Stocks/KGC

KGC

Kinross Gold Corporationv3 5.5/10 · 2026-10-29
Basic Materials·Gold
$19.69
$21.5B market cap
0.6% div yield
v3 Rating
5.5/104.5–6.5
Setup
4.5/103.5–6.0
Fair Value
$23.00$14.00–$36.00+17%
DCF (10%)
$24.00+22%
Base IRR
+12%-3%–+25%
Visibility
wide±48%
Wall Street
$37.75 target(4 analysts last quarter)(17 buy, 9 hold, 3 sell)
Rating
Revenue (TTM)
$8.4B
Owner Earnings
$2.2B
Next-Yr Owner Earnings
$1.3B
Growth
+4.0% × 5y
P / Next-Yr OE
18.5x
Net Debt
-$1.9B

Kinross Gold Corporation, along with its various affiliates, is dedicated to acquiring, exploring, and developing gold deposits primarily across regions such as the United States, Russia, Brazil, Chile, Ghana, and Mauritania. Beyond these core operations, the company also handles the mining and processing of gold-bearing ores, conducts rehabilitation of former gold mining sites, and produces and sells silver. Kinross Gold Corporation was established in 1993 and maintains its corporate headquarters in Toronto, Canada.

2-Year Price History

$22.53+127.8%
$10$15$20$25$30$35Initial target $23.00 · 2026-10-29volNov 24Feb 25Jun 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-29

Rating
5.54.5–6.5
Setup
4.53.5–6.0
Fair value (USD)
23.0014.00 – 36.00
Upside vs 19.69
+17%
DCF (10%)
24.0011.00 – 41.00+22%
Base IRR
12%-3% – 25%
Visibility
widerange ±48%
Sentiment
4/10
2026-10-29 · claude-opus-5-5 · priced at 21.60

Kinross is a 1.85 Moz/yr senior gold miner (Paracatu in Brazil and Tasiast in Mauritania make up more than half of output) with a net-cash balance sheet ($1.9B), a BBB rating and a 50%-of-FCF return policy that has bought back about 5% of shares since April 2025. The stock is $21.60 (Oct 29 close; the pack showed $21.23 and $22.53). That is 43% below its February high of $38 and at the bottom of its 1-year range. Three things took it down: gold fell from a $5,600 record to about $4,025 as the market started pricing a December Fed hike, the September 23 update cut 2026-27 output 8% and lifted AISC to $1,850-1,900, and capex is set to rise as Great Bear moves into construction in 2027 at a cost management admits will be above the $1.4B PEA. At spot gold the business makes about $2.2B of real free cash flow. That is cash from operations of about $3.3B less about $1.1B of sustaining capex, stripping and mine-life spend, which is a treadmill for any miner. Against a $25.3B market cap it is an 8-9% yield, about 5.6x EV/EBITDA and about 12x earnings. But reported FCF dips to about $1.3-1.4B in 2027-29 while Great Bear and Lobo-Marte are built, before production climbs toward 2.3+ Moz in the early 2030s. A DCF with flat $4,000 gold and 12x year-5 FCF gives about $24 a share, only about 12% upside. Each $100/oz move in gold changes that by about $1.40 a share, so the value depends on gold, not on a mispricing we could find by research. Rating 5.5/10: a decent, shareholder-friendly miner priced fairly at spot gold, cheap only if gold recovers above about $4,600. It is not a 40%-undervalued setup on company-specific grounds. Implied volatility of 45-47% near the 1-year low makes it a reasonable name to sell puts or covered calls on for anyone who wants gold exposure, though earnings are not predictable enough to call it a true valuation floor. Research rating 4.5/10: the main open question, the gold price, cannot be settled by more work. Great Bear capex and permitting (H1 2027) are the resolvable items.

A deep dive would have to establish: Whether Great Bear's 2027 capex reset and permitting (IBA, federal IA decision) keep the 2028-2031 growth to ~2.3+ Moz at falling unit costs, so that Kinross is worth materially more than spot-gold DCF value even if gold stays near $4,000.

Owner earnings, TTM
$2.2B$1.5B – $2.9B
Realistic peak profit
$3.0B$2.0B – $4.5B
Growth rate
4.0%-3.0% – 10.0%
Years of growth
52 – 10
Market cap
$25B$25B – $26B
EV
$23B$23B – $24B
Net debt
-$1.9B-$2.2B – -$1.5B
Capital return / cap
4.0%2.0% – 6.0%
P/E
12.0×10.0× – 15.0×
EV/EBITDA
5.6×4.5× – 7.5×
FCF yield
8.7%6.0% – 11.5%
Projected FCF, base case (USD millions)
Y1$1.3B$600M – $2.0B
Y2$1.4B$500M – $2.4B
Y3$1.3B$400M – $2.4B
Y4$1.9B$900M – $3.1B
Y5$2.7B$1.3B – $4.2B
Competition: Gold is a commodity, so Kinross competes on cost and jurisdiction against Agnico Eagle, Newmont, Barrick and mid-tiers; it sits mid-curve on AISC (~$1,875/oz) with a Mauritania/Brazil jurisdiction discount that Great Bear should gradually narrow.
Governance: No current governance issues; past blemishes are the Red Back/Tasiast acquisition write-downs, the 2022 Russia exit and a 2018 SEC internal-controls settlement tied to Mauritania/Ghana.
Research (expand)

What the company does

Kinross Gold (TSX: K, NYSE: KGC), Toronto-based senior gold producer. 2026 attributable output guided at 1.84-1.86 Moz gold-equivalent (cut on Sept 23, 2026 from ~2.0 Moz), and the same for 2027. Core assets: Paracatu (Brazil, ~600 koz/yr, cost of sales ~$1,240/oz) and Tasiast (Mauritania, ~505 koz/yr, ~$1,050/oz, the lowest-cost mine). Together they make up more than half of production and most of the free cash flow. Smaller, higher-cost assets: La Coipa (Chile; hit by Q3 weather and copper-rich sulphide ore, $2,190/oz in Q3), Fort Knox and Manh Choh (Alaska, 70%), Round Mountain and Bald Mountain (Nevada, Round Mountain at $2,560/oz in Q3 with 60% recovery). Pipeline: Great Bear (Ontario; ~500 koz/yr high-grade underground, first gold targeted late 2029, federal decision needed by late spring 2027), Lobo-Marte (Chile; 350 koz/yr, $1.8B capex, $1,000/oz AISC, early 2030s), the US grade projects Phase X, Curlew and Redbird (2028), and the Fort Knox Phase 11 layback (~2 Moz, study H1 2027). Resources: 27 Moz M&I plus 17 Moz inferred.

