Stocks/BTG

BTG

B2Gold Corp.v3 5.5/10 · 2026-11-13
Basic Materials·Gold
$4.85
$5.8B market cap
1.4% div yield
v3 Rating
5.5/104.0–6.5
Setup
4.5/103.5–5.5
Fair Value
$5.30$3.60–$7.00+9%
DCF (10%)
$5.45+12%
Base IRR
+12%+0%–+25%
Visibility
moderate±32%
Wall Street
$6.20 target(5 analysts last year)(6 buy, 2 hold, 1 sell)
Rating
Revenue (TTM)
$3.8B
Owner Earnings
$950M
Next-Yr Owner Earnings
$820M
Growth
+5.0% × 2y
P / Next-Yr OE
7.8x
Net Debt
-$50M

B2Gold Corp. operates as a prominent gold mining enterprise, currently running three active production sites across different continents. Its primary operational mines include the Fekola Mine in Mali, the Masbate Mine situated in the Philippines, and the Otjikoto Mine located in Namibia. In addition to its wholly-owned assets, the company holds a 25% ownership stake in Calibre Mining Corp. and an approximate 19% interest in BeMetals Corp. Furthermore, B2Gold manages a diverse collection of evaluation and exploration assets spread across Mali, Uzbekistan, and Finland. The company, which was founded in 2006, bases its corporate headquarters in Vancouver, Canada.

2-Year Price History

$4.99+93.4%
$3.0$4.0$5.0$6.0Initial target $5.30 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
5.54.0–6.5
Setup
4.53.5–5.5
Fair value (USD)
5.303.60 – 7.00
Upside vs 4.85
+9%
DCF (10%)
5.453.60 – 7.40+12%
Base IRR
12%0% – 25%
Visibility
moderaterange ±32%
Sentiment
5/10
Reputation
4/10
2026-11-13 · claude-opus-5-5 · priced at 4.91

B2Gold is a ~0.85-1.1 Moz/yr gold producer (Fekola/Mali, Masbate/Philippines, Otjikoto/Namibia, Goose/Nunavut) that is finally coming out of a heavy capex and hedge-encumbered period: the gold prepay ended June 2026, the last collars roll off January 2027, Goose's Phase 1 crusher fix is done (3,200 tpd, 4,000 tpd targeted mid-2027 for ~300 koz/yr), and the Menankoto permit lets Fekola Regional add ~75 koz in 2027 and ~150 koz/yr from 2028. At $4.91 (Nov 13 close; the pack's 4.97/4.99 is slightly stale) the stock is ~$6.45B market cap, ~2.9x 2027E EBITDA and a ~12-13% 2027E FCF yield at $4,000 gold. That looks cheap, but most of it goes once you count ~$550-600M/yr of cash taxes, Mali's state minority and priority dividend, depletion (Masbate fades ~2030, Fekola complex reserves run to the mid-2030s), and the multiple a depleting, Mali-heavy miner deserves at year 5 (~5.5x FCF). My DCF at flat $4,000 gold gives ~$5.45/share, about 11% above the price. Each $500/oz move in gold shifts that by roughly $1.6. The market is pricing roughly $3,800-3,900 flat gold plus a Mali discount. That is reasonable after Barrick's 2025 Loulo-Gounkoto seizure and B2Gold's history of Goose overruns and permit delays. Rating 5.5: slightly undervalued if gold holds, with no clear mispricing. Interest 4.5: this is mainly a leveraged bet on the gold price with jurisdiction risk, and the 2027 catalysts are already well known and in consensus. Pass.

A deep dive would have to establish: Will gold hold near $4,000 while Mali leaves Fekola's cash flows (half the company's value) alone through the Regional ramp, so that 2028 FCF of about $1.2B is actually delivered and returned?

Owner earnings, TTM
$950M$700M – $1.2B
Realistic peak profit
$1.3B$850M – $1.7B
Growth rate
5.0%-3.0% – 12.0%
Years of growth
21 – 3
Market cap
$6.5B$6.3B – $6.6B
EV
$6.4B$6.2B – $6.7B
Net debt
-$50M-$250M – $150M
Capital return / cap
5.0%3.0% – 9.0%
P/E
6.8×5.0× – 9.5×
EV/EBITDA
2.9×2.3× – 4.0×
FCF yield
12.7%7.0% – 18.0%
Projected FCF, base case (USD millions)
Y1$820M$450M – $1.1B
Y2$1.2B$700M – $1.7B
Y3$1.1B$600M – $1.6B
Y4$1.1B$500M – $1.6B
Y5$900M$400M – $1.4B
Competition: Gold is a price-taker commodity, so B2Gold's position comes down to cost and jurisdiction; its AISC (~$2,300/oz, inflated by Mali royalties) is mid-to-upper cost curve versus senior peers that trade at higher multiples in safer countries.
Governance: Mali host-government risk (2023 code, $30M 2024 tax settlement, state 20% + priority dividend, precedent of Barrick's 2025 asset seizure), recent CEO succession, and poor employee/community relations; no accounting red flags found.
Research (expand)

What it does. B2Gold mines gold at four sites. Fekola complex in Mali is the core asset, 390-420 koz in 2026; the state owns 20% plus a priority dividend. The others are Masbate in the Philippines (180-200 koz), Otjikoto in Namibia (80-100 koz; the open pit is ending and the Antelope underground starts producing in 2029) and Goose in Nunavut (170-200 koz, ramping toward 300 koz). Gramalote in Colombia (100%) is an option, with a construction decision in H2 2027. 2026 guidance: 820-920 koz, AISC $2,230-2,410/oz. AISC is inflated by Mali royalties that are tied to the gold price.

