PAAS
Pan American Silver Corp.v3 4.5/10 · 2026-11-03Pan American Silver Corp. is a mining enterprise dedicated to the full spectrum of metal operations, from discovery and site development to extraction, refinement, and environmental reclamation. The company focuses on precious and base metals including silver, gold, zinc, lead, and copper. Its extensive operations are situated across several countries, specifically Canada, Mexico, Peru, Argentina, and Bolivia, where it manages key mining properties such as La Colorada, Dolores, Huaron, Morococha, Shahuindo, La Arena, Timmins West, Bell Creek, Manantial Espejo, San Vicente, Joaquin, Cap-Oeste Sur Este, and Navidad. Founded in 1979 as Pan American Minerals Corp., the firm officially changed its name to Pan American Silver Corp. in April 1995 and is headquartered in Vancouver, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-11-03
Pan American Silver is a well-run, investment-grade, net-cash, diversified silver/gold producer (about 26 Moz silver plus about 720 koz gold a year across Mexico, Peru, Chile, Argentina, Brazil, Canada and Bolivia, now including 44% of the tier-one Juanicipio mine). It is a price-taker, though, and the stock has simply followed the metals down. Silver fell from about $116 in late January to about $49 at the end of October (-18% in October alone), gold from about $5,600 to about $3,890, and PAAS fell 44% from its February high of $68.5 to $38.29 (close 2026-11-03, the latest available; Q3 results come out after the close on Nov 4). At spot metals I estimate unlevered owner earnings of about $1.2B a year: attributable pre-tax cash flow of about $1.7B, less roughly $0.5B of normalized cash tax, with sustaining capex already deducted and about $250M a year of growth capex added back. Against a market cap of about $15.7B and an EV of about $14.8B (about $0.9B net cash), that is roughly 12x EV/owner earnings, a 7-8% owner-earnings yield, about 7.5x attributable EBITDA, and about 18-20x spot earnings. The sell-side's 9x forward P/E and $60-65 targets still assume $60-70 silver. A 10% DCF at flat $50 silver / $3,900 gold, with La Colorada Skarn capex weighing on 2028-2031 and a 12x multiple on normalized year-5 cash, gives about $34 a share including a small Escobal option. That makes the stock roughly fair to slightly expensive at spot: a 50% gain needs silver back near $60+ rather than any company-specific mispricing. The company is genuinely good: net cash, a 35-40% FCF return framework (about $1B targeted in 2026, 9.8M shares bought back YTD), long-life reserves of 511 Moz silver and 6.3 Moz gold, and trustworthy management. But it is not a blood-on-the-ground setup either. Silver is still about 75% above its 2024 average, analysts remain at Buy, short interest is tiny, and the drawdown is the unwind of a parabolic metal spike, not forced selling of a mispriced business. Rating 4.5/10 (fair-to-rich at spot, pure metal-price call); research 5/10 (the open question is the silver price deck, which more company work cannot resolve).
A deep dive would have to establish: Whether mid-cycle silver and gold prices settle nearer $55-60 and $4,200 (stock about 30-40% undervalued) or $40-45 and $3,500 (stock 20-30% overvalued), and whether 2027 guidance shows cost and Jacobina/El Penon issues contained.
Research (expand)
What the company does
Pan American Silver (NYSE/TSX: PAAS, reports in USD) is the second-largest primary silver producer and a mid-tier gold producer. It runs about a dozen underground and open-pit mines. Silver: La Colorada, Huaron, San Vicente, Cerro Moro, Juanicipio (44%, bought with MAG Silver in Sept 2025) and El Penon (Ag/Au). Gold: Jacobina (Brazil), Timmins (Canada), Shahuindo and La Arena (Peru), Minera Florida (Chile) and Dolores (Mexico, winding down). It also has a large undeveloped pipeline: the La Colorada Skarn (revised PEA March 2026, $1.9B initial capex, about 19 Moz/yr silver at peak), Escobal in Guatemala (a ~20 Moz/yr mine on care-and-maintenance since 2017 pending an ILO 169 consultation with no timeline) and Navidad in Argentina. 2026 guidance: 25-27 Moz attributable silver and 700-750 koz gold (now low end); AISC $15.75-18.25/oz silver and $1,700-1,850/oz gold (now high end); sustaining capex $340-360M; project capex $240-255M; cash taxes $585-635M (raised). Reserves at mid-2026 were 511 Moz silver and 6.3 Moz gold, about 20 years of silver and about 9 years of gold at current rates, priced at conservative $26-43 silver and $1,300-3,700 gold.
The investment case (and why it is mostly a metal call)
The bull case: a net-cash, investment-grade miner that is now buying back about 1.7% of the company a quarter, at a third off its peak, with Juanicipio making the silver segment one of the lowest-cost in the industry (Juanicipio AISC is negative after by-product credits). Skarn, Jacobina's optimization and the Timmins camp give it production growth into the 2030s, and Escobal is a free option. The bear case: everything that matters is the silver and gold price. Silver ran from about $29 at the start of 2025 to about $116 in January 2026 and is now about $49 after an 18% October drop (inflation at 3.7%, about 85% odds of a December Fed hike, margin-call liquidation). Gold went from about $5,600 to about $3,890. PAAS has tracked this almost one-for-one. Operating issues are second-order but real: Jacobina seismicity forced bigger pillars and lower grades, El Penon secondary structures underdelivered on gold, El Nino disrupted Chile and Argentina, costs are inflating (royalties, profit-sharing, stronger local currencies), and Q2 missed consensus EPS on a 37% tax rate.