The investment case

  • Balance sheet and returns: $2.6B cash, $0.74B debt, net cash $1.9B at Sept 30. S&P upgraded the rating to BBB. The 2026 return target went from 40% to 50% of FCF. About $950M was returned year to date, including $690M of buybacks in 9M plus $100M after quarter end. Shares fell from 1,199.8M at Dec 31, 2025 to 1,178.0M at Sept 30, 2026, or about 1,173M after the October buyback.
  • Grade enhancement from 2028: Phase X and Curlew start, and Tasiast reaches high grade at the bottom of the pit. Management reiterates ~2.0 Moz for 2028. Great Bear (~500 koz) and Lobo-Marte (~350 koz) could lift output to about 2.4-2.6 Moz in the early 2030s at lower unit costs.
  • Why it is down: (1) Gold dropped from a $5,598 record to about $4,025 (Oct 29) on strong US data (Q3 GDP 3.4%, PCE 3.6%) and a 10-2 Fed hold with two dissents for a hike. (2) The Sept 23 production cut and AISC raise sent the stock down 10% that day. (3) The coming capex ramp: Great Bear spend goes from $260M in 2026 to above the PEA's ~$500M in 2027, Lobo-Marte construction runs 2028-29, the Great Bear budget will exceed the $1.4B PEA (management ruled out doubling it), and AISC inflation is about 5%/yr. (4) Grassy Narrows First Nation's appeal of the Great Bear AEX permits.

What it earns today (real free cash flow)

Q3 2026: revenue $1,775M on 412 koz sold at a realized $4,249/oz. Cost of sales was $1,502/oz and AISC $1,947/oz. Adjusted OCF was $831M, capex $440M and attributable FCF $281M, held down by working capital. 9M 2026: adjusted OCF $3.07B, capex $1.13B, attributable FCF $1.85B at an average realized $4,549/oz.

Re-based to spot gold (~$4,025) and 1.85 Moz, operating cash flow is about $3.3B a year. 2026 capex guidance is $1.5B: $450M sustaining and $1,050M non-sustaining. Much of the non-sustaining spend is capitalized stripping and mine-life extension (Round Mountain Phase S, Tasiast and La Coipa pushbacks, Redbird, Phase X). For a miner that is the treadmill needed just to hold ~2 Moz. Only Great Bear, Lobo-Marte and part of the US projects add net production. I count about $1.1B a year as maintenance. Stock comp is small (about $20M in 9M, with cash-settled units already running through G&A). Real FCF ≈ $2.2B (range $1.5-2.9B, driven almost entirely by gold). That is about 8.7% of the $25.3B market cap. Reported FCF after all capex at spot is about $1.8B now, falling toward $1.3B in 2027.

FCF for the next 5 years (base: flat $4,000 gold, 5% cost inflation partly offset by grade; after all capex and SBC, before interest)

| Year | Production (Moz) | Capex ($B) | FCF ($B) |

|---|---|---|---|

| 2027 | 1.85 | ~1.9 (Great Bear construction, Fort Knox Phase 11) | 1.25 |

| 2028 | ~2.0 | ~2.1 (Great Bear peak, Lobo-Marte starts) | 1.40 |

| 2029 | ~2.0 | ~2.1 | 1.30 |

| 2030 | ~2.15 (Great Bear ramp) | ~1.7 | 1.95 |

| 2031 | ~2.35 | ~1.4 | 2.70 |

In five years Kinross should be a bigger, longer-lived, lower-cost producer. Great Bear is a multi-decade Canadian asset that improves the jurisdiction mix, and Lobo-Marte replaces La Coipa. It is not a corpse. But it remains a price-taker on a commodity, with modest unit growth (about 4%/yr) and depleting assets. I put it in the roughly 5%-growth / cyclical category at 12x FCF (9x in the bear case, 14x in the bull case). Confidence in volume and cost is moderate. Confidence in the gold price, which drives value, is low.

Fair value and multiples

DCF at 10%: the PV of 2027-31 FCF is about $6.3B, plus the PV of 12 × $2.7B = $20.1B, plus $1.9B net cash, gives about $28.3B, or about $24.1/share. Bear case ($3,300 gold, a Great Bear overrun, 9x): about $10-11. Bull case ($5,000 gold, 14x): about $41-42. Each $100/oz is worth about ±$1.40/share. Base IRR from $21.60 is about 12%. At spot gold we are paying about 12x earnings (adjusted EPS run-rate about $1.80), about 5.6x EV/EBITDA (about $4.2B EBITDA, EV about $23.4B), an 8.7% real-FCF yield and roughly a 5% reported FCF yield. Fair value: about $23. The stock is fairly priced at spot gold, so the upside is mostly a call on gold, and it does not meet the 50%-in-a-year bar without a gold rebound. Implied volatility is 45-47%, the stock sits at the 1-year low and buybacks continue, so selling puts or covered calls is a sensible way to own it. Forward earnings move too much with gold to call this a classic covered-call floor.

Management, risks and competition

CEO Paul Rollinson (since 2012) has been disciplined lately: he refuses M&A at high prices, delevered after the Great Bear acquisition, prefers buybacks, and makes only base dividend raises meant to be permanent. Bernard Wessels became COO in July 2026. History to remember: large write-downs on the 2010 Red Back (Tasiast) acquisition, the 2022 forced exit from Russia, and a 2018 SEC internal-controls settlement related to Mauritania and Ghana. That is past, not current governance trouble. Risks: the gold price and real rates; Great Bear capex inflation and permitting (the IBA with Lac Seul and Wabauskang, the federal IA decision by spring 2027, the Grassy Narrows litigation); Mauritania and Brazil country/tax risk (a $103M withholding tax on Mauritanian repatriation in 2026); El Niño weather in Chile and Brazil; Nevada labour inflation; and two contractor fatalities at Bald Mountain in Q3. Competition: gold is a commodity, so the competitive question is cost and jurisdiction versus Agnico Eagle, Newmont, Barrick and others. Kinross sits mid-curve on AISC (about $1,875) with a jurisdiction discount that Great Bear should gradually narrow.