What the market believes. The price says B2Gold is a depleting miner in a dangerous country with a bad record on execution: the Goose capex overrun and crusher fire, the Fekola Regional permit taking three years, the Mali tax settlement and new mining code. It also says the record gold price will not hold. On my numbers the stock is worth about $4.91 at roughly $3,800-3,900 flat gold. Gold spot is about $4,050-4,150.

What it earns. Q3 cash flow before working capital was $387M, with $47M of collar losses and $29M of one-off Goose costs, in the lowest-production quarter at $4,289 realized. Total capex was $191M. Normalized, the run rate is about $0.9-1.0B/yr of owner earnings before growth capex. Reported 9M FCF of $152M is distorted by prepay deliveries that brought in no cash. Management sees 2027 cash taxes a little under $600M at $4,000 gold, and Goose pays no tax until about 2031.

Projected FCF (unlevered, after Mali minority distributions, $4,000 gold, US$M):

  • 2027: 820. Phase 8 stripping at Fekola and the Goose Phase 2 shutdown; unhedged.
  • 2028: 1,230. Regional at about 150 koz, Goose at about 300 koz, ~1.08 Moz in total.
  • 2029: 1,150
  • 2030: 1,050
  • 2031: 900. Masbate fading and Goose starting to pay tax.

Year 5. Neither a star nor a corpse. It will be a slowly depleting producer of about 0.9-1.0 Moz with roughly 8-10 years of reserve life, which exploration can extend (the Tatuk discovery at Goose, Masbate extensions, sulfides at Fekola). I put it at 5.5x year-5 FCF.

DCF. The five years of FCF are worth $3.9B at 10%, and the terminal value adds $3.1B. Add ~$0.2B of net cash plus Q4 retention ($294M cash, ~$95M revolver drawn, leases). That gives ~$7.2B, or ~$5.45/share on ~1.315B shares. The Gramalote option is worth perhaps +$0.2. Each $500/oz of gold is worth about ±$1.6/share. Multiples at $4.91: 2027E P/E about 6.8x, EV/EBITDA about 2.9x, FCF yield about 12.7%. Those look cheap, but after taxes and capex this is a depleting asset. Fair value is $5.30, a little under the DCF to reflect Mali tail risk.

Management and returns. Founding CEO Clive Johnson retired in June 2026, and former CFO Mike Cinnamond is now CEO. The dividend is $0.08/yr (1.6%), and YTD buybacks were 41M shares for $205M, so capital returns of about 5% a year are real and should rise in 2027. On the negative side, Q3 buybacks slowed while they drew $95M on the revolver, and on the call they could not give the mining rate or grade behind the Regional plan. The Fekola technical report is out of date.

Risks. The gold price is the dominant one. Mali risk includes seizure, tax demands and the coup government; Barrick's 2025 experience is the precedent. Goose has a 10-week crusher shutdown in Q2 2027 and winter operations. Fuel costs are rising. Gramalote may need capex in Colombia. Employee and community relations are weak.