What it earns today (real free cash flow)
- Q2 2026 (silver $71 realized, gold $4,402): attributable revenue $1,268M; attributable OCF $418M after $205M of tax and -$17M of working capital, so about $640M pre-tax and pre-working-capital; sustaining capex $74M; attributable FCF $344M. Net earnings $305M ($0.72/share).
- Re-pricing Q2 to spot ($49 silver, $3,890 gold) takes about $230M a quarter off revenue. Profit-linked royalties and worker participation give back maybe $20-25M of that. That leaves pre-tax cash after sustaining capex of about $380M a quarter in a soft gold quarter, or about $1.6-1.8B a year with H2-weighted gold.
- Cash tax at those prices normalizes to about $450-550M (2026's $585-635M includes true-ups from the record Q4 2025 plus withholding tax on repatriations).
- Unlevered owner earnings at spot: about $1.2B (90% range $0.85-1.55B). SBC is inside G&A, which runs about $100M a year. Sustaining capex ($350M) is the maintenance spend; the $250M of project capex is growth and is added back. Interest is negligible: about $25M of coupons on $714M of notes against interest income on $1.6B of cash.
- Attributable EBITDA at spot is about $1.9-2.0B, so roughly 60% of EBITDA reaches owners after sustaining capex and tax. That is a fair conversion for a miner, but remember that reserves deplete. Some of the 'D&A minus sustaining capex' gap is real economic depletion that exploration (about 500 km of drilling a year) and M&A must refill.
- For reference, 2025 attributable FCF was $1.2B at average prices of about $40 silver and $3,450 gold, with only four months of Juanicipio. Q4 2025 alone was $553M. Q1 2026 was $488M at near-peak prices.
Five-year projection (flat $50 silver / $3,900 gold, 3% cost inflation, FCF after all capex including growth)
Production stays roughly flat at 25-28 Moz silver and 700-750 koz gold until the Skarn starts (the 588 decline began in August 2026; the 12.4 km ramp takes about five years, so first Skarn ore comes around 2031-32). Juanicipio grades fade slowly toward base metals. Growth capex steps up as Skarn construction and the Jacobina plant and paste fill are approved; a Skarn partner could fund part of that.
- 2027: about $950M (owner earnings $1.2B less about $300M growth capex)
- 2028: about $800M
- 2029: about $700M (peak Skarn and Jacobina spend)
- 2030: about $750M
- 2031: about $950M
In five years this should be a larger, still-healthy, net-cash miner with about 30-35 Moz silver once the Skarn ramps, a re-plumbed Jacobina and a longer-life Timmins. It is not a corpse and not a compounder. It is a mature, roughly 0-5%-growth producer whose cash flow swings ±40% with metal prices. Category multiple: 10-14x normalized FCF. I use 12x on a normalized year-5 owner-earnings figure of about $1.25B, ignoring the growth-capex trough, which gives about $15.0B.
Fair value and the multiples we pay
- DCF at 10%: the PV of 2027-31 FCF is about $3.15B, plus the PV of the terminal value, about $9.3B, so EV is about $12.5B. Add about $0.9B of net cash: equity is about $13.4B, or about $32.5/share on about 411M shares. Add about $1.5/share for an Escobal option (net of the CVRs that convert into 15.6M shares on restart). DCF value: about $34/share.
- Sensitivity: at $60 silver / $4,300 gold, owner earnings are about $1.55B and the DCF is about $45. At $40 / $3,500 they are about $0.85B and the DCF is about $24. The stock at $38.29 is discounting roughly $53-55 silver and $4,000 gold held forever.
- At spot we pay: market cap about $15.7B; EV about $14.8B; EV/owner earnings about 12x; EV/EBITDA about 7.5x; P/E about 18-20x on spot earnings (EPS about $1.9-2.1; the 8.9x 'forward P/E' quoted by data vendors uses stale $60-70 silver estimates); owner-earnings yield about 7.5%; dividend 1.9% ($0.184 quarterly).
- Base-case IRR from $38.29 is about 5-6%. Fair value: about $36: the DCF plus a little for the balance sheet, the buyback and how hard the metals have already corrected, with no buyout premium, since the stock is itself a consolidator.
- Covered calls: IV is about 48%, but this is not a valuation floor and forward earnings are not predictable (they track the metal), so it is not a classic covered-call setup. Calls only make sense if you already own the stock as a silver position.
Price chart
The stock is $38.29, 15% of the way up its 1-year range ($33-68.5) and 47% of its 3-year range ($11.7-68.5). It has given back the whole Nov 2025-Feb 2026 blow-off but is still about 3x its early-2024 level. That is a commodity chart in mean reversion, not a quality company capitulating.
Management, capital allocation, risks and competition
- Management (CEO Michael Steinmann, a 20+ year PAAS veteran; CFO Ignacio Couturier; new COO Scott Campbell) is credible. It is conservative on the balance sheet (an undrawn $1.5B revolver, $3.2B of liquidity, cheap 2.63% 2031 notes, plans to retire the $279M 4.63% 2027 notes) and disciplined on the Skarn (phasing and capex cut by $1B, seeking a partner). The 35-40%-of-FCF return framework is real: $300M returned in Q2 and 9.8M shares repurchased YTD at about $49. The return amount shrinks with the metal price.
- The track record is mixed on M&A value: the 2019 Tahoe deal brought Escobal, still shut, and the 2023 Yamana assets came with some operating headaches. The MAG/Juanicipio deal, by contrast, looks excellent.
