B

Barrick Mining Corporationv3 4.5/10 · 2026-11-08
Basic Materials·Gold
$36.54
$55.2B market cap
2.3% div yield
v3 Rating
4.5/103.5–5.5
Setup
5.5/104.0–7.0
Fair Value
$36.00$24.00–$52.00-1%
DCF (10%)
$33.50-8%
Base IRR
+5%-4%–+17%
Visibility
moderate±39%
Wall Street
$51.63 target(4 analysts last quarter)(15 buy, 10 hold)
Rating
Revenue (TTM)
$21.5B
Owner Earnings
$5.2B
Next-Yr Owner Earnings
$3.4B
Growth
+6.0% × 8y
P / Next-Yr OE
17.7x
Net Debt
-$2.5B

Barrick Mining Corporation primarily focuses on the entire lifecycle of mineral assets, from their initial discovery and subsequent development to their extraction and eventual sale. The company actively explores for a variety of commodities, including precious metals like gold and silver, industrial metals such as copper, and other materials used for energy production. Previously identified as Barrick Gold Corporation, the organization officially adopted its current name, Barrick Mining Corporation, in May 2025. The company was founded in 1983 and has its corporate headquarters situated in Toronto, Canada.

2-Year Price History

$40.34+151.0%
$20$25$30$35$40$45$50volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-08

Rating
4.53.5–5.5
Setup
5.54.0–7.0
Fair value (USD)
36.0024.00 – 52.00
Upside vs 36.54
-1%
DCF (10%)
33.5020.00 – 52.00-8%
Base IRR
5%-4% – 17%
Visibility
moderaterange ±39%
Sentiment
7/10
2026-11-08 · · priced at 40.56

Barrick is the world's #2 gold producer (~3.1Moz attributable gold + ~210kt copper), now run by a new team that has hit production and cost guidance three quarters in a row, settled Mali, settled the Newmont/Nevada JV dispute for $1.95bn of cash plus a near-100Moz combined Nevada complex, and doubled capital returns (quarterly $0.175 dividend plus a year-end top-up to 50% of attributable FCF, $3bn buyback with $1.21bn done in Q2). The pack's quote is stale: last close was $40.56 on Friday 6 Nov (NYSE, USD), with Q3 results due the very next trading day, Monday 9 Nov. On the screen it is the cheapest senior gold: ~11x 2026 adjusted EPS of ~$3.60 and ~5x consolidated EV/EBITDA. But the owner-earnings math is much less exciting: of roughly $12.6bn of consolidated 2026 EBITDA, ~$2.8bn goes to minorities, ~$2.3bn to cash taxes, ~$2.0bn to sustaining capex and ~$2.0bn to project capex, leaving about $3.4bn of attributable free cash flow — a 5.1% yield on a $66.7bn market cap, i.e. ~19x FCF, in the best gold-price year in history (realized $4,417/oz in Q2 against $1,866 AISC). And the capex is not really growth capex: attributable production has fallen every single year since 2019 (5.5Moz to ~3.1Moz) on well over $20bn of spending, so most of that bill is maintenance by the brief's own test. Holding gold flat at ~$4,100-4,300 with 4% cost inflation I get FCF of $3.4bn/$3.7bn/$4.2bn/$4.6bn/$5.0bn over 2027-31 and a 10% DCF at a 12x year-5 multiple of ~$33.5/share; 'today repeated forever' gives the same ~$33. Fair value $36 — a little above the flat-gold DCF for the embedded gold call option and the un-modellable Fourmile, below the price. Sentiment is 7/10: gold is the consensus macro long of 2026 with banks publishing $4,800-6,300 2027 targets, short interest is 0.9%, the sell side is Buy with a ~$50 average target. That is a crowd, not blood on the ground, and the chairman is simultaneously forcing a 10% IPO of the crown-jewel Nevada assets over the public objection of Van Eck and Mackenzie while the CEO decamps to run the sub and the parent has no named CEO. Rating 4.5: a sound, net-cash business at a fair-to-full price that only makes 50% if gold does the work. Research rating 5.5 — Fourmile's un-filed technical report and the IPO print are genuine, resolvable information gaps worth a look, but the core variable (the gold price) is not something more work can settle.

A deep dive would have to establish: What is Fourmile really worth once a technical report exists (and what did the $4bn Newmont package implicitly pay for 38.5% of it), at what price does the 10% North America IPO actually print now that it is slipping to 2027 against shareholder opposition, and can $3.5-4bn a year of capex finally hold attributable production flat after six straight years of decline?

Owner earnings, TTM
$5.2B$4.2B – $6.3B
Realistic peak profit
$9.0B$6.0B – $14B
Growth rate
6.0%0.0% – 14.0%
Years of growth
83 – 15
Market cap
$67B$64B – $70B
EV
$64B$62B – $67B
Net debt
-$2.5B-$4.5B – -$500M
Capital return / cap
420000.0%300000.0% – 550000.0%
P/E
11.3×9.5× – 14.0×
EV/EBITDA
6.5×5.5× – 8.0×
FCF yield
5.1%3.0% – 7.2%
Projected FCF, base case (USD millions)
Y1$3.4B$2.2B – $4.9B
Y2$3.7B$2.2B – $5.5B
Y3$4.2B$2.4B – $6.3B
Y4$4.6B$2.5B – $7.0B
Y5$5.0B$2.6B – $7.8B
Competition: Gold is a price-taker business so Barrick competes for capital rather than customers against Newmont, Agnico Eagle and AngloGold, and its only durable edges are Nevada/Fourmile ore grade and jurisdiction — offset by a rest-of-world book (Mali, DRC, Tanzania, Zambia, Pakistan) that the planned IPO leaves concentrated in the parent you would be buying.
Governance: Chairman John Thornton is forcing a 10% IPO of the crown-jewel North American assets over the public objection of major holders (Van Eck, Mackenzie) and has twice refused a tax-free spin-off, the CEO is leaving the parent to run the sub with no named parent CEO, management collared ~10% of production after years of saying it never hedges, and the safety record (three fatalities in Q3 2025, six lost-time injuries in Q2 2026) plus $430m and a further $448m paid to Mali show how little control it has over its non-US jurisdictions.
Research (expand)

What the company does

Barrick Mining (NYSE: B / TSX: ABX, renamed from Barrick Gold in May 2025, HQ Toronto, reports in USD) is the world's second-largest gold producer. 2026 attributable output is guided at 2.90-3.25Moz of gold and ~200-230kt of copper from:

  • Nevada Gold Mines (61.5%, operated) — Carlin, Cortez, Turquoise Ridge, Goldrush, and as of August 2026 also Fourmile, Fiberline and Mike. Newmont holds 38.5%. NGM plus Pueblo Viejo were 53% of attributable adjusted EBITDA in Q2 at a 61% margin.
  • Pueblo Viejo, Dominican Republic (60%) — expansion on schedule, 90% of resettlement packages accepted.
  • Rest of world — Loulo-Gounkoto, Mali (80%, back under Barrick control after the 2025 settlement); Kibali, DRC (45%); Veladero, Argentina (50%); Lumwana, Zambia (100%, mill expansion doubling copper, first production end-Q1 2028); Tongon, North Mara, Bulyanhulu; and Reko Diq, Pakistan (50%, under security review, first production now slipping toward 2030).

Chairman John Thornton. Mark Hill became CEO in October 2025 after Mark Bristow's abrupt exit; Hill has since been named CEO of the North American company to be floated, and the parent's CEO is still unnamed. CFO is Hongyu (Helen) Cai.

The investment case as the bulls put it

1. Cheapest senior gold. ~11.3x Scotiabank's $3.60 2026 adjusted EPS, ~5x consolidated EV/EBITDA, roughly 0.9x risked NAV — a large discount to Agnico and Newmont, with a dividend yield more than double the closest peer.