Sentiment: 4.5/10. Sell-side ratings are mostly Buy with a ~$6.35 target. Short interest is about 5% of shares. The stock sits mid-range ($3.57-6.29), and large holders have trimmed: FMR from 7.7% to 2.7%, Van Eck from 10% to 7%. Investors are lukewarm and see it as a cheap Mali-discounted gold beta.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue3802+52%3061+61%1902-2%1934+12%1733
Gross profit1819+58%1531+117%706-9%780+29%604
Operating expenses93.1-34%126-87%945+109%453+344%102
▸Adj EBITDA2266+62%1845129-82%728-18%887
▸Adj OCF1028+25%892-21%1130+36%830+21%685
CapEx-487-820-893-757-471
Adj FCF54171.5-70%237+226%72.6-66%213
Interest expense69.737.734.813.910.8
▸Adj net income802+63%804-57321.8-91%234
▸Owner's earnings400--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA4976100%1780100%1455100%93.0100%729100%919100%
FCF (OCF−capex)48710%36120%59.44%-12.2-13%-40.2-6%11913%
Net income104821%101357%40228%-630-677%10.11%25328%
▸Capital returned4369%34619%-120-8%-33.7-36%54.57%18921%
Buybacks46.1157-71.0-12.7-12.9-14.4
Dividends72177.0103184188168
Interest paid14547.337.734.813.910.8
Debt paid down-47664.5-190-240-13524.7
▸Reinvestment292359%9.311%84658%883949%71999%46651%
Capex (PP&E)3268325820893757471
Intangibles & M&A-345-3154.80-7.59-30.03.20
Leases signed (net Δ)-0.05-0.9320.8-3.31-8.63-7.97
Retained / other54011%37721%21215%64.069%-50.8-7%-62.7-7%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 62 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)62205869481148503680
▸Liabilities (total)181422341777960569
Net debt (incl. leases)24924589.3-114-594
Net debt / Adj EBITDA0.110.130.69-0.16-0.67
Net debt / Adj FCF0.463.420.38-1.57-2.78
Adj EBITDA / interest32.548.93.6952.381.8
Shares outstanding13171341131813181318
Dilution (YoY)+1.7%+1.7%+1.0%+21.1%+1.3%
Employees22120.000.000.000.00
MarginsTTM2025202420232022
Gross margin47.8%+1.850.0%+12.937.1%-3.240.3%+5.434.9%
Adj EBITDA margin59.6%+3.760.3%+53.56.8%-30.937.7%-13.551.2%
Adj OCF margin27.0%-5.729.1%-30.359.4%+16.542.9%+3.439.5%
Adj FCF margin14.2%+17.32.3%-10.112.4%+8.73.8%-8.612.3%
Net income margin31.1%+22.413.1%+46.2-33.1%-33.60.5%-14.114.6%
Adj NI margin21.1%+1.526.3%+56.4-30.1%-31.31.1%-12.413.5%
ROIC (adj, after-tax)22.8%21.6%-5.5%5.3%10.7%
Cost of debt13.0%7.1%15.5%----

Earnings Calls

12 calls

Earnings Call · 2026 Q3

2026-11-05

B2Gold reported a strong third quarter 2026, with CEO Mike Cinnamond saying it reinforced progress in strengthening the business. Consolidated production was about 193,000 ounces, keeping the company on track for full-year guidance. Based on year-to-date performance, B2Gold lowered consolidated AISC guidance by more than $100/oz at the midpoint, to $2,230-$2,310 per ounce sold. Free cash flow was $48 million, with major Goose construction and ramp-up spending behind it and gold prepaid deliveries completed in June. The company returned $59 million to shareholders, including $33 million of buybacks. Remaining gold collars roll off in January 2027, leaving the company unencumbered in 2027. Financially, revenue was $836 million on about 195,000 ounces sold at a realized price of $4,290/oz, the first full quarter at spot prices. Net income attributable to shareholders was $49 million ($0.31/share), including a $253 million Fekola impairment reversal following receipt of the regional permit, $40 million of unrealized derivative gains and $14 million of insurance recoveries. Adjusted net income was $183 million ($0.14/share), reduced by $47 million of realized collar losses. Operating cash flow before working capital was $387 million. Cash was $294 million, working capital $497 million, and $705 million was available on the revolver. Goose AISC was inflated by about 10,000 unsold ounces and $29 million of one-time costs ($12 million mobile crusher, $17 million fire remediation). Guidance cuts came at Masbate (AISC $1,250-$1,400), Otjikoto (AISC $1,630-$1,780) and Fekola (AISC $2,350-$2,500, mostly from lower royalties). Operationally, Fekola produced about 78,000 ounces as it moved into Phase 8 waste stripping, which continues through most of 2027. The Menankoto permit was received August 7 and stripping has begun. Regional ore is expected in early 2027, ramping through the year (roughly half of the 150,000 oz/yr steady state in 2027), subject to an administrative tolling agreement. Goose produced about 40,000 ounces. The Phase 1 crusher upgrade was completed in mid-October and throughput is averaging about 3,200 tpd. Phase 2 is planned for Q2 2027, with a 10-week shutdown covered by stockpiled ore and the mobile crusher, targeting 4,000 tpd by mid-2027 and a path to 300,000 oz/yr. Exploration at Goose produced the Tatuk discovery, the first new discovery since acquisition. Gramalote decisions are expected in the second half of 2027. Management expects a stronger Q4 and highlighted 2027 catalysts including Fekola Regional, Goose Phase 2, Antelope development and potential Masbate life extensions. In Q&A, management said Goose steady-state AISC should be slightly above $2,000/oz, Goose won't pay cash taxes for about five years at $4,000 gold, 2027 cash taxes should be under $600 million, and an updated Fekola technical report is on the radar.