- Risks: silver and gold prices (dominant); jurisdictions (Argentina, Bolivia, Peru politics, Guatemala/Escobal, Mexican royalties and profit-sharing); operations (Jacobina seismicity, El Penon continuity, Timmins ground, El Nino); cost inflation and local-currency strength; reserve depletion; Skarn capex overruns; tax variability (31-37% effective plus withholding).
- Competition: it is a price-taker, so the moat is asset quality and cost position (Juanicipio plus La Colorada put it in the lower half of the silver cost curve). Peers: Fresnillo (Juanicipio partner), Hecla, Coeur, First Majestic, and the royalty/streamers Wheaton and Franco-Nevada.
- Governance: no serious issues. It is a Canadian, Vancouver-based, IFRS, investment-grade company. Escobal's past social-license conflict is an asset issue, not a governance one.
Sentiment: 4/10
Fear is building but this is not capitulation. Silver had its worst month of the year, miners fell about 20%, and PAAS is down 44% from its peak and near the bottom of its 1-year range. But the sell-side is still at Buy: 8-10 analysts with average targets of $60-70; CIBC was $88, and Jefferies cut to $54 Hold. Those targets have not yet been marked to $49 silver, so further estimate and target cuts are likely after Q3 (Nov 4), with Q4 the first quarter fully at the lower deck. Short interest is low (about 6.2M shares, about 1.5% of float, 1.9 days to cover), so there is no crowded short. Retail and macro commentary is split between 'forced selling and margin calls' and 'start of a bear market'. There is no PE overhang, index deletion or insider buying signal. The buyback is the one steady buyer.
- /Users/gregwo/stocks2/data/analysisv3/context/PAAS.md (price history, prior call summaries, Q2 2026 call transcript, options, short interest)
- https://www.sec.gov/Archives/edgar/data/0000771992/000077199226000063/paasq22026newsreleaseex995.htm
- https://www.sec.gov/Archives/edgar/data/0000771992/000077199226000063/paas06-30x2026mdaex992.htm
- https://www.sec.gov/Archives/edgar/data/0000771992/000077199226000065/nr2026reservesupdate.htm
- https://www.sec.gov/Archives/edgar/data/0000771992/000077199226000069/a2026q3releasedate.htm
- https://www.businesswire.com/news/home/20260217148323/en/pan-american-silver-reports-record-fourth-quarter-and-full-year-2025-financial-results-record-cash-flow-from-operations-of-554-million-in-the-fourth-quarter-dividend-increased-by-29/
- https://stockanalysis.com/stocks/paas/
- https://sharetrader.com.au/news/2026-11-01-silver-price-falls-18-percent-in-october-2026-as-spot-silver-drops-below-us50
- https://discoveryalert.com/analysis/gold-silver-selloff-margin-calls-bear-market-november-2026/
- https://goldsilver.com/industry-news/goldsilver-news/gold-silver-october-selloff-2026/
- https://www.marketbeat.com/stocks/NYSE/PAAS/price-target/
- https://mail.infomarine.net/en/insight/117-financial-news/59316-pan-american-silver-price-target-lowered-to-$54-from-$58-at-jefferies.html
- https://finance.yahoo.com/news/cibc-raises-price-target-pan-232427962.html
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 4453+37% | 3637+29% | 2819+22% | 2316+55% | 1495 |
| Gross profit | 1977+93% | 1402+156% | 549+123% | 246 | 3.27 |
| Operating expenses | 195+327% | 212 | 17.8-90% | 186-30% | 266 |
| ▸Adj EBITDA | 2283+49% | 1696+54% | 1102+111% | 523+874% | 53.7 |
| ▸Adj OCF | 1995+76% | 1449+84% | 789+116% | 365+492% | 61.6 |
| CapEx | -417 | -315 | -323 | -381 | -275 |
| Adj FCF | 1577+90% | 1134+144% | 466 | -15.7 | -213 |
| Interest expense | 78.8 | 58.0 | 53.0 | 57.7 | 7.53 |
| ▸Adj net income | 1210+92% | 924+485% | 158 | -48.0 | -309 |
| ▸Owner's earnings | 1250 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 5271100% | 1917100% | 1806100% | 1051100% | 477100% | 20.3100% |
| FCF (OCF−capex) | 236145% | 106055% | 107159% | 40138% | 71.215% | -243 |
| Net income | 178034% | 111058% | 98555% | 11211% | -87.2-18% | -340 |
| ▸Capital returned | 196337% | 78741% | 32218% | 27927% | 621130% | -45.6-225% |
| Buybacks | 531 | 465 | 43.2 | 23.1 | 0.00 | -0.94 |
| Dividends | 773 | 226 | 176 | 145 | 130 | 94.8 |
| Interest paid | 239 | 62.7 | 58.0 | 53.0 | 57.7 | 7.53 |
| Debt paid down | 420 | 33.0 | 44.8 | 57.0 | 433 | -147 |
| ▸Reinvestment | 124724% | 35919% | 74541% | 29.53% | -164-34% | 277 |
| Capex (PP&E) | 1616 | 321 | 315 | 323 | 381 | 275 |
| Intangibles & M&A | -462 | -1.94 | 440 | -290 | -610 | 0.00 |
| Leases signed (net Δ) | 93.4 | 39.2 | -9.65 | -3.40 | 64.8 | 2.54 |
| Retained / other | 110021% | 33818% | 36820% | 46644% | 11825% | -190-934% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 13 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 10176 | 9724 | 7203 | 7213 | 3249 |