2. A fixed company. Three consecutive quarters of hitting guidance after years of misses. Q2 2026: 796koz attributable gold (3% above guidance, +11% q/q), realized gold $4,417/oz (+34% y/y), AISC $1,866/oz, attributable adjusted EBITDA $2.55bn (+51%, 60% margin), net earnings $1.22bn (+50%), adjusted EPS $0.82, operating cash flow $1.70bn (+28%). Record underground tonnes at Cortez, Goldrush ramping, Loulo ahead of schedule, PV recovered faster than expected after the Q1 shutdown. Lumwana and the PV expansion on time and on budget — genuinely rare in mining.

3. Balance sheet and returns. $1.2bn net cash at Q2, plus $1.95bn from Newmont received in Q3, an undrawn $3bn revolver and no meaningful maturity until 2033. Policy is a $0.175 quarterly base dividend plus a year-end top-up to 50% of attributable FCF; $3bn buyback authorised in Q1 with $1.209bn executed in Q2. Shareholder returns were $1.50bn in Q2, +242% y/y, and ~$3bn across the first three quarters of the new management's tenure.

4. Two catalysts. The Newmont deal (August 2026) vended Fourmile, Fiberline and Mike into NGM, settled every outstanding dispute, bought Newmont's consent for the IPO and paid Barrick $1.95bn of cash — a ~$4bn total package by Hill's description, and it unblocks a redesign of Nevada processing (Hill floated a ~$2.5bn roaster/autoclave to stop trucking ore across the state). And the 10% IPO of Barrick North America, which the press has valued at $42-60bn+ for an entity inside a $66.7bn parent.

5. Fourmile. 600-750koz/yr at a conceptual $650-700/oz AISC (add ~$100 at today's gold price for royalties and profit share) on a $1.5-1.7bn capital estimate. At $4,000 gold that is roughly $2.4bn/yr of margin from one mine. No technical report has been filed, so nobody can model it — Anita Soni of CIBC said on the Q2 call that this is itself why the stock fell 7% on the day.

What it actually earns today

Start from the EBITDA and follow the money, because in gold mining very little of it reaches the owner.

2026E consolidated adjusted EBITDA is roughly $12.6bn; attributable adjusted EBITDA roughly $9.8bn (Q2 actual $2.55bn, H2 production higher but Q3 LBMA gold averaged $4,262 and Q4 is tracking near $4,100 against Q2's realized $4,417).

From consolidated EBITDA:

  • ~$2.8bn to minority partners (Newmont's 38.5% of NGM, the PV, Loulo and Kibali minorities)
  • ~$2.3bn of cash income taxes
  • ~$0.2bn corporate administration
  • ~$2.0bn of attributable minesite sustaining capex and capitalised stripping (inside the $1,866/oz AISC)
  • ~$2.0bn of attributable project capex (total attributable capex guidance $3.8-4.2bn, cut from $4.0-4.45bn when Reko Diq slowed)

Unlevered owner earnings before growth capex ≈ $5.5-5.7bn. Cross-check from the top: 3.10Moz x ($4,250 realized - $1,870 AISC) = $7.4bn of gold AISC margin, plus ~$0.8bn from copper, less $2.3bn of cash tax and $0.2bn of admin = $5.7bn. Interest is immaterial (net cash), SBC is ~$70m and already inside the numbers.

After all capex, attributable free cash flow is about $3.3-3.5bn. H1 2026 was $1.4bn, depressed by the annual tax and interest payments and a one-off $400m (plus a further $448m demanded in July) retroactive Malian royalty settlement for 2024-25; Q2 ex-one-off was ~$540m. For 2025 the comparable figure was $2.837bn attributable ($3.87bn consolidated FCF on $7.69bn operating cash flow and $16.96bn of revenue).

So: ~27% of consolidated EBITDA reaches the owner. EV ~$64bn (market cap $66.7bn on ~1.645bn shares after buybacks, less ~$2.5bn net cash) against $5.5bn of pre-growth-capex owner earnings is ~11.5x; against $3.4bn of after-everything FCF it is ~19x, a 5.1% yield. The headline 5x consolidated EV/EBITDA is an illusion created by minorities, tax and capex.

And here is the part I weight most heavily. The brief's reinvestment-treadmill test says that spending needed just to hold profit is maintenance, not growth. Barrick's attributable production has fallen every year since 2019: 5.5Moz (2019), 4.8, 4.4, 4.14, 4.05 (2023), 3.91 (2024), 3.26 (2025), ~3.1Moz guided for 2026 — while spending well over $20bn of capex. Some of that is deliberate pruning (Donlin, Tongon, Hemlo sold) and Mali's 2025 shutdown, but the direction is unmistakable: the capex bill is not buying growth, it is losing a race against depletion. On that reading almost the whole $3.8-4.2bn is maintenance, owner earnings are closer to $3.5bn than $5.7bn, and I centre `current_profit` at $5.2bn only because Lumwana's mill expansion and Reko Diq genuinely are new capacity.

The second thing the numbers show is cost leakage. Gold's realized price rose 29% in 2026 and attributable FCF went from $2.84bn to ~$3.4bn — a 20% gain. AISC rose 11%, production fell 5%, capex rose, and royalties and profit-share scale with the gold price (the 2026 cost guidance is set at a $4,500/oz assumption). Operating leverage in gold mining is far weaker than the slide decks imply.

Projected free cash flow, 2027-2031

Attributable, before interest, after stock comp, after all reinvestment. Base case holds gold at ~$4,100-4,300 (near spot $4,070, well below the street's $4,800-6,300 2027 targets), copper ~$4.80/lb, cost inflation 4%/yr, attributable capex $3.3-3.8bn/yr as Lumwana and PV finish and Fourmile's declines, a possible Nevada roaster and an eventual Reko Diq restart take their place.

| year | attributable FCF |

|---|---|

| 2027 | $3.4bn |

| 2028 | $3.7bn (Lumwana copper from end-Q1) |

| 2029 | $4.2bn |

| 2030 | $4.6bn |

| 2031 | $5.0bn |

The honest caveat: ±$500/oz on gold is ±$1.55bn pre-tax and ±$1.1bn of after-tax FCF, about ±30% of the base. That dominates everything management does. The ranges in the JSON are wide for exactly that reason.

What it is in five years

In 2031 Barrick should be a ~3.3-3.5Moz gold producer with a doubled Lumwana (a materially more copper-weighted company), Fourmile in construction or early ramp, Reko Diq possibly starting, ~89Moz of reserves and 25+ years of mine life, net cash, and a 50%-of-FCF payout policy. It is neither a corpse nor a compounder: a 2-4% volume grower with very long-dated but very low-visibility cash flows. The market pays that category 10-14x free cash flow — gold majors have historically earned 6-8x EBITDA and low-teens FCF multiples precisely because the cash is price-taking and capital-hungry. I use 12x on year-5 FCF (range 8-18x). No penalty for terminal weight here; this is the category multiple, not a haircut.

Confidence: high on survival and reserve life, low on the level of the cash flow, because 85% of it is a gold-price function.

Fair value and the multiples we are paying

DCF at 10%: PV of 2027-31 FCF = $15.5bn. Year-5 value = $5.0bn x 12 = $60bn, discounted = $37.3bn. EV = $52.8bn, plus $2.5bn net cash = $55.3bn equity on ~1.645bn shares = $33.5/share.

Today repeated forever (the mature-company lens): $5.2bn of unlevered owner earnings / 10% = $52bn, plus $2.5bn net cash = $54.5bn = $33/share. The two methods agree, which is reassuring. The equity earns about 8% a year if nothing changes — at a gold price that is itself near an all-time high.

Durability check: reserves are long (25+ years), customer concentration is nil (gold is sold at spot), leverage is nil, and the decline in output has been arrested but not reversed. The weak points are jurisdictional (Mali took $430m plus $448m; the DRC, Tanzania, Zambia, Argentina and Pakistan are all in the stub parent after the IPO) and cost inflation.