Analyst Q&A (13)
▸
Is the Fekola Regional toll milling arrangement merely administrative, or are terms still being negotiated in a way that could affect guidance?
Don DeMarco · Stifel
It is an administrative exercise. Agreements are drafted and the company is working through the state's normal steps, such as setting up a new company. Management has left plenty of time before the early 2027 start and is proceeding as planned.
▸
With Goose at 3,200 tpd until mid-2027, is there upside to that rate, have there been days above it, and what are the weather risks?
Don DeMarco · Stifel
Peter Montbault said the Phase 1 primary crusher consistently maintains 3,200 tpd and the mobile crusher adds flexibility above that. The mill has been tested to 4,000 tpd. The primary crusher is all-weather, and the mobile crusher is under a tent, so it won't reach summer capacity but will operate through winter.
▸
Is the Fekola open pit grade of about 1.35 g/t (lighter than expected) representative of Q4 and next year?
Anita Soni · CIBC World Markets
Michael McDonald said Q4 grade should be very similar to Q3 and consistent with the revised guidance range. 2027 budgets are still being finalized, with numbers due in February. Cinnamond added that Phase 8 waste stripping means mostly low-grade stockpiles plus Fekola Underground until regional ore comes online. Bill Lytle indicated roughly 1.2 g/t for Q4.
▸
What Q4 open pit and underground grades are needed at Goose, given the roughly 7.3 g/t delivered in Q3, to reach the low end of guidance?
Anita Soni · CIBC World Markets
Peter Montbault confirmed her math. Open pit and underground grades will be similar to prior quarters, with the difference being a full quarter of consistent production. The mobile crusher gives flexibility between 3,200 and 4,000 tpd to manage tonnes, grade and ounces, including mining more and selectively feeding higher-grade ore.
▸
What is a reasonable normalized annual AISC and sustaining capex for Goose at design throughput?
Don DeMarco · National Bank Financial
Michael McDonald said Q4 AISC will be significantly lower. Adjusted for unsold ounces and one-time costs, Q3 would have been near the top of the annual range. Goose has largely fixed costs, so scale helps, and the company targets steady-state AISC slightly above $2,000/oz.
▸
How variable will Fekola production be by quarter in 2027 with Phase 8 stripping and the Regional ramp-up?
Don DeMarco · National Bank Financial
Guidance will come in early February. Regional is a ramp-up year in 2027, so as a rule of thumb about half of the 150,000 oz/yr steady-state level can be assumed for next year.
▸
What mining rates and grades support the 150,000 oz/yr Fekola Regional target, and how much capex remains before steady state?
Don DeMarco · National Bank Financial
Operations staff did not have the study details at hand and will follow up. Michael McDonald said most remaining capex is waste stripping, since infrastructure was largely built in 2023, plus equipment rebuilds and modest capitalized stripping. Fekola gets multiple years of lower strip ratio and better grade after Phase 8, with Regional steady at about 150,000 oz until the mid-2030s.
▸
Will B2Gold publish an updated mine plan or technical report for Fekola?
Don DeMarco · National Bank Financial
Yes, it is on the radar. The existing Fekola complex technical report is older and assumed a different Regional startup timing, so an update is planned for better visibility.
▸
During the Q2 2027 Goose Phase 2 shutdown of about 10 weeks, should 3,200 tpd still be modeled?
Fahad Tariq · Jefferies
Yes. The mobile crusher is building a crushed ore stockpile (maximum about 200,000 tonnes, but far less is needed) and will keep running during the shutdown, so 3,200 tpd is a fair assumption.
▸
How do the diesel prices for the Goose sealift compare with the budget at the start of the year?
Fahad Tariq · Jefferies
Michael McDonald said the purchase was made in Q3 at elevated global prices, roughly 50-60% higher per unit than last year. Because the site uses less fuel than expected, total cost to buy and ship fuel was similar to last year.
▸
What tonnage is Fekola Underground producing, and is it at steady state? What is the grade?
Carey MacRury · Canaccord Genuity
Bill Lytle said it is running at about 4,000 tpd and is fully ramped up, with grades around 3 to 3.5 g/t. It is the highlight of Fekola at present.
▸
When will Goose become cash taxable?
Carey MacRury · Canaccord Genuity
Michael McDonald said that at $4,000 gold, Goose would not pay cash taxes for about five years, into the early 2030s, as it works through its losses.
▸
Will 2027 cash taxes be higher than this year at $4,000 gold?
Carey MacRury · Canaccord Genuity
Likely slightly lower, since Goose's production growth is not taxable. Preliminary view is a bit under $600 million including withholding taxes, pending budget work.