| ▸Liabilities (total) | 2774 | 2736 | 2486 | 2441 | 1047 |
| Net debt (incl. leases) | -856 | -381 | -84.0 | 361 | 84.5 |
| Net debt / Adj EBITDA | -0.37 | -0.22 | -0.08 | 0.69 | 1.57 |
| Net debt / Adj FCF | -0.54 | -0.34 | -0.18 | -- | -- |
| Adj EBITDA / interest | 29.0 | 29.2 | 20.8 | 9.06 | 7.13 |
| Shares outstanding | 412 | 422 | 363 | 363 | 363 |
| Dilution (YoY) | +16.2% | +16.2% | +5.1% | +64.1% | +0.1% |
| Employees | 9000 | 2.00 | 2.00 | 2.00 | 2.00 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 44.4%+13.0 | 38.6%+19.1 | 19.5%+8.8 | 10.6%+10.4 | 0.2% |
| Adj EBITDA margin | 51.3%+4.4 | 46.6%+7.5 | 39.1%+16.5 | 22.6%+19.0 | 3.6% |
| Adj OCF margin | 44.8%+10.0 | 39.9%+11.9 | 28.0%+12.2 | 15.8%+11.6 | 4.1% |
| Adj FCF margin | 35.4%+10.0 | 31.2%+14.7 | 16.5%+17.2 | -0.7%+13.6 | -14.3% |
| Net income margin | 35.2%+15.7 | 27.1%+23.1 | 4.0%+7.7 | -3.8%+19.0 | -22.8% |
| Adj NI margin | 27.2%+7.8 | 25.4%+19.8 | 5.6%+7.7 | -2.1%+18.6 | -20.7% |
| ROIC (adj, after-tax) | 16.0% | 11.9% | 6.3% | 0.9% | -8.6% |
| Cost of debt | 9.1% | 6.8% | 6.6% | 5.9% | -- |
Earnings Calls
Earnings Call · 2026 Q2
Pan American Silver delivered a robust second quarter marked by strong silver production, substantial free cash flow and continued progress on its growth portfolio. Attributable silver production was 6.5 million ounces, at the high end of quarterly guidance and supported by La Colorada and Juanicipio. The company remains on track for full-year attributable silver production of 25 million–27 million ounces. Attributable gold production of approximately 166,000 ounces was below expectations, making Q2 the weakest gold quarter of the year, but management expects improvement in the second half, weighted toward Q4. Full-year production, all-in sustaining cost and sustaining-capital ranges were reaffirmed, with gold now expected at the low end of its 700,000–750,000-ounce range. Revenue was $1.1 billion, or $1.3 billion including Pan American’s 44% Juanicipio interest. Net earnings were $305 million, or $0.72 per share, while adjusted earnings were $0.73 per share. Attributable operating cash flow reached $418 million and attributable free cash flow was $344 million. The company returned a record $300 million to shareholders in Q2 through dividends and share repurchases, and has repurchased more than 7 million shares in 2026. Management confirmed that the enhanced framework targeting distribution of approximately 35%–40% of cash remains firmly in place and that the company is currently ahead of its planned pace. Jacobina was the primary operational issue. Ongoing seismic activity has caused no injuries, infrastructure damage or major mine disruption, but a risk reassessment prompted larger pillars, reduced production rates in certain high-grade areas and increased development into additional zones. These measures are expected to reduce 2026 production by approximately 10,000 ounces. Management characterized this as a timing issue rather than a permanent reserve loss, since paste backfill should eventually enable recovery of pillars. Longer-term optimization includes filtered tailings, paste backfill, potential alternative mining methods and either an expanded existing plant or a new processing facility. Jacobina retains a reserve life extending into the 2050s and meaningful expansion potential. El Peñón’s gold guidance was reduced by approximately 10,000 ounces because certain secondary structures showed weaker continuity and were temporarily removed from reserves pending further drilling. Replacement material is more silver-rich and lower in gold, allowing silver guidance to remain unchanged. The midyear reserve and resource update is expected in early September. Timmins is expected to improve in the second half through higher grades and throughput, while paste backfill is helping ground control at Bell Creek. The company raised 2026 income-tax-paid guidance to $585 million–$635 million, reflecting higher metal prices, prior-year tax true-ups and withholding taxes on repatriated cash. First-half project-capital spending was below plan because of strikes, weather and contractor mobilization delays, but no projects were postponed. Liquidity was approximately $3.2 billion after expanding the undrawn revolving facility to $1.5 billion plus a $750 million accordion. Growth priorities remain the La Colorada Skarn, Jacobina optimization and Timmins Camp. At La Colorada, the 588 decline has begun, while Escobal’s ILO 169 consultation continues without a restart timeline.