Sentiment: 4/10

The stock is down 43% from its high and back at the 1-year low. It was hit by a guidance cut and a falling gold price, and the macro narrative (Fed hikes back on the table) is turning against gold. Short interest is low (about 16M shares, roughly 2 days to cover), and put open interest ($8M) outweighs calls ($2M). The sell side is still positive but lagging. Consensus is Buy with average targets around $34-36 (range $18-50). After the September update, Scotiabank cut to C$39, CIBC to C$50 and TD to $35. Those targets were mostly set at much higher gold prices and will likely drift down.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue8355+30%7062+37%5149+21%4240+23%3455
Gross profit4515+53%3482+85%1878+62%1160+125%515
Operating expenses282-18%389+15%338-6%358-10%398
▸Adj EBITDA5306+42%4223+57%2688+50%1788+98%902
▸Adj OCF4631+58%3907+96%1993+32%1511+34%1128
CapEx-1502-1194-1076-1098-764
Adj FCF3129+72%2713+196%917+122%412+13%364
Interest expense43.681.950.569.072.2
▸Adj net income3039+72%2279+134%975+103%481-648
▸Owner's earnings3000--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA13860100%4039100%4414100%2679100%1764100%963100%
FCF (OCF−capex)662048%188047%257658%137151%50729%28630%
Net income538539%222755%239854%94935%41624%-605-63%
▸Capital returned361626%86421%153335%100938%61835%-407-42%
Buybacks15936926000.000.00301
Dividends744143152148147154
Interest paid29622.481.950.569.072.2
Debt paid down9836.30698811402-934
▸Reinvestment625845%112928%120227%105539%109362%1780185%
Capex (PP&E)52661134119410761098764
Intangibles & M&A10120.000.00-15.40.001028
Leases signed (net Δ)-20.1-5.317.87-5.02-5.68-12.0
Retained / other207615%101725%106024%39215%-71.7-4%-286-30%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 47 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)1390312389108591048910392
▸Liabilities (total)38343710386343354512
Net debt (incl. leases)-1896-97583018882211
Net debt / Adj EBITDA-0.36-0.230.311.062.45
Net debt / Adj FCF-0.61-0.360.914.586.07
Adj EBITDA / interest12251.653.225.912.5
Shares outstanding11781200122912291229
Dilution (YoY)-2.4%-2.4%-0.5%-1.8%+0.3%
Employees84470.000.000.000.00
MarginsTTM2025202420232022
Gross margin54.0%+8.149.3%+12.836.5%+9.127.4%+12.414.9%
Adj EBITDA margin63.5%+5.359.8%+7.652.2%+10.042.2%+16.126.1%
Adj OCF margin55.4%+9.955.3%+16.638.7%+3.135.6%+3.032.7%
Adj FCF margin37.5%+9.238.4%+20.617.8%+8.19.7%-0.810.5%
Net income margin37.7%+10.434.0%+15.518.4%+8.69.8%+27.3-17.5%
Adj NI margin36.4%+8.932.3%+13.318.9%+7.611.3%+30.1-18.8%
ROIC (adj, after-tax)28.7%25.4%12.3%6.3%1.1%
Cost of debt5.8%7.3%2.7%2.8%2.7%

Earnings Calls

12 calls

Earnings Call · 2026 Q3

2026-10-29

Kinross Gold's third quarter 2026 results call opened with CEO Paul Rollinson, who was joined by David Shaver (Executive Vice President), Andrea Freeborough (CFO), Bernard Wessels (operations), William Dunford (growth and exploration) and Geoffrey Gold (permitting and Indigenous relations). The call began with condolences for two employees of business partners killed at the Bald Mountain operation in Nevada, followed by company-wide safety stand-downs and a reinforced focus on fatality prevention. Financial and operating results: Q3 production was 425 thousand ounces and sales were 410 thousand ounces, the gap reflecting timing. Cost of sales was $1.49 thousand per ounce and all-in sustaining cost (AISC) was $1.95 thousand per ounce, with Q3 margins of roughly $2.75 thousand per ounce. Nine-month cost of sales was $1.4 thousand per ounce and AISC was $1.83 thousand per ounce. Adjusted earnings were $0.50 per share. Adjusted operating cash flow was $831 million in the quarter and over $3 billion year to date. Attributable adjusted free cash flow was $391 million in Q3 before working capital outflows, which reflected a temporary build in short-term stockpiles at Manh Choh, lower payables and higher prepaids. Free cash flow was also affected by unsold ounces at quarter end, which were sold in early October. Management said these items are timing related and expected to reverse in Q4. Tasiast and Paracatu were the main contributors, together accounting for more than half of production. La Coipa and Round Mountain, the two smaller assets that weighed on near-term production, delivered in line with updated expectations. Balance sheet and capital returns: Kinross ended the quarter with $2.6 billion in cash and $1.9 billion in net cash. S&P upgraded the company to BBB flat with a stable outlook, consistent with its Moody's and Fitch ratings. In September the company raised its shareholder return commitment from 40% to 50% of full-year free cash flow through dividends and buybacks. In Q3 it repurchased 8.6 million shares for $230 million and paid a quarterly dividend of about $50 million. Nine-month returns equaled about 46% of attributable free cash flow, up from 37% in the first half. Subsequent to quarter end, another $100 million of shares was repurchased, and management expects to reach the 50% commitment by year end. Since buybacks resumed in April 2025, over $1.4 billion has been repurchased, about 5% of shares outstanding. Guidance: The company remains on track for 2026 production of 1.84 to 1.86 million ounces, cost of sales of $1.42 to $1.46 thousand per ounce, AISC of $1.85 to $1.90 thousand per ounce, and capital of about $1.5 billion plus or minus 5%. For 2027, production guidance is also 1.84 to 1.86 million ounces. The 2027 capital range of about $1.5 billion remains subject to inflation and approval of incremental projects, including the Fort Knox Phase 11 layback. Detailed 2027 guidance will be provided with year-end results. Management expects 2028 production to rise on the back of grade enhancement from Phase X, Curlew and Tasiast. Operations: At La Coipa, production was 29 thousand ounces at $2.19 thousand per ounce, hurt by unprecedented winter weather, restricted ore access and higher-than-expected copper grades in sulfide ore. Stockpiles are being rebuilt and mill optimization is under way. Fort Knox produced 72 thousand ounces at $1.94 thousand per ounce. Bald Mountain produced 29 thousand ounces, and first production from Redbird 1 came in early October. Round Mountain produced 27 thousand ounces at $2.56 thousand per ounce, with recovery improving to 60% from 44% in the prior quarter against a target near 80%. Management is monitoring El Nino impacts on Chile and Paracatu and has launched a critical success factors initiative to sharpen operational priorities. Growth projects: Curlew is on track for first production in 2028, with mill refurbishment and tailings dewatering construction progressing. Redbird 2 satellite pits received permits and mining starts in 2027. Phase X at Round Mountain is about 8% ahead of schedule on underground development, with first production targeted for 2028 and encouraging infill and extensional drilling results. At Great Bear, the advanced exploration program has over 500 metres of combined decline development. The main project is targeted for first production in late 2029, detailed engineering is over 55% complete, and capital is expected to exceed the prior PEA due to inflation, scope changes and labor market conditions. A federal impact statement decision is needed by late spring 2027 to enable construction in summer 2027. The Integrated Project Process in Ontario is proceeding, and an impact benefits agreement with Lac Seul and Wabauskang First Nations is being finalized. Grassy Narrows First Nation has appealed the AEX permits, which management says do not affect main project permitting. In Chile, Lobo Marte's environmental impact assessment was accepted for review in Q2 2026, with first production targeted for the early 2030s. The company reported over 27 million ounces of measured and indicated resources and 17 million ounces of inferred resources. Analyst Q&A covered capital phasing, working capital reversal, Round Mountain performance, Great Bear permitting and capital risk, 2027 cost inflation (around 5%, with labor inflation of 5% to 6%, and about 50% of 2027 diesel hedged in the low-to-mid $60s per barrel), reserve pricing moving toward a three-year trailing average without changes to cutoff grades, M&A discipline, and the dividend versus buyback mix. Management reiterated that the shares offer an exceptional investment opportunity given cash flow strength and valuation.