Options

Chain Snapshot (daily)

Call IV (ATM)92%
Put IV (ATM)35%
ATM Spread4.3%
Call $OI (near money)$15.7M
Put $OI (near money)$1.0M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$4.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$2.50$2.40/$2.800--/$0.100
$3.00$1.90/$2.3510--/$0.100
$3.50$1.45/$1.901--/$0.100
$4.00$1.00/$1.251--/$0.159
$4.50$0.60/$0.8014$0.10/$0.15226
$5.00$0.35/$0.45154$0.30/$0.35102
$5.50$0.20/$0.30166$0.45/$0.7061
$6.00$0.05/$0.1552$0.90/$1.2057
Snapshot: 2026-11-04

Short Interest

Short % of Float5.1%
Short Shares67.1M
Days to Cover3.0
Change (vs Prior)-0.2%
Short % Float History
5.10%+0.60pp
3.0%4.0%5.0%6.0%10-1512-3103-1305-2908-1410-30

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
VAN ECK ASSOCIATES CORP$341M$3.03−$15.9M−$150M—$164.08B
Pale Fire Capital SE$241M$3.14−$19.4M−$4.5M—$1.41B
L1 Capital Pty Ltd$183M$3.74+$183M+$183M—$2.97B
AMERICAN CENTURY COMPANIES INC$147M$3.23+$16.1M+$35.9M—$225.72B
VANGUARD CAPITAL MANAGEMENT LLCPassive$138M$4.53−$273K+$138M—$4.68T
TWO SIGMA INVESTMENTS, LP$136M$3.61−$24.7M+$31.2M—$128.44B
DIMENSIONAL FUND ADVISORS LPPassive$132M$3.42+$6.8M+$21.0M—$551.30B
Connor, Clark & Lunn Investment Management Ltd.$108M$3.65+$48.2M+$71.2M—$52.75B
MILLENNIUM MANAGEMENT LLC$92.8M$3.75+$6.9M+$49.1M—$142.62B
D. E. Shaw & Co., Inc.$71.5M$4.28−$34.1M+$70.9M—$153.37B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

095.9M191.8M287.7M383.6M$2.38$3.01$3.65$4.28$4.912021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
VAN ECK ASSOCIATES CORP91.1MFMR LLC10KPale Fire Capital SE64.6MTWO SIGMA INVESTMENTS, LP36.5ML1 Capital Pty Ltd48.8MAMERICAN CENTURY COMPANIES INC39.3MD. E. Shaw & Co., Inc.19.1MRENAISSANCE TECHNOLOGIES LLC6.3MROYAL BANK OF CANADA4.3MARROWSTREET CAPITAL, LIMITED PARTNERSHIP60K

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
IAUXi-80 Gold Corp.3271.96×
ELE.TOElemental Royalty Corporation3233.11×
EQXEquinox Gold Corp.4181.31×
RGLDRoyal Gold, Inc.395.98×
BBarrick Mining Corporation463.99×
WPMWheaton Precious Metals Corp.463.99×
FNVFranco-Nevada Corporation346.62×
AEMAgnico Eagle Mines Limited436.26×
NEMNewmont Corporation333.30×

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (5 analysts)$6.20+40.3%
Current Price$4.42
Analyst Ratings
1
5
2
1
Strong Buy: 1Buy: 5Hold: 2Sell: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2010 Q252M-5M-9M$0.05$0.04 – $0.058
2010 Q354M60M43M$0.04$0.03 – $0.0514
2011 Q254M19M10M$0.03$0.03 – $0.049
2011 Q359M19M11M$0.07$0.06 – $0.0811
2012 Q175M29M17M$0.07$0.06 – $0.0813
2012 Q243M19M9M$0.03$0.02 – $0.0414
2012 Q367M27M14M$0.05$0.04 – $0.0617
2013 Q1133M15M0M$0.05$0.04 – $0.0618
2013 Q2368M82M50M$0.05$0.04 – $0.0517
2013 Q3193M36M11M$0.04$0.03 – $0.0519
2014 Q1129M3M-24M$0.03$0.02 – $0.0412
2014 Q2325M-1M-31M$0.05$0.04 – $0.0613
2014 Q3115M-709M-740M$0.03$0.02 – $0.0311
2016 Q2110M36M-6M$0.01$0.01 – $0.0116
2016 Q3154M80M26M$0.03$0.02 – $0.0412
2017 Q2164M75M21M$0.01$0.01 – $0.0113
2018 Q1348M172M65M$0.08$0.06 – $0.107
2018 Q2194M84M16M$0.03$0.02 – $0.047
2018 Q3280M91M11M$0.05$0.04 – $0.0619
2019 Q1302M87M15M$0.04$0.04 – $0.0418
2019 Q2299M104M30M$0.03$0.03 – $0.0313
2019 Q3309M112M31M$0.07$0.07 – $0.079
2019 Q4324M297M177M$0.07$0.07 – $0.079
2020 Q1380M167M72M$0.10$0.10 – $0.108
2020 Q2442M251M135M$0.12$0.12 – $0.128
2020 Q3487M389M244M$0.14$0.14 – $0.1414
2020 Q4480M294M168M$0.14$0.14 – $0.1411
2021 Q1362M153M65M$0.07$0.07 – $0.073
2021 Q2363M193M88M$0.07$0.07 – $0.073
2021 Q3511M283M133M$0.13$0.13 – $0.136
2021 Q4526M298M137M$0.11$0.11 – $0.113
2022 Q1366M163M65M$0.05$0.05 – $0.054
2022 Q2382M225M111M$0.06$0.06 – $0.065
2022 Q3393M282M146M$0.05$0.05 – $0.058
2022 Q4592M296M128M$0.12$0.12 – $0.124
2023 Q1433M203M82M$0.07$0.07 – $0.073
2023 Q2464M276M141M$0.07$0.07 – $0.075
2023 Q3462M337M184M$0.06$0.04 – $0.099
2023 Q4512M265M120M$0.08$0.06 – $0.117
2024 Q1436M214M90M$0.05$0.04 – $0.078
2024 Q2473M239M108M$0.07$0.05 – $0.087
2024 Q3449M196M80M$0.05$0.04 – $0.079
2024 Q4502M221M92M$0.06$0.04 – $0.079
2025 Q1570M237M112M$0.08$0.08 – $0.085
2025 Q2712M353M194M$0.13$0.10 – $0.2011
2025 Q3846M343M185M$0.12$0.09 – $0.207
2025 Q41.1B519M278M$0.19$0.14 – $0.247
2026 Q1893M404M179M$0.12$0.11 – $0.136
2026 Q2836M269M107M$0.07$0.05 – $0.097
2026 Q3823M359M178M$0.12$0.05 – $0.177
2026 Q4972M465M257M$0.17$0.15 – $0.204
2027 Q11.1B535M307M$0.21$0.17 – $0.233
2027 Q21.1B547M313M$0.21$0.21 – $0.211
2027 Q31.2B600M350M$0.24$0.24 – $0.241
2027 Q41.2B618M359M$0.24$0.24 – $0.241
2028 Q11.4B671M395M$0.27$0.27 – $0.272
2028 Q21.4B689M404M$0.27$0.27 – $0.272
2028 Q31.4B845M521M$0.35$0.35 – $0.352
2028 Q41.4B860M527M$0.36$0.36 – $0.362
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand

Thesis

B2Gold is transitioning from a capital-intensive buildout to a potentially much stronger cash-generation phase. The key assets are increasingly visible: Fekola remains a high-quality producing complex, the Menankoto permit removes a major near-term permitting blockage, and Goose offers substantial production growth if the crusher and underground ramp proceed as planned. The expiration of gold prepayments and collars in June and December 2026, respectively, should improve the quality and flexibility of future cash flow. The principal risks are operational execution at Goose, political and fiscal intervention in Mali, the still-heavy capital program, and dependence on a supportive gold price. The Q2 result itself was weak on cash flow, with negative free cash flow driven by taxes, the priority dividend, prepayment deliveries and ongoing investment, but much of that burden is transitional. Management's refusal to provide 2027 Fekola grade and capital guidance appropriately keeps uncertainty elevated. Overall, the business is improving, but the cash economics have not yet fully demonstrated the strength implied by adjusted EBITDA.

Trade Signal

Trade rating
-4.3/10
No trade
Horizon
~3mo
gpt-5.6-luna2026-08-07 · saw $5.01-3.2% since

Short BTG modestly: the shares appear materially overvalued after a post-earnings surge, with the $6.7 billion market cap pricing in successful Goose/Fekola execution that the analyst's $3.75 billion fair value does not support.

Temporary mispricing-6.0

BTG climbed from roughly $2.4–$3.3 during 2024–mid-2025 as gold and operating expectations improved, then rose to $4.9 by September 2025 and reached $6.14 in late February 2026 before retreating to the high-$3s by June/July. The February/March reversal was a broad, volatile risk/commodity repricing rather than a single fundamental break. From $3.79 on August 4 to $5.03 after the August 7 earnings report, the shares jumped about 32% in one month and 22% across the earnings timing despite Q2 free cash flow of negative $258 million, narrowed production guidance and Goose disruption. The latest move looks overbought: the market reacted strongly to the permit and future cash-flow narrative while largely ignoring execution and capital risks. That gap can mean-revert after the report is digested, although a durable gold rally could prevent full normalization.

Market view+5.5

The market is constructive to bullish: analyst consensus is Buy, the average one-year target is about $6, and recent price strength reflects enthusiasm for gold, the Menankoto permit, the Fingold cash sale and improving Goose visibility. The stock is not euphoric on short interest, but positioning is clearly not skeptical enough to create a large short squeeze. Bears point to the 35% Mali interest, Goose execution, high capex and poor recent FCF conversion. The prevailing view appears to overweight the future production ramp and underweight the price already paid for it.

Inflectionwindow ~3mo+2.5

There is a genuine operational inflection, but it is not clearly underappreciated. Goose's crusher repair and ramp toward roughly 300,000 ounces, the Menankoto permit and the ending of prepayments/collars could lift cash generation from 2027 onward. The analyst's base case already assumes Goose reaches 300,000 ounces and Fekola Regional ramps, while the bullish consensus target near $6 implies even more favorable execution. The inflection is therefore positive but substantially priced in, with Mali fiscal terms and execution risk limiting conversion to equity cash flow.