Multiples at $40.56: ~11.3x 2026 adjusted EPS; 6.5x attributable / ~5.1x consolidated 2026 EV/EBITDA; ~11.5x EV/unlevered owner earnings; ~19x EV/FCF for a 5.1% FCF yield; ~6% of market cap coming back as dividends plus buybacks in 2026.

Fair value $36. I put it a little above the flat-gold DCF, not below it, because of three things the DCF cannot carry: the embedded call on gold (the street's 2027 forecasts are $4,800-6,300, and gold printed ~$5,000 in February 2026); Fourmile, which no one can model because the technical report was never filed and which Hill clearly believes is worth billions; and a possible IPO re-rating. But $36 is below $40.56. At today's price you are already paying for gold to go higher.

Management, governance and competition

The good. The operating turnaround is real and measurable: guidance met three quarters running, record Nevada underground tonnes, a decentralised structure giving regional teams autonomy, projects on time and on budget, Mali resolved, the Newmont dispute resolved with $1.95bn of cash coming the other way, capital returns doubled, $90m spent this year on safety technology.

The bad, and it is the reason I will not pay up. Chairman John Thornton is driving a 10% IPO of the crown-jewel North American assets over the stated objection of major shareholders — Van Eck (fourth-largest holder) has met executives at least three times this year to oppose it, Mackenzie Financial too; the complaint is that selling a minority of the best assets dilutes shareholders' exposure to them by up to 15% while doing nothing about the operating problems. Management was asked for a tax-free spin-off to existing holders on both the Q4 and Q2 calls and flatly refused: 'the short answer is no.' A 10% float creates a stub, not a re-rating; holdco discounts usually widen in that structure. The IPO has already slipped from 'year-end 2026' toward January 2027. The CEO who fixed the operations is leaving the parent to run the sub, and the parent has no named CEO. Management put collars on ~10% of production to protect a deal that never closed, after years of insisting Barrick does not hedge. Three fatalities in Q3 2025 and six lost-time injuries in Q2 2026. Hill volunteers Barrick's 'distinctive advantage in our ability to work with our Chinese partners' as a strength. None of this is fraud and the balance sheet is pristine, but by the brief's standard this is a governance mark against, not a clean sheet.

Competition. Gold is a price-taker business, so Barrick competes for capital, not customers, against Newmont, Agnico Eagle and AngloGold; the only durable edges are ore grade, jurisdiction and cost discipline. Nevada and Fourmile are genuinely tier-one on grade and jurisdiction; Mali, the DRC, Tanzania and Pakistan are the opposite, and the IPO concentrates the good half in a listed sub and leaves the bad half in the parent you would be buying.

How investors and analysts feel: 7/10

Warm, verging on crowded — not hated, and nowhere near capitulation.

  • Gold itself is the consensus macro long of 2026. It tripled off the 2023 lows, touched ~$5,000 in February, sits at ~$4,070 now, and the banks' 2027 targets are Goldman $4,800, BofA $4,813 average, UBS $5,400, Wells Fargo $5,200-5,400, JPMorgan $6,300. Published $6,300 targets are a late-phase tell, not an early one.
  • Sell side is bullish. 24 analysts, consensus Buy, average target ~$50.11 (+24%). RBC Outperform $53 (22 Oct), Scotiabank Outperform $55 with 2026 EPS of $3.60. The one dissent is CIBC, which downgraded to Neutral and cut from $57 to $49 on 16 October.
  • Nobody is short. 14.5m shares short on 15 October, ~0.9% of the count, 2.0 days to cover, and short interest has fallen 41% since the August spike.
  • Retail/buy-side commentary skews positive — 'undervalued cash machine', 'buy for copper growth and valuation discount' — though one recent piece, 'Nevada Is Priced Like It Is Already Listed', makes the point I agree with.
  • The genuinely contrarian features: the stock is 20-25% below its February high of $50.74 and has gone sideways for nine months while gold stayed high; Capital International cut its stake from 6.3% to 4.1% over twelve months (a ~$1.4bn exit, though BlackRock crossed up through 5%); and two large holders are fighting the chairman in public. That is friction and a stalled chart, not forced selling into a sound-business-everyone-gave-up-on. Barrick's own web traffic, which spiked in February with the IPO announcement, has drifted back toward 2025 levels.

Verdict, and the covered-call angle

Rating 4.5. Barrick is a decent business at a fair-to-full price: net cash, long reserves, a management team that has started delivering, 6% of the market cap coming back each year, and real optionality in Fourmile. But $40.56 is ~19x the free cash flow it generates at the best gold price in history, and the 50%-in-a-year outcome the brief is hunting requires gold to make another leg higher — not a mispricing I can underwrite. Not a short either: too much cash, too much gold optionality, too little leverage, and a 0.9% short base means there is no crowded trade to fade.

Research rating 5.5. Two resolvable questions are worth real work — what Fourmile is actually worth once a technical report exists (and what the Newmont package implies 38.5% of it was valued at), and what the North America IPO prints at — and either could move the stock 20%+ inside a year. But the dominant variable is the gold price, and no amount of research settles that.

One practical note: if you owned it, gold-miner implied volatility is rich and the ATM spread is 1.2%, so writing 3-6 month calls around $45-48 against a stock I think is worth ~$36 is the sensible way to hold. It is not the brief's 'valuation floor plus predictable forward earnings' covered-call setup — the earnings are not predictable, which is exactly why the premium is fat.

Timing caveat: this is written on Sunday 8 November, one day before Q3 2026 results (Monday 9 November, 6:00am ET). Q3 should be good — production above Q2, LBMA gold averaging $4,262, the $1.95bn Newmont cheque banked — with the likely news being the IPO timetable and the size of the year-end dividend top-up. Treat every 2026 figure here as pre-print.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue21500+47%16956+31%12922+13%11397+3%11013
Gross profit11863+69%8691+75%4961+43%3465+0%3472
Operating expenses655+33%589+16%508+4%487-4%509
▸Adj EBITDA13470+63%10090+60%6299+18%5359-2%5460
▸Adj OCF10564+67%7755+61%4811+19%4043+8%3749
CapEx-4543-3839-3170-3086-3049
Adj FCF6021+123%3916+139%1640+71%957+37%700
▸Interest expense231311431356343
▸Adj net income5122+60%4025+143%1658+21%1372-7%1471
▸Owner's earnings4800--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA36640100%9715100%9971100%6619100%5249100%5086100%
FCF (OCF−capex)996627%357137%399740%132220%64612%4318%
Net income1295535%411442%499350%214432%127224%4328%
▸Capital returned1096930%342535%274928%163925%104820%210941%
Buybacks4350192015084980.00424
Dividends466012468956957011124
Interest paid1636194311431356343
Debt paid down32466.235.014.0-9.00218
▸Reinvestment1368237%295730%150815%318448%301858%301559%
Capex (PP&E)1656234183839317030863049
Intangibles & M&A-2859-461-231911.1-53.5-36.3
Leases signed (net Δ)-21.1---12.13.00-14.02.00
Retained / other349110%8018%387839%1032%7.950%-1299-26%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 391 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)5269351483476264557745965
▸Liabilities (total)1545915632143701380914676
Net debt (incl. leases)-906-195211821096810
Net debt / Adj EBITDA-0.07-0.190.190.200.15
Net debt / Adj FCF-0.15-0.500.721.151.16
Adj EBITDA / interest58.432.414.615.015.9
Shares outstanding16461684175217561759
Dilution (YoY)-3.0%-3.9%-0.3%-0.2%-1.1%
Employees6500--------
MarginsTTM2025202420232022
Gross margin55.2%+7.151.3%+12.938.4%+8.030.4%-1.131.5%
Adj EBITDA margin62.6%+6.259.5%+10.848.8%+1.747.0%-2.649.6%
Adj OCF margin49.1%+5.945.7%+8.537.2%+1.835.5%+1.434.0%
Adj FCF margin28.0%+9.523.1%+10.412.7%+4.38.4%+2.06.4%
Net income margin30.3%+5.829.4%+12.916.6%+5.411.2%+7.23.9%
Adj NI margin23.8%+1.923.7%+10.912.8%+0.812.0%-1.313.4%
ROIC (adj, after-tax)24.2%19.5%9.8%6.8%6.9%
Cost of debt4.9%6.6%8.9%7.3%6.7%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-10