Analyst Q&A (16)
▸
Will 2026 capex be at the upper end of guidance given the pace so far, and how should the quarterly cadence and 2027 capex be thought of, including whether the run rate could be higher?
Matthew Murphy · BMO Capital Markets
Q4 capex is expected to rise on both sustaining and growth spending. Sustaining capex in H2 should roughly equal H1. Growth spending is ramping with the growth projects, which should place full-year capex in the midpoint to upper end of guidance but still within range. The 2027 range of about $1.5 billion is subject to inflation and project approvals, such as Fort Knox Phase 11, with the budget process still underway.
▸
Does the Q3 working capital drag reverse in Q4?
Matthew Murphy · BMO Capital Markets
Management called it temporary. Some of the short-term stockpile build at Manh Choh will reverse in Q4, although stockpiles may persist because mining ends before processing. Payables and prepaids should also reverse in Q4. Finished goods built at quarter end were sold in early October.
▸
Round Mountain performance looked much better than Q2, with higher grade, 60% recovery and a five-quarter high throughput. What were the original mine plan operating metrics?
Fahad Tariq · Jefferies
Improvements are coming from Phase X grades and recovery initiatives, with quarter-on-quarter gains. Recovery still needs to reach about 80%, which management expects in the second half of the year and is well on track to achieve.
▸
Are there risks from First Nations pushback or permitting at Great Bear's AEX, and could they affect the main project?
Fahad Tariq · Jefferies
AEX and the main project have separate permitting processes, and AEX is not under the provincial 1P1P process. Grassy Narrows First Nation has appealed AEX permits, with a leave-to-appeal decision expected late next year or in H1. Main project permitting remains on schedule, and the main project will be assessed on its own merits. Support from the Lac Seul and Wabauskang traditional territory rights holders is strong, and the IBA is expected to be signed before the final impact assessment decision.
▸
Should unit costs rise by about $50 to $100 per ounce into 2027 given flat production and cost pressures from energy and other inputs?
Daniel Major · UBS
Costs are typically guided one year out. Production is similar in 2027 to 2026, with more U.S. production offset by other items. Inflation is expected to be similar to 2026, around 5%, with diesel, oil and crack spreads being monitored. Paul added that grade enhancement from Phase X, Curlew and Tasiast should provide an organic offset from 2028 onward.
▸
At what level is the diesel exposure hedged relative to current diesel costs?
Daniel Major · UBS
About 50% of 2027 diesel oil cost exposure is hedged, at roughly $60 to $65 per barrel.
▸
What is the expected Great Bear capex run rate into 2027 assuming FID on schedule, and will Lobo Marte incur pre-approval spending in 2027?
Daniel Major · UBS
2027 will be a meaningful spend year at Great Bear once federal permits are received, with significant construction ramping. The PEA figure of about $500 million remains the timeline reference but will be higher once inflation is included. Lobo Marte will mainly see early spend in 2027, with full construction starting later in 2028 into 2029.
▸
What is the M&A landscape, and are there attractive assets as sector valuations decline?
Daniel Major · UBS
Management monitors opportunities but feels no pressure given strong organic optionality, over 40 million ounces of resources, a strong balance sheet and cash flow. Brownfield projects have been moved from resources toward reserves. The company will look at processes or opportunities that create value but remains disciplined.
▸
How long will La Coipa mine plan involve high-copper ore, and how much of the mine plan contains it?
Carey MacRury · Canaccord Genuity
The highest-copper sulfides are at the bottom of Phase 7, planned to be finished in 2027 under the current permit. Additional resources are high-copper sulfides below the pit that would be processed in the 2030s, potentially with a flotation circuit. The current pit plan ends in 2027, so the impact has been limited.
▸
Does 2028 guidance still show about 2 million ounces, with little impact from Round Mountain or La Coipa?
Carey MacRury · Canaccord Genuity
There is no impact from Phase 7 or sulfides in 2028, as that mining will be complete by next year.
▸
When do you expect to begin drilling from underground at Great Bear?
Carey MacRury · Canaccord Genuity
Early next year, if the schedule holds, with early opportunities to drill off the top end of the ore body.
▸
What are labor inflation and turnover trends, and what is consumables inflation?
Tanya Jakusconek · Scotiabank
Average labor inflation is around 5% to 6%, with higher pressure in the U.S. and Nevada, where turnover is also higher. Competition for people and spares is strong. Labor agreements are signed for non-U.S. assets. Consumables show some ebb and flow but nothing dramatic at present, and energy is managed through a successful hedging strategy.
▸
Should Great Bear capex be expected to rise 20 to 30% versus the 2024 estimate of $1.4 billion?
Tanya Jakusconek · Scotiabank
Inflation is the largest component of any increase, followed by discretionary scope changes and labor market effects such as housing strategy. Payback is very short, so the project is not highly capital sensitive. Management said it is not expected to double capex, but a firm number will only be available in H1 2027 after detailed engineering, which is only about 5% complete on procurement.
▸
How are reserve and resource pricing and cutoff grades being approached as year-end mine plans are updated?
Tanya Jakusconek · Scotiabank
Reserve pricing is being moved up gradually toward a three-year trailing average, which is still well below spot prices, in a ratio consistent with gold price movement. There is no intention to lower cutoff grades, because mills are full and sufficient grade exists. Only long-term stockpiles may be considered near end of mine life.
▸
Why is the Chilean peso cost sensitivity now about $16 million for a 10% FX move, given lower Chilean production?
Lawson Winder · Bank of America
The change reflects the denominator effect, as the cost mix is similar.
▸
Will dividend increases continue, or will buybacks be the preferred capital return method after recent dividend increases?
Lawson Winder · Bank of America
The philosophy has not changed. The dividend is viewed as a long-term commitment and has been raised twice, by over 30% since last year. Buybacks are used to lean in and out flexibly, and management expects that approach to continue.