▸What do the Jacobina seismicity and mining changes mean for sustaining roughly 200,000 ounces of annual gold production in 2027 and beyond?Lawson Winder · Bank of America Merrill Lynch
▸Are potential El Niño-related disruptions through the rest of 2026 reflected in the revised gold production outlook?Lawson Winder · Bank of America Merrill Lynch
▸Does the plan to return up to $1 billion to shareholders in 2026 through buybacks and dividends remain in place?Lawson Winder · Bank of America Merrill Lynch
▸Was a recent seismic event responsible for reassessing Jacobina’s mining method, and can production still be expanded despite the move toward more selective mining?Wayne Lam · TD Securities
▸Can Jacobina sustain the potentially expanded mill capacity, or is that still being evaluated?Wayne Lam · TD Securities
▸How much of El Peñón’s production historically came from stockpiles, is the lower-continuity mineralization issue temporary, and how should it be reflected in future modeling and reserves?Wayne Lam · TD Securities
▸What supports the expected second-half production increase at Timmins, and how have the ground-condition issues from last year evolved?Wayne Lam · TD Securities
▸Is the approximately 37% Q2 tax rate a new normal, and could taxes exceed the revised guidance if gold and silver prices remain above the company’s assumptions?Cosmos Chiu · CIBC
▸Do the lower-continuity secondary structures at El Peñón affect gold grades or production disproportionately relative to silver?Cosmos Chiu · CIBC
▸Why was project capital spending below plan in the first half, and where will the company catch up during the second half?Cosmos Chiu · CIBC
▸What royalty burden should investors expect from La Colorada’s adjacent third-party ground in the second half of 2026 and in 2027?Carey MacRury · Canaccord Genuity
▸Why double the credit facility when the company has significant cash, strong cash generation and limited near-term capital spending?Carey MacRury · Canaccord Genuity
▸What additional information can be provided about the government officials’ visit to Escobal, including whether it was their first visit and its purpose?Don DeMarco · National Bank Financial
▸Will Jacobina’s seismic mitigation require additional capital beyond sustaining-capital budgets, or is the impact limited to the production reduction?Don DeMarco · National Bank Financial
▸Why reaffirm silver cost guidance despite first-half costs below the low end, and what could drive costs toward the midpoint in the second half?Don DeMarco · National Bank Financial
▸Does stronger government support for mining in Guatemala improve the Escobal outlook, and what key issues are currently being discussed between the government and Xinka representatives?Lawson Winder · Bank of America Merrill Lynch
▸Can the timing of the mineral reserve, resource and exploration update be narrowed to late August or mid-September?Lawson Winder · Bank of America Merrill Lynch
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $35.00 | $6.50/$7.40 | 108 | $0.50/$0.75 | 145 |
| $36.00 | $5.70/$6.50 | 0 | $0.70/$0.85 | 40 |
| $37.00 | $5.00/$5.70 | 0 | $0.80/$1.35 | 56 |
| $38.00 | $4.60/$5.00 | 93 | $1.20/$1.45 | 120 |
| $39.00 | $3.90/$4.40 | 13 | $1.55/$1.75 | 26 |
| $40.00 | $3.40/$3.70 | 160 | $1.95/$2.20 | 97 |
| $41.00 | $2.95/$3.30 | 13 | $2.40/$2.85 | 50 |
| $42.00 | $2.30/$2.85 | 40 | $2.90/$3.50 | 27 |
Short Interest
Web Traffic
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| VAN ECK ASSOCIATES CORP | $854M | $23.60 | −$110M | −$478M | — | $164.08B |
| MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd. | $698M | $28.12 | +$10.3M | +$231M | — | $83.85B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $517M | $54.56 | +$3.8M | +$517M | — | $4.68T |
| BlackRock, Inc.Passive | $376M | $30.97 | −$17.6M | +$149M | — | $6.70T |
| Capital International Investors | $279M | $51.81 | +$24.1M | +$279M | — | $481.62B |
| NORGES BANK | $250M | $20.86 | −$12.4M | +$5.1M | — | $1.00T |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $230M | $33.98 | +$23.5M | +$103M | — | $1.87T |
| MORGAN STANLEY | $215M | $28.48 | +$76.7M | +$95.5M | — | $1.88T |