Catalysts
  • ▲2026-11 · Q3 2026 earnings and Goose crusher remediation update — Expected by November 2026; confirmation of throughput above 3,000 tonnes/day and progress toward the 300,000-ounce run rate would support the bull case.
  • ▲2026-12 · Gold collars expire and prepayment obligations remain ended — The December collar expiry should improve realized-price exposure and cash-flow flexibility, although it also increases commodity-price sensitivity.
  • ▲late 2026 · Fekola Regional pre-stripping advances — Pre-stripping is expected through year-end 2026, with ramp-up toward more than 150,000 ounces annually from 2028; execution or renewed Mali friction is the key risk.
  • •2026-12 to 2027-02 · 2027 production and capital guidance — Likely around Q4 2026 or Q1 2027; guidance will test whether Goose and Fekola growth offsets elevated capital requirements and Mali's 35% participation.
  • ▲2027-02 · Q4 2026 / full-year earnings — The first clean period after prepayments and collars could demonstrate stronger free-cash-flow conversion, but misses at Goose or Fekola would pressure the shares.
  • ▲2027-H1 to H2 · Goose ramp toward steady-state production — Throughput is expected to reach approximately 4,000 tonnes/day in H2 2027, beyond the immediate 12-month window but likely to influence valuation earlier.
Flow+2.0

Year-to-date repurchases of approximately $172 million plus $52 million of dividends are supportive, and management expects stronger cash generation to fund further returns. Offsetting this, TTM dilution is about 2%, SBC/share issuance is not immaterial, and there is no major squeeze or takeover setup; short interest is only 4.9% of float. Net flow is modestly positive but not powerful enough to overcome valuation.

Floor / Ceiling-1.5

There is no hard floor near the current price. Producing assets, expected owner earnings, cash of roughly $287 million, dividends and repurchases provide some support, but mining assets are exposed to gold prices, cost inflation, jurisdictional risk and substantial development capital. The main ceiling is valuation: at roughly $6.7 billion of equity value, the stock requires a meaningful portion of the $650–900 million owner-earnings scenarios to be realized, while consensus is already strongly bullish.

Buyability

Real buyers can own BTG as a liquid, profitable gold producer with a consensus Buy rating, 2% dividend and ongoing repurchases. However, the current price already discounts a strong gold environment and successful Goose/Fekola execution; the next marginal buyer needs either materially higher gold prices or proof that owner earnings can approach the bull case.

Fear vs Greedfear 5/10 (-2.0)greed 7/10 (+3.0)

Fear pulls harder than greed at $5.03. The business is improving and gold exposure can produce upside surprises, but the shares rose 22% into/through an operationally mixed earnings report and trade about 34% above the analyst's already optimistic base fair value. The risk-reward is asymmetric unless gold remains exceptionally strong and both Goose and Fekola execute cleanly.

Valuation

Our Target
$3.8B-36%
Market Should Pay
$3.6B-39%
target ×0.95 (fear discount)
Current Market Cap
$5.8BNeutral
What Changed
transcript · 2026-08-07
+10%fair value on this information

The genuinely new information is the issuance of the Menankoto exploitation permit, allowing B2Gold to begin pre-stripping Fekola Regional rather than continuing to wait for authorization. The quarter also clarified that prepayments ended in June, the Goose replacement crusher was being commissioned, and the company still expects a substantial 2027 Goose ramp. Offsetting news was the narrowed 2026 production range, negative Q2 free cash flow and management's continued unwillingness to provide firm 2027 Fekola grade or capital guidance.

▸ How the cases moved

The bear equity value rises from approximately $650M to $750M as the Menankoto permit reduces the probability of a prolonged Fekola Regional blockage, although the weaker Q2 cash flow and narrowed 2026 production range prevent a larger improvement. The base case rises from approximately $4,700M to $5,200M because the permit is now actionable, prepayment obligations have ended, and Goose's repair and throughput timetable remains intact. The bull case rises from approximately $7,500M to $8,100M as Fekola Regional can begin pre-stripping and management reiterated a path to roughly 300,000 Goose ounces and 4,000 tonnes per day. The probability of the base case increases from 0.48 to 0.50, bull from 0.23 to 0.25, and bear falls from 0.29 to 0.25.

2-Year Plausible Outcomes
bear25%
$750M
rev -5%/yrOE $150M

Gold prices weaken, Goose remains operationally difficult, Fekola Regional ramps slowly or faces renewed Mali friction, and high development spending absorbs much of the cash flow. Production declines modestly and owner earnings settle near $150M.

▸ Valuation

5x $150M owner earnings = $750M equity value

base50%
$5.2B
rev +8%/yrOE $650M

Goose reaches approximately 300,000 ounces of annualized production during 2027, while Fekola Regional ramps toward its planned 150,000-ounce run rate. The end of gold prepayments and collars allows materially better free cash flow, although Mali's 35% ownership and continued growth capital limit conversion. Gold prices remain broadly supportive and owner earnings reach approximately $650M.