Barrick delivered its third consecutive quarter of strong operating and financial performance in the second quarter of 2026. Gold production was 976,000 ounces, 3% above guidance and 11% higher than in the first quarter. The improvement reflected progress at Loulo-Gounkoto, a faster-than-expected post-maintenance ramp-up at Pueblo Viejo, record underground tonnes at Cortez and continued growth at Goldrush. Copper production totaled 56,000 tonnes. The company maintained cost guidance despite fuel-price pressures through operational efficiencies and productivity initiatives. Net earnings rose 50% year over year to $1.2 billion, while adjusted net earnings reached $1.36 billion, equivalent to adjusted EPS of $0.82 and in line with Bloomberg consensus. Attributable adjusted EBITDA increased 51% to $2.425 billion, producing a 59% margin. Second-quarter attributable free cash flow declined 33% year over year because of seasonal tax and interest payments and a one-time $400 million Loulo-Gounkoto payment. Excluding that payment, free cash flow would have increased more than 60%. Year-to-date attributable free cash flow was $1.4 billion, more than twice the prior-year level. Barrick finished the quarter with $1.2 billion of net cash, an undrawn $3 billion revolving facility and no meaningful debt maturities until 2033. Shareholder returns were a major focus. Barrick repurchased $1.2 billion of shares during the quarter under its $3 billion authorization. Since new leadership took over in October 2025, the company has returned $3 billion through dividends and buybacks, more than double the comparable prior period. The capital-allocation framework prioritizes balance-sheet discipline, investment in high-return organic growth and returning excess cash. The base dividend remains $0.175 per share quarterly, with a year-end performance payment intended to bring total distributions to 50% of attributable free cash flow. Barrick’s agreement with Newmont concerning Nevada Gold Mines was the key strategic announcement. Management described the package as having an approximate total value of $4 billion. It includes the value of Fourmile, Newmont’s Mike and Fiberline properties, settlement of legacy disputes and the benefit of reducing structural friction in the planned IPO. Barrick will acquire Newmont’s 61.5% interests in Mike and Fiberline, while the transaction incorporates the parties’ respective Fourmile interests. Management declined to provide a component-by-component valuation. The agreement is intended to eliminate disputes, align the joint-venture partners and permit faster optimization of Nevada Gold Mines. Fourmile drilling has increased to 20 active rigs, with the PFS still scheduled for completion in 2028. Barrick intends to accelerate development where possible and work in parallel on processing capacity. Management is evaluating a new roaster or autoclave, with a preliminary roaster estimate of about $2.5 billion. The objective is to reduce long-distance ore trucking, increase Nevada processing capacity, improve the production ramp-up and potentially lower the cost structure. Barrick continues to target a roughly 10% IPO of the North American assets by year-end, does not currently plan to sell 100% of the business or distribute it directly to existing shareholders, and expects most net proceeds to be returned to shareholders. The structure is being revisited following the Newmont agreement to capture potential savings. Marketing plans and senior-management recruitment are progressing, while both internal and external candidates are being considered for leadership roles. Other growth projects remain on schedule and budget. Lumwana’s mill expansion is expected to double copper production, with first expanded production targeted by the end of the first quarter of 2028. The Pueblo Viejo expansion is advancing across its tailings, haul-road and water-treatment infrastructure, and 90% of resettlement packages have been accepted. Barrick will not begin Reko Diq plant construction in 2026, reducing attributable project spending from $600 million-$700 million to $450 million-$500 million and lowering total 2026 attributable capital guidance to $3.8 billion-$4.2 billion. The company also sees substantial growth potential in its non-North American portfolio, including Lumwana and Kibali, and plans to optimize those assets rather than let the IPO distract from them. Safety performance improved, with the frequency rate declining quarter over quarter from 0.92 to 0.70, but six lost-time injuries remained unacceptable. Management is increasing field leadership presence, critical-control verification and investment in automation, dash cameras, reporting software and AI analytics. Full-year 2026 production and cost guidance remains unchanged, with gold and copper production expected to increase during the second half.