| BANK OF MONTREAL /CAN/ | $188M | $35.88 | +$67.8M | +$120M | — | $268.37B |
| MILLENNIUM MANAGEMENT LLC | $171M | $31.70 | +$9.7M | +$47.4M | — | $142.62B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
| Ticker | Name | Co-holders | Score |
|---|---|---|---|
| HL | Hecla Mining Company | 4 | 196.30× |
| OR | OR Royalties Inc. | 5 | 143.14× |
| CDE | Coeur Mining, Inc. | 4 | 124.92× |
| EQX | Equinox Gold Corp. | 4 | 114.51× |
| RGLD | Royal Gold, Inc. | 5 | 101.04× |
| KGC | Kinross Gold Corporation | 3 | 73.61× |
| FNV | Franco-Nevada Corporation | 5 | 49.08× |
| WPM | Wheaton Precious Metals Corp. | 4 | 40.41× |
| AEM | Agnico Eagle Mines Limited | 7 | 40.08× |
| PBR | Petróleo Brasileiro S.A. - Petrobras | 3 | 38.17× |
| B | Barrick Mining Corporation | 3 | 30.31× |
| NEM | Newmont Corporation | 4 | 28.04× |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2003 Q3 | 12M | 0M | -0M | $-0.01 | $-0.01 – $-0.01 | 9 |
| 2003 Q4 | 69M | -24M | -26M | $0.05 | $0.04 – $0.06 | 18 |
| 2004 Q1 | 41M | 1M | -1M | $-0.11 | $-0.13 – $-0.09 | 16 |
| 2004 Q3 | 23M | 7M | 3M | $0.02 | $0.02 – $0.03 | 13 |
| 2004 Q4 | 1.9B | 53M | 34M | $0.11 | $0.09 – $0.13 | 8 |
| 2005 Q1 | 22M | -5M | -9M | $0.09 | $0.07 – $0.11 | 14 |
| 2005 Q2 | 43M | 2M | 0M | $0.04 | $0.03 – $0.05 | 14 |
| 2005 Q4 | 56M | -34M | -38M | $0.08 | $0.06 – $0.10 | 14 |
| 2006 Q1 | 62M | -0M | -4M | $0.16 | $0.13 – $0.19 | 11 |
| 2006 Q2 | 48M | 15M | 8M | $0.07 | $0.05 – $0.08 | 14 |
| 2006 Q3 | 77M | 33M | 20M | $0.30 | $0.24 – $0.36 | 20 |
| 2006 Q4 | 72M | 42M | 25M | $0.22 | $0.18 – $0.26 | 12 |
| 2007 Q1 | 111M | 46M | 29M | $0.42 | $0.34 – $0.51 | 12 |
| 2007 Q2 | 107M | 41M | 23M | $0.39 | $0.31 – $0.47 | 7 |
| 2007 Q3 | 94M | 47M | 26M | $0.31 | $0.25 – $0.37 | 19 |
| 2007 Q4 | 98M | 51M | 29M | $0.37 | $0.30 – $0.44 | 12 |
| 2008 Q1 | 112M | 55M | 31M | $0.40 | $0.32 – $0.48 | 12 |
| 2008 Q2 | 104M | 44M | 21M | $0.31 | $0.25 – $0.37 | 10 |
| 2008 Q3 | 116M | 24M | 8M | $0.21 | $0.17 – $0.25 | 9 |
| 2008 Q4 | 29M | -2M | -15M | $-0.05 | $-0.05 – $-0.05 | 12 |
| 2009 Q1 | 70M | 25M | 7M | $0.08 | $0.06 – $0.10 | 7 |
| 2009 Q2 | 132M | 40M | 12M | $0.22 | $0.18 – $0.26 | 19 |
| 2009 Q3 | 125M | 49M | 18M | $0.22 | $0.18 – $0.26 | 8 |
| 2009 Q4 | 174M | 72M | 31M | $0.39 | $0.31 – $0.47 | 18 |
| 2010 Q1 | 181M | 55M | 24M | $0.30 | $0.24 – $0.36 | 7 |
| 2010 Q2 | 204M | 56M | 23M | $0.29 | $0.23 – $0.35 | 15 |
| 2010 Q3 | 158M | 64M | 28M | $0.24 | $0.19 – $0.29 | 12 |
| 2010 Q4 | 208M | 95M | 51M | $0.49 | $0.39 – $0.59 | 12 |
| 2011 Q1 | 178M | 145M | 86M | $0.52 | $0.42 – $0.62 | 19 |
| 2011 Q2 | 245M | 194M | 119M | $0.79 | $0.63 – $0.95 | 8 |
| 2011 Q3 | 410M | 121M | 69M | $1.03 | $0.82 – $1.23 | 16 |
| 2011 Q4 | 178M | 137M | 77M | $0.41 | $0.33 – $0.49 | 19 |
| 2012 Q1 | 181M | 75M | 37M | $0.34 | $0.27 – $0.41 | 11 |
| 2012 Q2 | 584M | 121M | 65M | $0.48 | $0.38 – $0.57 | 11 |
| 2012 Q3 | 332M | 72M | 28M | $0.41 | $0.33 – $0.49 | 20 |
| 2012 Q4 | 254M | 6M | -30M | $0.38 | $0.30 – $0.46 | 9 |
| 2013 Q1 | 234M | 59M | 19M | $0.24 | $0.19 – $0.29 | 15 |
| 2013 Q2 | 125M | -536M | -571M | $0.15 | $0.12 – $0.18 | 17 |
| 2013 Q3 | 107M | 68M | 16M | $0.04 | $0.04 – $0.05 | 9 |
| 2013 Q4 | 1.7B | -2.6B | -2.6B | $0.63 | $0.50 – $0.76 | 9 |
| 2014 Q1 | 105M | 50M | 8M | $0.03 | $0.03 – $0.04 | 18 |
| 2014 Q2 | 602M | 33M | -8M | $0.05 | $0.04 – $0.06 | 10 |
| 2014 Q3 | 40M | -84M | -118M | $0.12 | $0.09 – $0.14 | 17 |
| 2014 Q4 | 47M | -672M | -711M | $-0.05 | $-0.06 – $-0.04 | 14 |
| 2015 Q1 | 142M | 27M | -14M | $-0.05 | $-0.06 – $-0.04 | 18 |
| 2015 Q2 | 224M | 29M | -9M | $-0.11 | $-0.13 – $-0.09 | 9 |
| 2015 Q3 | 319M | -54M | -91M | $-0.16 | $-0.19 – $-0.13 | 17 |
| 2015 Q4 | 122M | -51M | -89M | $-0.06 | $-0.07 – $-0.05 | 16 |
| 2016 Q1 | 396M | 35M | 4M | $-0.11 | $-0.13 – $-0.09 | 13 |
| 2016 Q2 | 44M | — | 71M | $0.06 | $0.05 – $0.08 | 20 |
| 2016 Q3 | 165M | 75M | 28M | $0.11 | $0.09 – $0.13 | 14 |
| 2016 Q4 | 148M | 47M | 16M | $0.10 | $0.08 – $0.12 | 13 |
| 2017 Q1 | 298M | 68M | 26M | $0.12 | $0.10 – $0.14 | 15 |
| 2017 Q2 | 166M | 71M | 28M | $0.07 | $0.06 – $0.09 | 20 |
| 2017 Q3 | 165M | 51M | 15M | $0.11 | $0.09 – $0.13 | 15 |