▸ Valuation

8x $650M owner earnings = $5,200M equity value

bull25%
$8.1B
rev +15%/yrOE $900M

Goose reaches roughly 300,000 ounces on schedule and continues toward 4,000 tonnes per day, Fekola Regional ramps efficiently, Fekola remains a cornerstone complex, and gold prices stay elevated. Prepayment obligations have ended, sustaining capital normalizes, and substantial excess cash is returned through dividends and repurchases. Owner earnings rise to approximately $900M.

▸ Valuation

9x $900M owner earnings = $8,100M equity value

▸ Target Rationale

The probability-weighted discounted value is $3,850M. I set the analytical target modestly lower at $3,750M because the scenario arithmetic does not fully capture execution risk at Goose, Mali's higher effective fiscal burden and 35% state participation in Fekola Regional, the company's history of consuming EBITDA through capital investment, and the still-uncertain 2027 Fekola plan. The discount is not a sentiment adjustment; sentiment is reflected separately in the fear-greed modifier.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now6/10
Trajectory8/10
Risk5/10
Governance6/10
Insolvency prob (2yr)2%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Executive Succession: On February 23, 2026, B2Gold announced that co-founder and long-time President and CEO Clive Johnson would retire at the Annual General Meeting on June 4, 2026. Mike Cinnamond, previously the Senior VP of Finance and CFO, succeeded Johnson as the new President and CEO and joined the Board of Directors. Concurrently, Michael McDonald transitioned to the role of CFO.
  • Divestment of Fingold Interest: On April 20, 2026, B2Gold entered into an agreement to sell its 70% stake in Fingold Ventures Ltd. (Finland) to Agnico Eagle Mines for US$325 million in cash. The transaction closed on April 23, 2026, providing B2Gold with a significant liquidity boost to fund its capital programs and share buybacks.
  • Q1 2026 Operational & Financial Results: Released on May 6, 2026, B2Gold delivered first-quarter earnings per share (EPS) of $0.19, surpassing the consensus estimate of $0.13. Despite local permitting headwinds in Mali, the flagship Fekola Mine outperformed internal plans, producing 117,450 ounces of gold at lower-than-expected all-in sustaining costs (AISC).
  • Goose Mine Fire Incident: On April 16, 2026, a fire broke out in the crushing circuit area of the Goose Mine in Nunavut, Canada. The company reported that the fire caused no injuries, was limited to the secondary crusher screen and feed belt, and had no impact on the power facility or processing mill.
▸ Thesis-test Findings
Mali government Fekola Regional exploitation permit update 2026

Delays in receiving the Fekola Regional exploitation permit continue to serve as a major near-term operational risk (bear case). Originally expected in Q3 2025 and subsequently projected for Q1 2026, the permit has still not been physically issued by the Malian government as of mid-2026. Because of this delay, B2Gold reported zero mining activity from Fekola Regional in the first quarter of 2026. Management stated that meeting the Fekola Complex's 2026 production guidance range of 410,000 to 460,000 ounces is contingent on receiving this permit by June 30, 2026, after which a three-month pre-stripping phase would commence ahead of production. Under a 2024 agreement, the state's interest in the Fekola Regional deposits has been negotiated to 35% (compared to 20% in the core Fekola Mine), but once the permit is issued, Fekola Regional is expected to supply an average of 180,000 ounces of gold annually through 2031.

B2Gold Goose project crushing circuit repair status Q2 2026

The April 2026 fire at the Goose Mine crushing circuit required B2Gold to temporarily adjust its Q2 2026 operational plan, utilizing available mobile crushers and bringing in additional temporary crushing capacity to feed ore to the fine stockpile. This operational pivot has cut projected Q2 2026 output at the mine by approximately 10,000 ounces down to a revised forecast of 18,000 to 20,000 ounces. Repairs are estimated to cost C$10 million and are projected to be completed in Q3 2026, coinciding with the planned installation of a run-of-mine bin and apron feeder. Although this incident represents a temporary bottleneck, the overall thesis is protected by the fact that B2Gold has maintained its full-year 2026 gold production guidance for the Goose Mine of 170,000 to 230,000 ounces, targeting a daily crushing throughput of 3,200 tonnes by the end of Q3 2026.

Agnico Eagle and B2Gold Arctic collaboration agreement details

Concurrently with the sale of the Fingold JV in April 2026, B2Gold and Agnico Eagle entered into the "Nunavut Collaboration Agreement". This non-exclusive agreement focuses on knowledge-sharing and operational cooperation between B2Gold's Goose Mine and Agnico Eagle’s operating Arctic assets, including the Meadowbank and Meliadine mines. The agreement does not involve any transfer of ownership or asset integration but establishes a framework for technical exchanges in logistics, procurement, arctic processing, and community relations. For the bull case, this collaboration is a vital risk-mitigation tool. It allows B2Gold to tap into Agnico Eagle’s extensive, decades-long operating expertise in northern environments, helping B2Gold navigate the immense infrastructure, weather, and logistics challenges inherent to ramping up the Goose Mine.