Options

Chain Snapshot (daily)

Call IV (ATM)81%
Put IV (ATM)28%
ATM Spread2.1%
Call $OI (near money)$4.5M
Put $OI (near money)$7.2M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$20.0
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$16.00$5.05/$5.800$0.01/$0.1454
$17.00$4.05/$4.855$0.09/$0.3146
$18.00$3.60/$4.0039$0.19/$0.30797
$19.00$2.69/$3.1515$0.37/$0.50406
$20.00$2.04/$2.461,841$0.70/$0.80782
$21.00$1.49/$1.7211$1.09/$1.26644
$22.00$1.14/$1.401,210$1.54/$1.81670
$23.00$0.79/$0.991,554$2.18/$2.52856
Snapshot: 2026-11-04

Short Interest

Short % of Float1.7%
Short Shares20.3M
Days to Cover2.7
Change (vs Prior)+18.2%
Short % Float History
1.70%-0.60pp
1.4%1.6%1.8%2.0%2.2%10-1512-3103-1305-2908-1410-30

Web Traffic

kinross.com
Web rank#955,823
Est. visits/mo591K
Web Rank History
#955,823+28,067
rankest. visits/mo
700k800k900k1.0m568K603K639K674K709K05-1207-2109-0109-2911-2402-0202-16

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
VAN ECK ASSOCIATES CORP$1.30B$7.21−$1.19B−$1.07B—$164.08B
Boston Partners$900M$9.03+$28.1M−$209M—$112.57B
VANGUARD CAPITAL MANAGEMENT LLCPassive$790M$30.52+$363K+$790M—$4.68T
ROYAL BANK OF CANADA$779M$10.41+$21.0M+$52.9M—$589.47B
ARROWSTREET CAPITAL, LIMITED PARTNERSHIP$698M$8.50−$243M+$698M—$225.34B
RENAISSANCE TECHNOLOGIES LLC$585M$7.50−$18.9M−$206M—$72.56B
FIL Ltd$491M$18.10−$162M+$210M—$139.12B
MACKENZIE FINANCIAL CORP$436M$15.55−$56.4M+$32.8M—$99.88B
GEODE CAPITAL MANAGEMENT, LLCPassive$370M$15.86+$40.0M+$105M—$1.87T
BANK OF MONTREAL /CAN/$342M$12.33+$40.9M+$120M—$268.37B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