Analyst Q&A (29)
▸
Asked for a breakdown of the approximately $4 billion Newmont agreement, including the value of Mike and Fiberline and the amount attributable to historical disputes.
Josh Wolfson · RBC
Hill declined to provide a detailed allocation for legacy disputes or the individual assets. The roughly $4 billion package includes Fourmile, Mike and Fiberline, settlement of historical disputes, and benefits from lower IPO friction. He emphasized that combining the assets should enable processing expansions, reduce trucking, create synergies and accelerate development at Nevada Gold Mines.
▸
Asked whether the Newmont resolution could change the planned IPO structure from a 10%-15% minority stake, including whether Barrick might sell a larger interest and when a shareholder vote would be required.
Josh Wolfson · RBC
Management expects the IPO to remain a roughly 10% minority offering. The post-agreement structure is being reviewed to reduce friction costs and optimize the IPO, but no larger offering is currently contemplated. Management did not provide details on circumstances requiring a shareholder vote.
▸
Asked whether the agreement represented approximately $4 billion for the new assets and disputes plus another roughly $2 billion, implying a total value near $6 billion.
Tanya Jakusconek
Hill clarified that the entire transaction package is valued at approximately $4 billion, not $4 billion for the new assets plus an additional amount for disputes.
▸
Asked whether Newmont's cash payment would be included in the IPO proceeds or potentially used for share repurchases and a year-end dividend top-up.
Tanya Jakusconek
Management said the cash received from Newmont would largely be returned to shareholders, through mechanisms such as buybacks or dividends.
▸
Asked what remains before the North American IPO can launch, including SEC approval, historical financial statements, the board and other process steps.
Tanya Jakusconek
The IPO process is close to completion, but management is reassessing the structure following the Newmont agreement to capture potential savings and ensure appropriate diligence. It remains on track for completion by year-end.
▸
Asked whether integrating Fourmile into Nevada Gold Mines could accelerate development and bring production forward from the early 2030s timeframe suggested by the initial PEA.
Lawson Winder · BofA Securities
Management intends to accelerate Fourmile as much as possible. The PFS remains scheduled for 2028, but Barrick will advance processing solutions in parallel with declines and drilling. The asset may not start earlier, but the company aims for a faster ramp-up and potentially higher production once it begins.
▸
Asked whether Barrick's thinking had changed regarding eventually IPOing all of the North American business after the initial minority offering.
Lawson Winder · BofA Securities
No change is planned: Barrick intends to IPO approximately 10% of the North American business and does not currently plan to sell 100% or move beyond that initial minority interest.
▸
Asked whether an IPO marketing process would begin in the near future.
Lawson Winder · BofA Securities
Management confirmed there will be a marketing process for the IPO, but did not provide its timing.
▸
Asked for the potential capital cost of a new roaster or similar processing facility and the expected broader Nevada Gold Mines capital requirements.
Anita Soni · CIBC
Hill estimated a new roaster could cost around $2.5 billion, although the amount remains preliminary. It could reduce trucking and offset other infrastructure needs. Fourmile-related capital was described conceptually at roughly $1.5 billion-$1.7 billion over the next several years, with additional capital for the Turquoise Ridge truck fleet and potentially autonomous hauling. North American capital spending is expected to remain broadly in line with prior expectations.
▸
Asked whether Barrick could file or otherwise publish the prior Fourmile PEA so investors would have a clearer valuation and modeling reference before the PFS.
Anita Soni · CIBC
Hill acknowledged that the conceptual PEA was not sufficient for investors to model Fourmile confidently. Barrick still needs to complete the technical-report process and will consider how to provide better interim information while the PFS is developed.
▸
Asked for round-number values for Mike and Fiberline and whether the transaction effectively reflects Newmont contributing its 61.5% interests in those assets while the parties account for their respective Fourmile interests.
Anita Soni · CIBC
Management said Barrick is paying for 61.5% of Mike and Fiberline, with the overall package also incorporating Fourmile, legacy dispute settlement and other benefits. It declined to provide a numerical breakdown of those components.
▸
Asked whether the $4 billion represented the combined value of the 61.5% interests in Mike and Fiberline and the 38.5% Fourmile interest, or only the Fourmile component.
Daniel Major · UBS
Management explained that the approximately $4 billion is a net transaction value reflecting the value of Barrick's 38.5% interest in Fourmile, offset by the value of 61.5% of Mike and Fiberline, plus settlement of legacy disputes and the benefit of Newmont's IPO consent and lower friction costs.
▸
Asked whether Fourmile's all-in sustaining cost would remain near the PEA's $650-$700 per-ounce range if additional processing capital and production upside were incorporated.
Daniel Major · UBS
Management expects all-in sustaining costs to be broadly comparable with the $650-$700 per-ounce range in the 2025 conceptual PEA, despite potentially adding about $2.5 billion of downstream processing capital. The objective is to increase Nevada production and reduce trucking, which could lower costs.
▸
Asked to clarify whether the current roughly $3,600-per-ounce gold-price assumption implied adding $100 per ounce to the $650-$700 cost range.
Daniel Major · UBS
Management said the higher current long-term gold-price consensus implies adding approximately $100 per ounce to the prior cost range, resulting in an indicative range around $750-$800 per ounce. This was described as a sensitivity rather than a revised project estimate.
▸
Asked whether the revised cost sensitivity incorporated the Teck net-profits interest.
Daniel Major · UBS
Management confirmed that the stated sensitivity includes the relevant project assumptions, including the Teck NPI and other items.
▸
Asked how the valuation reflected the impact of Fourmile ore displacing other material in existing processing plants and whether Newmont benefited from assumptions regarding its infrastructure share.
Daniel Major · UBS
Management said the technical teams from Barrick and Newmont jointly reviewed the Fourmile model and data, including the effects of displacing other material through the processing plants, and incorporated those considerations into the PEA and transaction analysis.
▸
Asked how advanced Barrick was in recruiting senior management for the IPO vehicle and parent company.
Daniel Major · UBS
Management said recruitment for senior roles is advanced, with discussions continuing ahead of the next board meeting. The company expects to update the market shortly.
▸
Asked for more detail on Loulo-Gounkoto's ramp-up into open-pit ore, including required capital and Barrick's willingness to invest to support that growth.
Bennett Moore · JPMorgan
Loulo-Gounkoto has become self-sustaining, so current growth capital is funded internally. Further production growth is expected from deeper pushbacks and open pits, with the move into those areas expected in the first half of next year, likely around the second or third quarter.
▸
Asked how much conservatism was embedded in full-year production guidance given strong performance at Nevada Gold Mines, Pueblo Viejo and Loulo-Gounkoto and expected second-half growth in gold and copper.
Bennett Moore · JPMorgan
Barrick remains confident in meeting unchanged full-year guidance, but management does not view the outlook as conservative. Weather-related disruptions affected Veladero, while Pueblo Viejo experienced a shutdown related to water conditions; these were not considered operating-performance issues.
▸
Asked how employee turnover at Nevada Gold Mines trended during the quarter and whether it remained in the mid-teens.
Bennett Moore · JPMorgan
Hill believed turnover was approximately 14% but said he would confirm the figure. Management is focused on making Nevada Gold Mines an employer of choice and said workforce culture and performance have improved substantially.
▸
Asked whether Barrick was considering portfolio-management actions for its non-North American assets and whether the North American IPO would delay those actions through year-end or early 2027.
Bob Brackett · Bernstein Research
Management views the non-North American portfolio as a major growth engine rather than a near-term divestment focus. It is evaluating ways to optimize the portfolio, leverage partnerships and pursue brownfield growth, particularly around Lumwana and Kibali, and does not expect the IPO process to prevent that work.
▸
Asked whether the Newmont agreement included contingent payments related to exploration success or other future upside.
Bob Brackett · Bernstein Research
Management said the Newmont agreement is complete and does not include contingent payments tied to exploration upside or future success.
▸
Asked about permitting requirements and timing as Barrick seeks to optimize Nevada Gold Mines and accelerate Fourmile.
Steven Green · TD Cowen
Barrick intends to permit a full decline at Fourmile and is working first to determine the optimal Nevada processing configuration. It will evaluate options such as an autoclave versus a roaster and their location before finalizing permitting plans. Management expects the agreement to enable faster optimization and permitting work.
▸
Asked whether the roughly 6.4 million ounces at Mike and Fiberline were inferred resources and how advanced and geographically positioned the properties were.
Steven Green · TD Cowen
Management could not confirm the classification of the approximately 6.4 million ounces at Mike and Fiberline. Fiberline is near Turquoise Ridge infrastructure and is an open-pit satellite opportunity; Mike has not yet been assigned significant value.
▸
Asked whether Barrick might eventually float 10% of the non-North American business in a structure similar to the North American IPO.
Martin Pradier · Veritas Investment Research
Management has not discussed or considered a separate offering of 10% of the non-North American assets. Such a transaction is not currently contemplated.
▸
Asked whether the Loulo-Gounkoto payment related to the retroactive application of Mali's 2023 mining law, whether it was part of the original agreement and why it had not been accrued in earlier quarters.
Martin Pradier · Veritas Investment Research
The $200 million expense, within the $400 million cash payment, relates to additional royalties, penalties and interest resulting from the retrospective application of Mali's 2023 mining code to 2024 and 2025. Earlier settlements covered 2023 and prior years; the original agreement did not cover the later periods, which required a subsequent reconciliation.
▸
Asked how the revised NGM joint-venture agreement changes Newmont's rights over operations, management appointments, technical information and technical-report releases.
Lawson Winder · BofA Securities
Newmont will have access to information and the site and can provide technical feedback. Its consent is required for appointment of the Nevada Gold Mines general manager, and Barrick plans to embed a Newmont employee in the NGM executive team. Other governance provisions are less significant because Fourmile and Fiberline are now included in the joint venture.
▸
Asked whether Barrick preferred an internal or external candidate in the search for the parent company's CEO.
Lawson Winder · BofA Securities
The search includes both internal and external candidates. Hill said his preference is for an internal candidate, but no decision has been reached.
▸
Asked whether Barrick was considering distributing North American assets directly to existing shareholders instead of using an IPO.
Daniel
Management rejected a spinout or direct distribution of North American assets to existing shareholders and reiterated that the planned structure is an IPO.