| 2017 Q4 | 313M | 126M | 62M | $0.23 | $0.18 – $0.28 | 9 |
| 2018 Q1 | 166M | 87M | 36M | $0.12 | $0.10 – $0.14 | 17 |
| 2018 Q2 | 191M | 83M | 31M | $0.12 | $0.10 – $0.15 | 8 |
| 2018 Q3 | 313M | 16M | -22M | $0.12 | $0.09 – $0.14 | 7 |
| 2019 Q1 | 241M | 79M | 18M | $0.01 | $0.01 – $0.01 | 11 |
| 2019 Q2 | 331M | 81M | 12M | $0.03 | $0.03 – $0.04 | 8 |
| 2019 Q3 | 333M | 148M | 45M | $0.12 | $0.10 – $0.14 | 8 |
| 2019 Q4 | 412M | 107M | 12M | $0.24 | $0.21 – $0.30 | 15 |
| 2020 Q1 | 369M | -77M | -160M | $0.13 | $0.12 – $0.16 | 10 |
| 2020 Q2 | 216M | 134M | 48M | $0.00 | $0.00 – $0.00 | 7 |
| 2020 Q3 | 399M | 162M | 73M | $0.38 | $0.34 – $0.47 | 7 |
| 2020 Q4 | 431M | 254M | 119M | $0.41 | $0.37 – $0.50 | 14 |
| 2021 Q1 | 434M | 66M | -11M | $0.26 | $0.23 – $0.32 | 10 |
| 2021 Q2 | 451M | 207M | 95M | $0.35 | $0.31 – $0.43 | 5 |
| 2021 Q3 | 448M | 126M | 27M | $0.33 | $0.30 – $0.41 | 4 |
| 2021 Q4 | 445M | 103M | 17M | $0.26 | $0.23 – $0.32 | 4 |
| 2022 Q1 | 439M | 236M | 103M | $0.22 | $0.20 – $0.27 | 5 |
| 2022 Q2 | 419M | 227M | 104M | $0.15 | $0.13 – $0.18 | 3 |
| 2022 Q3 | 336M | 123M | 30M | $-0.07 | $-0.08 – $-0.06 | 3 |
| 2022 Q4 | 389M | 110M | 19M | $0.04 | $0.04 – $0.05 | 3 |
| 2023 Q1 | 362M | 241M | 113M | $0.02 | $0.02 – $0.03 | 2 |
| 2023 Q2 | 642M | 317M | 114M | $0.07 | $0.06 – $0.09 | 2 |
| 2023 Q3 | 662M | 202M | 33M | $0.06 | $0.02 – $0.11 | 7 |
| 2023 Q4 | 614M | 169M | 21M | $0.09 | $0.05 – $0.16 | 7 |
| 2024 Q1 | 598M | 318M | 125M | $-0.06 | $-0.12 – $-0.02 | 8 |
| 2024 Q2 | 695M | 231M | 62M | $0.15 | $0.12 – $0.19 | 6 |
| 2024 Q3 | 723M | 266M | 84M | $0.20 | $0.17 – $0.25 | 2 |
| 2024 Q4 | 783M | 417M | 147M | $0.35 | $0.33 – $0.40 | 7 |
| 2025 Q1 | 674M | 247M | 79M | $0.19 | $0.13 – $0.24 | 7 |
| 2025 Q2 | 778M | 381M | 168M | $0.41 | $0.37 – $0.43 | 6 |
| 2025 Q3 | 861M | 430M | 203M | $0.49 | $0.39 – $0.62 | 9 |
| 2025 Q4 | 1.1B | 697M | 371M | $0.89 | $0.79 – $0.98 | 8 |
| 2026 Q1 | 1.2B | 765M | 432M | $1.04 | $0.92 – $1.14 | 8 |
| 2026 Q2 | 1.1B | 655M | 356M | $0.86 | $0.62 – $0.95 | 9 |
| 2026 Q3 | 1.1B | 538M | 271M | $0.65 | $0.58 – $0.68 | 7 |
| 2026 Q4 | 1.0B | 595M | 313M | $0.75 | $0.57 – $0.96 | 6 |
| 2027 Q1 | 1.2B | 801M | 453M | $1.09 | $0.78 – $1.74 | 4 |
| 2027 Q2 | 1.2B | 833M | 473M | $1.14 | $1.05 – $1.27 | 1 |
| 2027 Q3 | 1.3B | 869M | 497M | $1.20 | $1.10 – $1.33 | 1 |
| 2027 Q4 | 1.3B | 871M | 496M | $1.20 | $1.10 – $1.33 | 1 |
| 2028 Q1 | 1.1B | 870M | 494M | $1.19 | $1.10 – $1.32 | 2 |
| 2028 Q2 | 1.1B | 799M | 444M | $1.07 | $0.99 – $1.19 | 2 |
| 2028 Q3 | 1.1B | 921M | 528M | $1.27 | $1.17 – $1.41 | 2 |
| 2028 Q4 | 1.0B | 765M | 420M | $1.01 | $0.93 – $1.12 | 2 |
| 2029 Q1 | 1.7B | 641M | 331M | $0.80 | $0.73 – $0.89 | 1 |
v2 analysis (legacy, 2026-08-16) — for comparison onlyclick to expand
Thesis
Pan American has materially improved its operating and financial profile through the Juanicipio acquisition, high precious-metal prices and strong cash conversion. TTM revenue is $4.0B, adjusted EBITDA is $2.0B and adjusted FCF is $1.4B, while the company holds approximately $1.6B of cash and short-term investments against debt and leases of roughly $845M. This is a high-quality balance sheet for a cyclical miner, and the announced shareholder-return framework is a meaningful positive. The central issue is durability. Current margins are extraordinary and should not be capitalized as permanent. The portfolio remains exposed to mine sequencing, seismicity at Jacobina, weaker gold continuity at El Peñón, rising taxes and royalties, and the substantial capital requirements of La Colorada. Escobal is option value only, not a near-term operating assumption. Juanicipio is a major asset, but its eventual deeper geological transition toward more base-metal-heavy ore introduces longer-term grade and mix risk. The Q2 event was modestly positive overall: silver production and cash returns were strong, but the gold outlook moved to the low end and management disclosed operational uncertainty at Jacobina and El Peñón. The likely trajectory remains improving to stable over the next year, with cash generation and shareholder distributions offsetting the risk of peak-cycle normalization.