080.4M160.7M241.1M321.4M$3.37$10$17$24$312021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
VAN ECK ASSOCIATES CORP54.9MBoston Partners36.0MROYAL BANK OF CANADA33.0MFIL Ltd20.7MRENAISSANCE TECHNOLOGIES LLC24.7MARROWSTREET CAPITAL, LIMITED PARTNERSHIP29.5MNORGES BANK13.3MMACKENZIE FINANCIAL CORP13.0MRuffer LLP874KFMR LLC7.1M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
BTEBaytex Energy Corp.3199.81×
CLXThe Clorox Company3139.86×
OROR Royalties Inc.3116.55×
PAASPan American Silver Corp.373.61×
WPMWheaton Precious Metals Corp.454.85×
BBarrick Mining Corporation341.14×
FNVFranco-Nevada Corporation339.96×
CNQCanadian Natural Resources Limited438.06×
AEMAgnico Eagle Mines Limited431.08×
TDThe Toronto-Dominion Bank325.90×
ENBEnbridge Inc.323.71×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (4 analysts)$37.75+106.6%
Last Year (16 analysts)$38.75+112.1%
Current Price$18.27
Analyst Ratings
17
9
3
Buy: 17Hold: 9Sell: 3Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2001 Q346M16M-5M$-0.05$-0.06 – $-0.0418
2001 Q477M5M-17M$-0.06$-0.07 – $-0.058
2002 Q110M-9M-30M$-0.17$-0.21 – $-0.1411
2002 Q24M-39M-59M$-0.14$-0.17 – $-0.1217
2002 Q3392M-15M-35M$-0.13$-0.15 – $-0.1015
2003 Q1474M-32M-60M$0.08$0.06 – $0.108
2003 Q2568M5M-36M$0.04$0.03 – $0.0419
2003 Q3154M-1M-41M$0.05$0.04 – $0.0611
2004 Q1155M49M8M$0.04$0.03 – $0.0518
2004 Q2158M58M12M$0.03$0.02 – $0.0411
2004 Q3218M55M7M$0.05$0.04 – $0.0616
2004 Q4209M-41M-102M$0.07$0.06 – $0.0820
2005 Q41.9B-1.5B-1.5B$0.49$0.39 – $0.598
2006 Q1290M46M13M$0.12$0.09 – $0.1412
2006 Q2187M81M43M$0.07$0.05 – $0.0816
2006 Q3183M77M41M$0.09$0.07 – $0.1116
2006 Q4210M75M37M$0.10$0.08 – $0.1210
2007 Q1270M125M75M$0.12$0.10 – $0.1413
2007 Q2258M95M47M$0.07$0.06 – $0.0819
2007 Q3315M90M45M$0.09$0.07 – $0.1114
2007 Q4344M297M212M$0.11$0.09 – $0.1311
2008 Q1429M154M88M$0.16$0.13 – $0.1915
2008 Q2299M80M26M$0.09$0.07 – $0.1120
2008 Q3465M176M59M$0.11$0.09 – $0.1315
2008 Q4646M-1.1B-1.2B$0.15$0.12 – $0.188
2009 Q1693M247M94M$0.16$0.13 – $0.1912
2009 Q2648M159M21M$0.14$0.11 – $0.177
2009 Q3801M96M-27M$0.14$0.11 – $0.1718
2009 Q4533M314M162M$0.11$0.09 – $0.1310
2010 Q1658M387M181M$0.14$0.11 – $0.1712
2010 Q2697M260M110M$0.16$0.13 – $0.1918
2010 Q3736M825M541M$0.16$0.13 – $0.199
2010 Q41.0B83M-83M$0.17$0.14 – $0.2010
2011 Q1803M441M214M$0.12$0.10 – $0.149
2011 Q2819M418M204M$0.14$0.11 – $0.179
2011 Q3954M407M193M$0.20$0.16 – $0.2412
2011 Q41.1B-3.1B-3.3B$0.25$0.20 – $0.3014
2012 Q11.1B295M116M$0.22$0.18 – $0.2619
2012 Q21.2B395M181M$0.20$0.16 – $0.2416
2012 Q3958M430M189M$0.16$0.13 – $0.1916
2012 Q41.0B-2.4B-2.6B$0.18$0.14 – $0.2211
2013 Q1917M404M136M$0.11$0.09 – $0.1310
2013 Q2678M-1.8B-2.0B$0.04$0.04 – $0.0510
2013 Q3701M228M31M$0.03$0.02 – $0.047
2013 Q42.1B-1.6B-1.8B$0.07$0.06 – $0.0919
2014 Q1817M247M30M$0.03$0.02 – $0.0410
2014 Q21.5B298M56M$0.06$0.05 – $0.0815
2014 Q3473M241M-6M$0.03$0.03 – $0.0413
2014 Q42.1B-3.1B-3.3B$0.03$0.02 – $0.0311
2015 Q2755M150M-83M$-0.01$-0.01 – $-0.0115
2015 Q31.2B185M-70M$-0.04$-0.05 – $-0.038
2015 Q4589M-419M-674M$-0.04$-0.05 – $-0.0316
2016 Q2876M167M-68M$0.03$0.02 – $0.0313
2016 Q3455M240M3M$0.06$0.04 – $0.077
2016 Q4226M-362M-629M$0.05$0.04 – $0.0613
2017 Q2434M278M36M$0.02$0.02 – $0.0314
2017 Q3237M343M81M$0.03$0.02 – $0.0319
2017 Q42.4B624M326M$0.05$0.04 – $0.0511
2018 Q1449M361M117M$0.06$0.04 – $0.0720
2018 Q2775M211M2M$0.03$0.02 – $0.048
2019 Q1808M294M87M$0.02$0.01 – $0.024
2019 Q2824M298M79M$0.03$0.03 – $0.045
2019 Q3914M270M61M$0.08$0.08 – $0.094
2019 Q4967M695M365M$0.11$0.10 – $0.116
2020 Q1855M335M92M$0.08$0.07 – $0.083
2020 Q21.0B473M182M$0.13$0.12 – $0.144
2020 Q31.1B479M195M$0.21$0.19 – $0.223
2020 Q41.1B1.0B605M$0.22$0.20 – $0.235
2021 Q11.1B394M150M$0.15$0.14 – $0.163
2021 Q21.0B357M119M$0.13$0.12 – $0.143
2021 Q3876M159M-30M$0.05$0.05 – $0.066
2021 Q4927M210M-2M$0.06$0.06 – $0.073
2022 Q11.0B-411M-599M$0.07$0.07 – $0.084
2022 Q21.0B139M-59M$0.08$0.08 – $0.095
2022 Q3983M169M-33M$0.06$0.05 – $0.068
2022 Q41.0B267M-2M$0.07$0.07 – $0.084
2023 Q1935M-428M-658M$0.04$0.04 – $0.043
2023 Q21.0B189M-65M$0.09$0.08 – $0.095
2023 Q31.1B248M-36M$0.10$0.08 – $0.119
2023 Q41.1B286M-2M$0.10$0.08 – $0.149
2024 Q11.0B-442M-724M$0.06$0.05 – $0.0910
2024 Q21.2B515M164M$0.14$0.10 – $0.1610
2024 Q31.3B597M227M$0.19$0.17 – $0.213
2024 Q41.4B661M286M$0.24$0.16 – $0.328
2025 Q11.4B652M269M$0.23$0.20 – $0.267
2025 Q21.5B793M402M$0.34$0.31 – $0.3712
2025 Q31.7B899M470M$0.40$0.37 – $0.429
2025 Q42.1B1.1B665M$0.56$0.49 – $0.669
2026 Q12.4B1.4B846M$0.71$0.48 – $0.8010
2026 Q22.2B1.3B779M$0.66$0.59 – $0.7210
2026 Q31.9B927M548M$0.46$0.38 – $0.5710
2026 Q41.9B987M587M$0.49$0.41 – $0.667
2027 Q12.3B1.3B788M$0.66$0.56 – $0.764
2027 Q22.3B1.3B801M$0.68$0.65 – $0.691
2027 Q32.4B1.4B844M$0.71$0.69 – $0.721
2027 Q42.2B1.4B849M$0.72$0.69 – $0.731
2028 Q12.4B1.5B920M$0.78$0.75 – $0.792
2028 Q22.3B1.5B909M$0.77$0.74 – $0.782
2028 Q32.3B1.5B919M$0.77$0.75 – $0.792
2028 Q42.3B1.5B929M$0.78$0.76 – $0.802
v2 analysis (legacy, 2026-07-30) — for comparison onlyclick to expand

Thesis

Kinross has moved from a leveraged, low-margin producer in 2022 to a substantial net-cash company generating very strong free cash flow. The improvement is visible in the balance sheet as well as the income statement: net debt fell from $2.2B in 2022 to approximately $1.9B of net cash, while the company has funded high capital spending, repaid debt and returned capital through dividends and buybacks. Recent quarterly results confirm that Paracatu and Tasiast remain productive and that the company is broadly on track for its 2026 production and cost targets. The central investment question is not solvency but sustainability. Current cash generation benefits from elevated gold prices, while AISC has risen to approximately $1,730 per ounce and Tasiast is in a lower-grade phase. Round Mountain is temporarily burdened by stripping, and Great Bear and Lobo-Marte require substantial future capital before contributing production. Conversely, Kinross has a credible organic pipeline, disciplined M&A posture, improving per-share capital returns and meaningful net cash that can absorb project overruns or weaker metal prices. The likely trajectory is continued strong cash generation over the next two years, with modest production growth and a gradual increase in the value investors assign to the pipeline. The shares should remain highly sensitive to gold prices, but the balance sheet and diversified operating base make permanent impairment materially less likely than during the prior leverage cycle.