Options

Chain Snapshot (daily)

Call IV (ATM)80%
Put IV (ATM)22%
ATM Spread1.2%
Call $OI (near money)$39.1M
Put $OI (near money)$11.3M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$37.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$34.00$6.25/$6.7570$0.19/$0.41608
$35.00$5.50/$5.9034,383$0.50/$0.5710,244
$36.00$4.65/$5.20362$0.70/$0.801,960
$37.00$4.00/$4.45330$0.94/$1.042,107
$38.00$3.25/$3.70396$1.30/$1.412,324
$39.00$2.63/$3.101,333$1.51/$1.861,628
$40.00$2.24/$2.512,279$2.14/$2.375,082
$41.00$1.69/$2.17738$2.61/$2.92709
Snapshot: 2026-11-04

Short Interest

Short % of Float1.1%
Short Shares17.7M
Days to Cover2.6
Change (vs Prior)+21.9%
Short % Float History
1.10%-0.10pp
1.0%1.5%2.0%2.5%10-1512-3103-1305-2908-1410-30

Web Traffic

barrick.com
Web rank#708,743
Est. visits/mo672K
Traffic YoY▲ 3.8%
Traffic QoQ (12w)▼ 11.7%
Web Rank History
#708,743-96,690
rankest. visits/mo
400k600k800k1.0m446K851K1.3M1.7M2.1M05-1909-0812-0803-1606-1509-1411-16

Executive Compensation (2021.0-2023.0)

Direct Pay$18.6M
Incentive & Other$16.1M
Total Compensation$34.7M
% of Revenue0.1%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Capital International Investors$2.41B$23.75+$45.3M−$345M—$481.62B
VAN ECK ASSOCIATES CORP$2.20B$24.56−$253M−$185M—$164.08B
BlackRock, Inc.Passive$1.84B$22.36−$217M+$52.5M—$6.70T
VANGUARD CAPITAL MANAGEMENT LLCPassive$1.70B$40.74+$22.5M+$1.70B—$4.68T
ROYAL BANK OF CANADA$1.50B$25.66+$45.0M+$527M—$589.47B
BANK OF MONTREAL /CAN/$1.31B$30.81+$72.7M+$664M—$268.37B
ARROWSTREET CAPITAL, LIMITED PARTNERSHIP$1.26B$20.44−$479M−$661M—$225.34B
FIL Ltd$1.07B$35.57+$163M+$890M—$139.12B
Capital World Investors$1.06B$27.59−$12.9M+$193M—$846.00B
MACKENZIE FINANCIAL CORP$1.03B$29.67+$2.0M+$417M—$99.88B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

097.4M194.8M292.2M389.6M$19$25$31$37$432025-032025-062025-092025-122026-032026-06
hover the chart for per-quarter detailprice (right axis)
Capital International Investors65.5MVAN ECK ASSOCIATES CORP60.0MARROWSTREET CAPITAL, LIMITED PARTNERSHIP34.4MROYAL BANK OF CANADA40.8MWELLINGTON MANAGEMENT GROUP LLP8.1MFirst Eagle Investment Management, LLC19.9MBANK OF MONTREAL /CAN/35.8MFIL Ltd29.1MCapital World Investors28.9MMACKENZIE FINANCIAL CORP19.8M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
BCEBCE Inc.382.27×
BTEBaytex Energy Corp.382.27×
RCIRogers Communications Inc.371.99×
TUTelus Corp371.99×
BTGB2Gold Corp.463.99×
OROR Royalties Inc.347.99×
KGCKinross Gold Corporation341.14×
WPMWheaton Precious Metals Corp.739.52×
CVECenovus Energy Inc.538.39×
MFCManulife Financial Corporation434.90×
RGLDRoyal Gold, Inc.333.88×
NEMNewmont Corporation831.34×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (4 analysts)$51.63+52.2%
Last Year (22 analysts)$52.52+54.8%
Current Price$33.92
Analyst Ratings
15
10
Buy: 15Hold: 10Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2009 Q21.8B974M549M$0.33$0.26 – $0.398
2009 Q32.1B1.0B573M$0.43$0.28 – $0.5111
2009 Q42.3B-5.4B-5.6B$0.54$0.34 – $0.6812
2010 Q32.7B-6.4B-6.8B$0.78$0.67 – $0.878
2010 Q42.9B—0M$0.00$0.00 – $0.007
2011 Q13.5B2.7B1.9B$1.08$0.97 – $1.268
2011 Q23.5B1.7B1.0B$1.16$0.97 – $1.309
2011 Q34.0B2.1B1.3B$1.25$1.08 – $1.408
2011 Q43.9B—0M$0.00$0.00 – $0.006
2012 Q13.8B3.0B2.0B$1.14$1.05 – $1.378
2012 Q23.5B1.6B953M$0.92$0.84 – $1.039
2012 Q33.6B1.5B810M$1.03$0.79 – $1.2411
2012 Q44.3B1.5B771M$1.03$0.93 – $1.129
2013 Q13.6B-2.0B-2.5B$0.85$0.67 – $1.2411
2013 Q23.2B1.6B756M$0.54$0.43 – $0.6411
2013 Q32.9B-7.5B-8.0B$0.49$0.41 – $0.6115
2013 Q42.9B779M168M$0.42$0.30 – $0.5814
2014 Q12.7B-2.0B-2.7B$0.21$0.12 – $0.4817
2014 Q22.4B716M80M$0.15$0.11 – $0.2717
2014 Q32.5B349M-275M$0.15$0.13 – $0.2118
2014 Q42.5B731M129M$0.13$0.07 – $0.1917
2015 Q12.4B-2.0B-2.7B$0.08$0.03 – $0.1714
2015 Q22.2B683M54M$0.05$0.04 – $0.0515
2015 Q32.3B624M-9M$0.05$0.03 – $0.0716
2015 Q42.2B404M-253M$0.05$0.04 – $0.0919
2016 Q12.0B-1.9B-2.5B$0.08$0.04 – $0.1418
2016 Q22.1B456M-85M$0.11$0.08 – $0.1418
2016 Q32.2B734M149M$0.16$0.12 – $0.2019
2016 Q42.2B719M176M$0.15$0.08 – $0.1818
2017 Q12.2B1.1B400M$0.15$0.08 – $0.2219
2017 Q22.1B1.4B644M$0.14$0.11 – $0.2116
2017 Q32.0B1.9B1.1B$0.14$0.10 – $0.2015
2017 Q42.2B222M-12M$0.17$0.14 – $0.2016
2018 Q11.8B200M-262M$0.10$0.08 – $0.1616
2018 Q21.8B651M154M$0.08$0.05 – $0.1214
2018 Q31.8B390M-97M$0.05$0.02 – $0.0715
2018 Q42.0B428M-442M$0.04$0.02 – $0.0916
2019 Q12.2B-719M-1.3B$0.09$0.07 – $0.1011
2019 Q22.1B736M115M$0.09$0.07 – $0.108
2019 Q32.7B983M254M$0.12$0.09 – $0.138
2019 Q42.7B3.4B2.5B$0.14$0.10 – $0.1515
2020 Q12.8B2.2B1.3B$0.16$0.12 – $0.1710
2020 Q22.9B1.2B416M$0.19$0.15 – $0.217
2020 Q33.3B1.2B443M$0.32$0.25 – $0.357
2020 Q43.2B827M485M$0.31$0.24 – $0.3414
2021 Q12.9B1.1B417M$0.27$0.21 – $0.2910
2021 Q22.9B1.2B433M$0.27$0.21 – $0.295
2021 Q32.8B1.1B352M$0.23$0.17 – $0.253
2021 Q43.2B1.2B434M$0.30$0.23 – $0.326
2022 Q12.8B1.0B361M$0.24$0.19 – $0.264
2022 Q22.9B1.0B361M$0.23$0.17 – $0.246
2022 Q32.5B781M175M$0.11$0.09 – $0.124
2022 Q42.7B1.4B175M$0.11$0.09 – $0.127
2023 Q12.6B863M195M$0.12$0.09 – $0.133
2023 Q22.9B959M292M$0.17$0.13 – $0.195
2023 Q33.0B1.0B326M$0.19$0.16 – $0.268
2023 Q43.1B1.3B342M$0.20$0.14 – $0.268
2024 Q12.8B907M261M$0.16$0.12 – $0.2011
2024 Q23.1B1.3B452M$0.27$0.21 – $0.3210
2024 Q33.5B1.3B532M$0.32$0.23 – $0.377
2024 Q4404M—771M$0.47$0.46 – $0.482
2025 Q13.0B1.1B460M$0.27$0.22 – $0.4113
2025 Q23.6B1.5B773M$0.46$0.43 – $0.5013
2025 Q34.4B1.9B1.0B$0.60$0.51 – $0.7113
2025 Q45.1B2.4B1.4B$0.85$0.79 – $0.949
2026 Q14.7B2.3B1.3B$0.79$0.67 – $0.9411
2026 Q25.1B2.4B1.4B$0.85$0.72 – $1.0311
2026 Q35.0B—0M$0.00$0.00 – $0.002
2026 Q45.3B2.3B1.3B$0.78$0.73 – $0.877
2027 Q15.4B2.8B1.6B$0.99$0.83 – $1.286
2027 Q26.5B3.3B2.0B$1.19$0.91 – $1.294
2027 Q36.4B3.4B2.0B$1.22$0.93 – $1.324
2027 Q46.3B3.4B2.0B$1.23$1.11 – $1.375
2028 Q16.4B3.7B2.2B$1.30$1.00 – $1.425
2028 Q26.3B3.7B2.1B$1.28$0.98 – $1.395
2028 Q35.9B3.6B2.1B$1.24$0.95 – $1.355
2028 Q45.8B3.6B2.0B$1.22$1.10 – $1.357
v2 analysis (legacy, 2026-08-11) — for comparison onlyclick to expand

