. The newly signed 401 MW Anthropic lease at Hawesville and the expanded FluidStack amendments also increased contracted demand. Against that, the quarter disclosed continuing negative adjusted EBITDA, substantial fit-out funding and a deliberate choice to use equity rather than debt for part of the expansion.
▸ How the cases moved
The bull case rises from approximately $13,000M to $14,900M as CB-3 reached revenue generation, FluidStack's Google credit support became effective after delivery conditions were met, and the Anthropic Hawesville contract expanded the credible contracted-capacity pipeline. The base case rises from approximately $5,700M to $6,400M because HPC revenue reached $31.9M in the quarter and 102 MW is now revenue-generating, although the negative quarterly EBITDA and additional equity funding limit the increase. The bear case is broadly unchanged at approximately $2,500M: schedule, labor, fit-out and dilution risks remain material. Bear probability increases modestly from 0.28 to 0.30 because of cost and execution disclosures; base probability falls from 0.52 to 0.50; bull probability remains 0.20.
HPC deployment is slower and more expensive than planned, with labor, power, permitting and customer-design changes delaying CB-4/CB-5 and the Kentucky pipeline. Existing contracts generate meaningful revenue, but capex remains heavy and returns are diluted by continued equity compensation and share issuance. By year two, the company is profitable on an EBITDA basis but produces only modest owner earnings because maintenance and fit-out spending remain high.
▸ Valuation
5x $200M EBITDA = $1,000M EV − (-$1,500M net debt) = $2,500M equity
Lake Mariner ramps substantially, with CB-3, CB-4 and CB-5 contributing contracted lease revenue, while the Anthropic Hawesville project progresses into construction and financing. TeraWulf reaches a credible contracted HPC platform, although Kentucky and other large projects consume considerable capital. Revenue growth is very high from a small base, EBITDA margins improve as pre-revenue costs roll off, and owner earnings become positive but remain below EBITDA because of ongoing development capex and stock compensation.
▸ Valuation
8x $650M EBITDA = $5,200M EV − (-$1,200M net debt) = $6,400M equity
TeraWulf executes the Lake Mariner buildout close to schedule, converts Anthropic and Muskie demand into financed, contracted capacity, and benefits from the scarcity value of deliverable power. Contracted HPC revenue scales rapidly, project-level financing funds much of the expansion, and the business earns infrastructure-like margins with strong customer credit support. Capital intensity falls relative to operating cash flow as completed facilities begin producing rent, allowing owner earnings to approach EBITDA after development spending normalizes.
▸ Valuation
12x $1,200M EBITDA = $14,400M EV − (-$500M net debt) = $14,900M equity
▸ Target Rationale
The probability-weighted, discounted scenario value is $5,544M, but I set the analytical target at $5,000M. The discount reflects the unusually poor current cash earnings, high capex intensity, dilution from warrants and stock compensation, and the gap between management's capacity ambitions and demonstrated owner earnings. The balance sheet and contracted customer relationships support a value above a distressed or bitcoin-only assessment, but the target does not give full credit to the speculative pipeline until projects are commissioned and cash returns are visible.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Results & Credit Facility: TeraWulf reported Q1 2026 revenue of $34.0 million, which included $21.0 million in high-performance computing (HPC) lease revenue. The company maintained a robust liquidity position with $3.1 billion in cash and restricted cash at quarter-end. Additionally, it closed a $250 million revolving credit facility backed by a syndicate of global banks.
- Kentucky Expansion Sites: In May 2026, TeraWulf acquired two major pipeline sites. It secured the Hawesville site with immediate access to 480 MW of grid power, followed by the acquisition of the 285-acre Muskie Data Campus from Industrial Equity Partners. The Muskie site is expected to support over 1 GW of HPC/AI capacity over time, with the first 500 MW targeted for delivery in the second half of 2028.
- Morgantown, Maryland Acquisition Plans: In February 2026, TeraWulf announced plans to acquire the 250-acre Morgantown Generating Station in Maryland to build up to 1 GW of data center capacity.
- Capital Raises: In April 2026, the company closed an upsized common stock offering to fund ongoing digital infrastructure and HPC-AI developments.
- Hardware & Cooling Partnership: On May 26, 2026, TeraWulf announced a major partnership with Schneider Electric and Motivair, who delivered over $290 million in advanced liquid cooling and integrated power infrastructure solutions to support the rapid AI buildout at the Lake Mariner campus.
▸ Thesis-test Findings
Morgantown Maryland data center FERC approval status 2026
In February 2026, TeraWulf applied for FERC authorization (Docket No. EC26-58) to acquire the former coal-fired Morgantown Generating Station in Maryland from GenOn. However, the regulatory process has hit significant roadblocks. On April 1, 2026, public interest groups including Public Citizen, the NAACP, and the Port Tobacco River Conservancy urged FERC to reject the purchase. They argue the applicants failed to disclose Google's 14% warrant-backed equity interest in TeraWulf, which represents a material omission under FERC’s Section 203 rules regarding affiliate relationships. Furthermore, local environmental protests and complaints from the Maryland Office of People's Counsel regarding transmission cost allocation are adding to the friction. This constitutes a bear case development, as regulatory and legal challenges could significantly delay or block the planned 1 GW development.
Fluidstack Google AI hosting deployment timeline Lake Mariner
TeraWulf is executing on an accelerated timeline at its flagship Lake Mariner, NY campus. Under its 10-year contracts with AI cloud platform Fluidstack—which are backed by a $3.2 billion Google lease guarantee—TeraWulf is deploying roughly 360 MW of critical IT load. As of Q1-end, Phase One is well underway with 60 MW of HPC capacity already energized and generating revenue. The CB-3 building is nearing completion for customer hardware deployment, while the CB-4 and CB-5 buildings (the latter adding 160 MW) are both tracking on schedule for delivery and rent commencement in late 2026. This round-the-clock deployment supported by Schneider Electric is reportedly the fastest ongoing data center build in the U.S., which strongly supports the bull case for rapid revenue generation and swift infrastructure execution.
PJM grid capacity constraints and power price forecasts 2026 2027
The PJM Interconnection region is facing unprecedented power supply tightness. PJM’s 2026/2027 capacity auction cleared at a record-breaking $329.17/MW-day, hitting the newly established market price cap of $120,147/MW-year (up from $28.92/MW-day in 2024/2025). While PJM's January 2026 load forecast offered some near-term paper relief by enforcing stricter commitment guidelines for large loads, physical grid congestion is extremely severe due to retiring fossil plants and booming data center demands. This environment has two distinct impacts:
- Bear Case Impact: Sharp capacity price spikes and tightening grid interconnection rules (highlighted by FERC's June 2026 "show cause" orders regarding large load integration) present elevated power cost and interconnection risks for TeraWulf's PJM-integrated pipeline sites, including its Pennsylvania Nautilus site, newly acquired Kentucky campuses, and the contested Maryland site.
- Bull Case Impact: This severe power deficit validates the immense premium on TeraWulf’s NYISO-connected Lake Mariner campus in upstate New York. Because Lake Mariner is insulated from PJM’s acute price spikes and secures low-cost hydro power, the grid constraints elsewhere make its pre-secured, zero-carbon power capacity exceptionally valuable.