Trade Signal

Trade rating
-2.4/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-07-30 · saw $23.59-16.5% since

No trade: Kinross is an excellent, buyable gold producer with positive cash-flow support, but at $23.21 it trades above the analyst's approximately $19-$20 fair value and already reflects much of the operational improvement and elevated-gold upside.

Temporary mispricing+1.0

KGC rose sharply through 2025 and peaked around $38 in January 2026 as gold sentiment, earnings growth and the company's improved balance sheet drove a major rerating. It then declined approximately 39% from the high, with weakness continuing through March-May and again into June-July; the study provides no company-specific adverse event, so the recent legs appear primarily related to gold/commodity-sector retracement, profit-taking and multiple compression. The flat reaction to the strong July 30 earnings report suggests the market is no longer chasing incremental good news. The decline is partly a justified normalization from an exuberant peak rather than a clear panic overreaction, but the absence of a negative operational reset leaves a small temporary dislocation in favor of the stock.

Market view+2.0

The sell-side view is constructive to bullish: consensus is Buy, the average one-year target is $36.50, and only three of 29 listed analysts are sellers. However, the stock is not euphoric after falling 39% from its 52-week high and 22% over three months. The market appears to have reduced exposure after a major gold-driven rerating, while the latest strong earnings print produced no immediate price reaction. Short interest is low and declining, put open interest and volume exceed calls, and retail participation is moderate rather than dominant. The prevailing view is constructive but may still underestimate how dependent the valuation is on sustained gold prices.

Inflectionwindow ~3mo+1.0

The operational inflection has largely already occurred: Kinross has moved from a leveraged 2022 profile to a net-cash, high-FCF producer, and the market is aware of the strong earnings and buybacks. Near-term production is broadly stable rather than accelerating, while Tasiast remains in a lower-grade phase through 2028. Great Bear and the U.S. projects provide longer-term optionality, but their benefits are years away and appear substantially recognized in consensus targets. A meaningful upside inflection would require gold to remain at or above current elevated levels or project execution to exceed expectations.

Catalysts
  • ▲late 2026 · Q3 2026 earnings and production update — Tests whether approximately 2Moz annual production and roughly $1,730/oz AISC guidance remain credible; sustained FCF could support continued buybacks.
  • ▲Q3-Q4 2026 · 2026 capital-return update — Management is targeting shareholder returns of approximately 40% of attributable FCF; additional repurchases would support per-share value.
  • ▲H2 2026 · Great Bear permitting and engineering milestones — Further regulatory progress and confirmation of spring 2027 construction could reduce project risk and support the long-term pipeline valuation.
  • •ongoing over the next 12 months · Gold-price and real-rate developments — A continuation of elevated gold prices would expand margins, while a move toward $2,300-$2,400/oz would pressure cash flow and the valuation.
  • ▼early 2027 · 2027 mine-plan, cost and capital-spending reset — Tasiast remains in a lower-grade phase through 2028, while growth projects require capital; any AISC or capex escalation could challenge the premium valuation.
Flow+4.0

Flow is modestly positive. Kinross has repurchased more than $1.1B of stock, including 7.9M shares in Q2, and is targeting returns of approximately 40% of attributable FCF. TTM dilution is negative 2%, indicating net share-count reduction. The dividend is small, insider and institutional flow evidence is limited, and short interest is only 1.5% of float, so there is little squeeze fuel.

Floor / Ceiling+4.0

The strongest support is the approximately $1.9B of net cash, substantial ongoing free cash flow and an active buyback that has retired roughly 4% of shares since mid-2025. The floor is not hard because net cash and FCF are highly sensitive to gold prices, and sustaining/growth capex remains significant. There is no immediate hard ceiling, but gold-price normalization and cyclical-investor selling could cap upside near current levels.

Buyability

Highly buyable for gold and cash-flow-oriented investors: Kinross has strong recent execution, net cash, an active buyback and a 1% dividend. The next buyer is likely a gold investor seeking leveraged exposure to elevated bullion prices, though the cyclical commodity dependence limits broad-market appeal at this valuation.

Fear vs Greedfear 4/10 (-1.0)greed 7/10 (+1.0)

Slightly more fear than greed at $23.21: the company is executing well and generating unusually strong cash flow, but the current valuation embeds a high gold-price environment and recent margins are not fully normalized. I would rather own it below fair value than short a net-cash producer with active buybacks, but the risk/reward is not compelling enough for a clean long at this price.

Valuation

Our Target
$19.0B-12%
Market Should Pay
$18.1B-16%
target ×0.95 (fear discount)
Current Market Cap
$21.5BNeutral
What Changed
transcript · 2026-07-30
+3%fair value on this information

The Q2 release showed another strong quarter and more than $470M of cash accumulation after shareholder returns, taking cash to a record $2.7B and net cash to approximately $1.9B. It also confirmed that production, AISC, capital expenditure and shareholder-return guidance remain intact. The main incremental negatives were weaker sequential revenue and cash flow, continued Round Mountain stripping, and clarification that the Great Bear bulk sample is still likely late 2027 or 2028; none represented a material guidance break.

▸ How the cases moved

The bear case rises modestly from approximately $12,400M to $12,800M as the quarter confirmed operating continuity and further balance-sheet strengthening; its probability falls from 0.22 to 0.20. The base case rises from approximately $22,900M to $23,500M as full-year guidance was maintained and first-half cash generation remained strong; its probability increases from 0.53 to 0.55. The bull case rises from approximately $35,500M to $36,600M because the pipeline and cash accumulation remain intact, with probability moving from 0.25 to 0.25.