Thesis

Barrick is currently an unusually strong cash generator for a miner, with TTM adjusted EBITDA of $11.9B, adjusted FCF of $5.3B, $2.4B of reported net cash at the latest balance-sheet reference, and sharply improved margins. The business has also reduced share count and is returning substantial capital through dividends and buybacks. The latest quarter extends the operational improvement: production beat guidance, Pueblo Viejo recovered faster than expected, Loulo-Gounkoto is becoming self-sustaining, and copper growth projects remain on schedule. The central issue is that current profitability reflects a powerful gold-price environment and cannot be capitalized as a permanent annuity. Barrick still carries execution and geopolitical exposure in Mali, Pakistan and Africa, while Fourmile, Lumwana and processing infrastructure require substantial capital before they produce their full benefits. The Newmont agreement may improve Nevada's strategic value and remove IPO friction, but management's refusal to disclose a component valuation makes the transaction difficult to model. The North American IPO is a potentially meaningful catalyst, though its planned minority structure limits immediate value transfer. The base case assumes normalized-but-supportive metals prices, improving production reliability and owner earnings around $5.5B in two years. The valuation range is wide because commodity prices, reserve life, project execution and geopolitical outcomes can move both earnings and the appropriate multiple substantially.

Trade Signal

Trade rating
-4.8/10
No trade
Horizon
~4.5mo
gpt-5.6-luna2026-08-11 · saw $39.98-8.6% since

Short-biased / no-trade-sized short: Barrick is an excellent cash-generating miner, but its $67.8B capitalization is far above the study's roughly $38-$40B normalized value and already discounts much of the operational and IPO upside.

Temporary mispricing+0.5

The major move was a durable commodity and earnings re-rating: the stock rose from roughly $15 at the end of 2024 to $43 by late 2025 as gold prices strengthened, earnings and margins improved, Mali risk was resolved and capital returns accelerated. It continued to peak near $51 in February 2026, then fell toward $35-$38 through March-July amid profit-taking, commodity volatility, project and execution concerns, and skepticism about Reko Diq and Pueblo Viejo. It rebounded to $43.60 before Q2 earnings and fell 7% to $40.52 after the August 10 release, despite a strong quarter, because the result was broadly in line with consensus and investors focused on valuation and sustainability. The recent post-earnings decline looks like a modest, mostly justified repricing rather than a panic overreaction; there is only a small possible overshoot that could close if the H2 ramp and IPO execute.

Market view+5.5

The market is constructive to bullish. Sixteen of 24 analysts rate the stock Buy, none rate it Sell, and the average target is 17% above the current price. The narrative emphasizes strong gold prices, surging cash flow, production recovery, buybacks, net cash and value creation from the North American IPO. Positioning is not euphoric in retail terms, but the low 1% short interest, call-heavy options open interest and major one-year rally indicate limited skepticism. The prevailing view may be stale on normalized earnings and project risk: Q2 met consensus despite strong operations, while the stock still capitalizes much of the recent commodity windfall.

Inflectionwindow ~3mo-1.5

Operationally, Barrick is improving: Q2 production beat guidance, gold output rose sequentially, margins were strong and H2 production is expected to increase. The North American IPO could improve the asset mix and investor audience. However, the market already expects substantial improvement: the consensus is Buy, the average target is $47.42, and the stock has already been heavily re-rated. The analyst's normalized owner-earnings framework is materially below the current capitalization, so the next inflection is more likely to be a test of earnings durability than an unexpected positive step-up. Pueblo Viejo recovery, gold-price normalization and capital intensity remain key risks.

Catalysts
  • ▲2026-11 · Q3 2026 earnings and full-year production update — The H2 production ramp, cost control and Pueblo Viejo recovery progress could support the stock; any guidance miss would reinforce the valuation concern.
  • ▲Late 2026 · North American Barrick IPO preparation or launch — A year-end minority IPO could establish a premium valuation for Nevada and other North American assets and crystallize some hidden value, though proceeds and structure remain uncertain.
  • ▲2026-12 to 2027-01 · Year-end performance dividend and continued buybacks — Distributions targeted at roughly 50% of attributable free cash flow provide a tangible demand and shareholder-return catalyst.
  • ▲2027-02 · Q4 2026 earnings and 2027 guidance — Evidence of sustained production growth and further Pueblo Viejo recovery improvement would test whether current earnings are durable rather than merely gold-price driven.
  • ▼H1 2027 · Reko Diq security and development review — The review remains extended into mid-2027; further delays, inflation or financing complexity could increase capital requirements and weaken the long-term project value.
Flow+4.0

Strongly positive near-term flow. Barrick repurchased $1.2B of stock in Q2 and has a $3B authorization, while TTM dilution was negative 3%. Dividends and the planned performance payment add demand. The main offset is that passive and active institutional holders have reduced positions recently, and the eventual North American IPO could create a modest valuation or supply overhang.

Floor / Ceiling+2.0

The company has a real but not hard floor: approximately $1.2B of net cash, no meaningful debt maturities until 2033, strong operating cash generation and active buybacks. Those supports are offset by commodity cyclicality, large ongoing project capital needs and the risk that current free cash flow reflects unusually high gold prices. There is no credible hard acquirer floor, and tangible asset value is difficult to realize quickly in a mining downturn.

Buyability

Highly buyable for gold and cash-return investors: Barrick is solvent, generating substantial free cash flow, repurchasing shares and offering exposure to strong gold and copper markets. The likely buyers are commodity-focused institutions and investors seeking a large-cap gold producer with improving operations and a potential North American asset IPO. However, the current price already embeds unusually favorable commodity economics, limiting enthusiasm for incremental buyers.

Fear vs Greedfear 5/10 (+1.0)greed 7/10 (+3.0)

Fear pulls stronger at $40.52. The business is executing well and the cash returns are real, but the stock has risen roughly 81% over the past year, trades at a valuation that assumes sustained exceptional gold economics, and sits far above the analyst's normalized fair value. The risk/reward is asymmetric for a long even though the operating momentum makes an outright short uncomfortable.

Valuation

Our Target
$38.0B-31%
Market Should Pay
$35.0B-37%
target ×0.92 (fear discount)
Current Market Cap
$55.2BSlightly bullish
What Changed
transcript · 2026-08-10
+8%fair value on this information

The genuinely new information is three consecutive quarters of stronger operating delivery, with Q2 gold production 3% above guidance and 11% above Q1, copper production of 56,000 tonnes, and a faster Pueblo Viejo ramp. Management also disclosed that the Newmont agreement is a complete approximately $4B net package rather than a larger $6B transaction, while confirming that the North American IPO remains targeted for year-end. The quarter clarified that reported FCF was depressed by seasonal taxes, interest and a one-time $400M Mali payment, but it also revealed preliminary potential Nevada processing capital of about $2.5B and continued opacity around the transaction's asset-by-asset valuation.

▸ How the cases moved

Relative to the day before the Q2 event, the bear case falls modestly from roughly $24,000M to $22,000M as the $400M Loulo-Gounkoto payment, weaker reported quarterly FCF and continued Reko Diq uncertainty expose cash-flow volatility; its probability declines from 0.22 to 0.20 because operating delivery improved. The base case rises from approximately $45,000M to $47,950M as the third consecutive strong quarter, production beat and faster Pueblo Viejo ramp increase confidence in normalized earnings; its probability rises from 0.53 to 0.55. The bull case rises from about $72,000M to $76,200M because the Newmont settlement removes Nevada JV friction and may improve IPO economics, with probability increasing from 0.25 to 0.25 as execution upside is clearer but valuation disclosure remains inadequate.

2-Year Plausible Outcomes
bear20%
$25.2B
rev -10%/yrOE $3000M

Gold prices normalize, production remains uneven, Pueblo Viejo recovery improvements disappoint, and Reko Diq and Nevada growth require more capital without near-term cash returns. Barrick remains solvent and cash-generative but margins and free cash flow retreat materially.

▸ Valuation

8x $3,000M owner earnings = $24,000M equity value + $1,200M net cash = $25,200M equity

base55%
$48.0B
rev +5%/yrOE $5500M

Gold and copper prices remain supportive but below the exceptional recent run-rate. Production improves through the second half, Nevada execution stabilizes, and the North American IPO proceeds with some value realization. Capital intensity remains elevated, while Reko Diq is delayed and Fourmile remains a longer-dated option.

▸ Valuation

8.5x $5,500M owner earnings = $46,750M equity value + $1,200M net cash = $47,950M equity

bull25%
$76.2B
rev +12%/yrOE $7500M

Gold remains structurally strong, copper benefits from rising demand, and Barrick delivers the guided production ramp without major cost escalation. Nevada assets receive a premium valuation through the IPO, Fourmile and Lumwana show credible growth, and substantial cash returns continue while the balance sheet stays in net cash.

▸ Valuation

10x $7,500M owner earnings = $75,000M equity value + $1,200M net cash = $76,200M equity

▸ Target Rationale

The probability-weighted discounted scenario value is $40,370M, but I set the analytical target at $38,000M. The discount reflects the unusually favorable commodity backdrop embedded in current earnings, persistent mining execution risk, opaque economics around the approximately $4B Newmont package, and the significant capital still required for Fourmile, Nevada processing, Lumwana and other projects. The balance sheet and cash generation support a value near the model output, so this is a measured haircut rather than a distress adjustment.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now8/10
Trajectory8/10
Risk5/10
Governance6/10
Insolvency prob (2yr)2%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial & Operational Results: On May 11, 2026, Barrick reported strong results for the first quarter of 2026. Driven by high realized gold prices, net earnings surged 238% year-over-year to $1.6 billion, while revenue reached $5.22 billion. The company generated $1.21 billion in attributable free cash flow. First-quarter gold production of 719,000 ounces beat internal expectations, though it fell 17% sequentially from Q4 2025 due to lower grades at key sites. First-quarter copper production rose 11% year-over-year to 49,000 tonnes.
  • Leadership Transition: Following the abrupt departure of former CEO Mark Bristow in late September 2025, interim head Mark Hill was officially appointed as the permanent President, CEO, and Board Director on February 5, 2026. Hill has shifted the corporate focus toward lower-risk jurisdictions in North America.
  • Mali Dispute Settled: In late November 2025, Barrick resolved its high-stakes, two-year dispute with the Malian government over the Loulo-Gounkoto complex. Barrick paid a $430 million settlement to drop all legal disputes and release detained employees. Operational control was returned to Barrick on December 16, 2025, and the company secured a crucial 10-year mining license extension.
  • Capital Returns: Alongside its Q1 2026 earnings release, Barrick’s board authorized a new share repurchase program of up to $3.0 billion. The company also declared a $0.175 per share quarterly dividend.
  • Portfolio Simplification: Barrick closed the sales of the non-core Hemlo mine in Canada (to Carcetti Capital Corp) and the Tongon mine in Ivory Coast (to Atlantic Group) in late 2025, raising over $2.1 billion in cash proceeds.
▸ Thesis-test Findings
North American Assets Partial IPO Structure & Domicile

Barrick has advanced plans for an initial public offering of a minority stake in a new standalone entity named North American Barrick, targeted for completion by the end of 2026. The new company will be domiciled in Canada, with a primary stock market listing in New York (NYSE) and a secondary listing in Toronto (TSX). It will hold Barrick's joint venture interests in Nevada Gold Mines and the Pueblo Viejo mine in the Dominican Republic, as well as the wholly owned, high-grade Fourmile project in Nevada. Collectively, these assets represented approximately 2.0 million ounces of attributable gold production in 2025. Barrick plans to retain a significant controlling interest. A dedicated management team—including Tim Cribb as COO and Wessel Hamman as CFO—has been appointed to run the vehicle.

  • Thesis Impact: *Strongly Bullish*. This spin-out isolates Barrick’s premier, low-geopolitical-risk assets in a dedicated vehicle, which is expected to unlock hidden valuation upside and attract a more targeted, premium investor base.
Reko Diq Pakistan Project Security & Financing

On February 5, 2026, Barrick initiated a review of the Reko Diq copper-gold project due to escalating security risks in Balochistan. On March 26, 2026, the company extended this review by 12 months (stretching until mid-2027) and slowed down development activity to curb capital expenditure, putting active construction on hold. This delay is highly likely to trigger significant capital cost inflation (Phase 1 was previously budgeted at $5.6–$6.0 billion) and push back the initial late-2028 first-production timeline. Despite the slowdown, a June 2026 high-level delegation led by Executive Chairman John L. Thornton visited Islamabad, confirming Barrick remains committed to the project. Partners confirmed that current lenders expressed confidence in the security protocols during recent meetings, and new prospective financiers are showing strong interest in expanding the project's credit structures.

  • Thesis Impact: *Mixed / Moderately Bearish Short-Term*. The mid-2027 project slowdown, capital inflation, and timeline delays are a near-term headwind. However, the resilience of lender confidence, incoming financing interest, and unwavering executive commitment preserve Reko Diq's long-term massive copper bull case.
Pueblo Viejo Recovery Rate & Autoclave Performance

During Q1 2026, the gold recovery rate at Pueblo Viejo stood at 74%. While this is an improvement from previous low points, it lags behind the company's prior plant expansion targets of achieving an 80% recovery rate by late 2024, 85% in 2025, and targeting 90% by 2027. According to the updated February 2026 Technical Report, Barrick has updated its metallurgical model and is collaborating with engineering firm Hatch to optimize autoclave performance and recovery rates. Technical remedies currently being rolled out include the installation and commissioning of a new closed-circuit classification step, a grinding thickener capacity increase, the activation of deslime cyclones, and staged reagent dosing to improve flotation efficiency and boost the capacity of carbon-in-leach (CIL) launders.

  • Thesis Impact: *Mixed*. On one hand, persistent operational bottlenecks, power interruptions, and underperforming recovery rates compared to historical feasibility estimates act as a drag on production. On the other hand, the deployment of targeted engineering fixes in partnership with Hatch and the detailed roadmap in the updated 2026 technical report show a clear pathway back toward a 90% recovery rate by 2027.