2-Year Plausible Outcomes
bear20%
$12.8B
rev 0%/yrOE $1800M

Gold prices normalize materially, while higher royalties, inflation, lower grades at Tasiast and the Round Mountain stripping sequence pressure margins. Production remains roughly flat but owner earnings fall as sustaining and development capital remain elevated. Great Bear and Lobo-Marte progress, but investors assign limited value to projects still several years from production.

▸ Valuation

6x $1,800M owner earnings = $10,800M EV + $2,000M net cash = $12,800M equity value

base55%
$23.5B
rev +5%/yrOE $3000M

Kinross delivers approximately 2.0 million ounces annually, with gold prices remaining supportive but below the exceptional recent contribution. AISC stays near guidance, productivity offsets much of inflation, and free cash flow remains strong. Cash accumulation, buybacks and disciplined organic projects support a solid producer multiple, while Great Bear receives substantial but not full credit ahead of 2029 production.

▸ Valuation

7x $3,000M owner earnings = $21,000M EV + $2,500M net cash = $23,500M equity value

bull25%
$36.6B
rev +10%/yrOE $4200M

Gold remains near elevated levels or rises further, production meets or exceeds guidance, and productivity plus favorable grades keep margins near current highs. Kinross converts exceptional free cash flow into additional buybacks while maintaining investment in Great Bear, Phase X, Redbird and Curlew. Permitting and engineering progress reduce the discount on the growth pipeline and the company earns a premium senior-producer multiple.

▸ Valuation

8x $4,200M owner earnings = $33,600M EV + $3,000M net cash = $36,600M equity value

▸ Target Rationale

The probability-weighted discounted value is $19,708M, but I set the analytical target at $19,000M. The modest discount reflects gold-price cyclicality, rising AISC, the need to execute several large projects, and the fact that a meaningful portion of current cash generation is likely above mid-cycle sustainable earnings. Net cash, declining share count and disciplined capital allocation prevent a larger discount.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now8/10
Trajectory7/10
Risk4/10
Governance7/10
Insolvency prob (2yr)1%
Outcome uncertainty6/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial and Operating Results: On April 29, 2026, Kinross reported a robust first quarter, driven by strong gold price realizations. The company produced 492,563 gold equivalent ounces (Au eq. oz.) at an attributable production cost of sales of $1,380/oz and an attributable All-in Sustaining Cost (AISC) of $1,732/oz sold. Adjusted net earnings reached $854.1 million ($0.71 per share), while attributable free cash flow hit a record $837.5 million, marking the company’s fourth consecutive quarter of record free cash flow generation.
  • Reiteration of 2026 Guidance: Kinross maintained its full-year 2026 outlook, projecting attributable production of 2.0 million Au eq. oz. (+/- 5%). Expected full-year attributable production cost of sales is $1,360/oz (+/- 5%), with AISC projected at $1,730/oz (+/- 5%) and total capital expenditures guided at $1,500 million.
  • Capital Returns to Shareholders: During Q1 2026, Kinross declared a quarterly dividend of $0.04 per common share. Through dividends and share repurchases, the company returned approximately $350 million to shareholders year-to-date.
  • Construction Greenlit for Three Major U.S. Growth Projects: On January 15, 2026, Kinross announced decisions to proceed with the construction of three organic, self-funded projects: Round Mountain Phase X and Bald Mountain Redbird 2 in Nevada, and Kettle River-Curlew in Washington. Budgeted at $425 million for 2026, these projects are modeled to add approximately 3 million ounces of life-of-mine production, extend U.S. operational lives into the 2030s, and improve overall long-term domestic unit-cost profiles.
▸ Thesis-test Findings
Great Bear Gold Project Permitting and EIA Updates (2026)

The Great Bear gold project in Red Lake, Ontario, has achieved significant regulatory acceleration, marking a strong bull case for pipeline execution. On February 17, 2026, the Ontario provincial government designated Great Bear under its new "One Project, One Process" framework to fast-track permitting, making it the province's first gold mining project accepted under this accelerated regime. On the federal level, the Environmental Impact Assessment (EIA) is progressing steadily through its standard phases. The Impact Assessment Agency of Canada (IAAC) successfully completed its third round of public and Indigenous consultations, with the comment period on the summary of the project's Impact Statement officially closing on May 29, 2026. These advancements indicate a highly predictable regulatory path toward targeted construction in the 2027–2029 timeframe.

Gold Mining AISC Peer Comparison (2026)

A comparative analysis of 2026 AISC profiles demonstrates a highly competitive cost landscape for Kinross despite overall inflationary pressures. For the full year 2026, Kinross is guiding for an attributable AISC of $1,730 per ounce (+/- 5%), which rose from $1,571 per ounce in 2025 due to royalties, fuel, and planned mine sequencing. This cost structure sits above Newmont Corporation, which guided a 2026 portfolio AISC of $1,680 per ounce, and Agnico Eagle, which sits at an industry-leading guidance of $1,400 to $1,550 per ounce. However, Kinross maintains a distinct cost advantage over Barrick Gold, which projected a significantly higher 2026 AISC guidance range of $1,760 to $1,950 per ounce. While the rising unit costs pose a moderate margin compression risk, this is heavily offset by a supportive gold pricing environment, keeping Kinross’s free cash flow profiles near historical highs.

Tasiast Mine Production Profile and Grade Reconciliation (2026)

The production profile at the Tasiast mine in Mauritania is currently in a planned transition phase, representing a temporary operational headwind. After peaking at 622,394 ounces in 2024, production declined to 503,429 ounces in 2025 as the operation moved into a lower-grade mining sequence. For 2026, Kinross expects production to stabilize around 505,000 ounces, which was supported by a stable Q1 2026 output of 130,014 ounces. While lower grades are temporarily increasing the mine's cost of sales to a guided $1,050/oz in 2026, the mill continues to operate efficiently at its expanded 24,000 tonnes-per-day capacity, and fuel costs are partially mitigated by the fully integrated 34 MW solar facility. Kinross expects to remain in lower-grade mining at Tasiast until 2028, when grades are projected to cycle back upward. Exploration drilling at West Branch and adjacent satellite pits also shows continuous high-grade mineralization at depth, pointing to potential underground extensions in the longer term.