Trade Signal
Short PAAS: even after the post-earnings decline, the market capitalization substantially exceeds the analyst’s probability-weighted value and still assumes unusually durable precious-metals margins.
PAAS rose from roughly $20 at the end of 2024 to $51.67 at the end of 2025 and $68.52 in late February 2026, broadly tracking the precious-metals rally and the improved earnings profile following the MAG/Juanicipio acquisition. It then fell sharply through March and June as commodity enthusiasm cooled and investors reassessed valuation, before drifting around $42–45 in July and rebounding to $52.38 ahead of earnings. The stock fell about 10% from $52.38 to $47.30 after the August 13 report despite robust Q2 cash flow, reflecting the gold shortfall, Jacobina and El Peñón concerns, higher tax guidance and peak-margin skepticism. The move from the peak is largely a justified repricing rather than panic; at most, the post-earnings decline slightly overshot the strong cash-flow facts, but not enough to create a compelling long dislocation.
The stock is still broadly loved: analysts rate it a consensus Buy, the average target is well above the current price, and short interest has collapsed from roughly 4% of float to 1.1%. The market recognizes strong silver exposure, Juanicipio, high cash conversion and shareholder returns. The recent fall from the February high and the 10% post-earnings gap indicate some digestion of the gold miss, Jacobina seismic issues, El Peñón reserve uncertainty and higher taxes, but positioning is not yet consistent with a hated or abandoned stock. The consensus appears stale on cyclicality and peak-margin risk.
There is no clear positive earnings inflection that the market has missed. Q2 production and free cash flow were strong, and H2 gold improvement is already expected, while consensus analysts remain constructive with a $64.89 average target. The more probable medium-term inflection is toward normalized margins as metal prices, grades and mine execution revert. Juanicipio remains a major asset, but the documented deeper-zone grade transition weakens the durability of its precious-metals premium.
- ▲2026-09 · Midyear reserve and resource update — Expected in early September; confirmation that El Peñón’s removed gold ounces are replaceable and Jacobina reserves remain intact would reduce operating concerns.
- ▼2026-11 · Q3 2026 earnings and production report — Gold production should improve sequentially, but the print will test whether extraordinary margins and cash generation are sustainable after the Q2 gold miss and higher taxes.
- ▼H2 2026 · Escobal consultation update — Further evidence of delay or continued opposition would reinforce that the idle Guatemalan asset has little near-term value.
- ▼H2 2026–2027 · La Colorada Skarn development and capital updates — Progress validates long-term growth, but additional spending and execution risk could expose the large capital commitment embedded in the bull case.
- ▼Next 6–12 months · Silver and gold price normalization — The valuation relies heavily on unusually strong commodity margins; any pullback would compress earnings and the appropriate multiple quickly.
The company returned about $300 million to shareholders in Q2 and has repurchased more than 7 million shares in 2026, with a stated 35%–40% cash-distribution framework. That is supportive, but the reported 16% TTM dilution—likely influenced by the MAG acquisition and equity issuance—more than offsets the buyback signal on a trailing basis. Low short interest of 1.1% of float provides little squeeze fuel, while passive ownership and some active-holder reductions are not strong incremental demand.
The approximately $1.6 billion cash and short-term investment balance, strong current free cash flow and long reserve lives provide meaningful fundamental support, but not a hard floor near $47. Cash is partly offset by debt, leases, taxes, sustaining capital and the $1.9 billion La Colorada Skarn commitment. The effective ceiling is more important: current valuation already discounts very strong commodity prices, continued Juanicipio performance and successful execution, while cyclical-margin normalization could drive substantial downside.
PAAS is highly liquid and institutionally owned, with genuine appeal as a large silver/gold producer offering dividends, buybacks and strong current cash generation. However, at roughly 14x FCF and nearly 5x sales, it is difficult for a marginal buyer to justify the stock unless precious-metal prices remain near exceptionally strong levels.
Fear is stronger than greed at $47. The business is high quality for a cyclical miner and the balance sheet is sound, but the price capitalizes near-peak margins and optimistic commodity assumptions while the analyst’s base and bull cases both remain below today’s market capitalization.
Valuation
The quarter newly showed that silver production remains at the high end of guidance and that shareholder distributions are running ahead of plan, but it also exposed more specific operational risks: gold is now expected at the low end of guidance, Jacobina's seismic mitigation reduces 2026 output, El Peñón lost some lower-continuity gold structures from reserves, and cash-tax guidance increased. Management gave no Escobal restart timetable and has not yet quantified the additional capital required for Jacobina optimization.
▸ How the cases moved
Relative to the day before the Q2 release, the bear case rises modestly from approximately $4,200M to $4,369M because liquidity, shareholder returns and silver execution were stronger than feared, but its probability increases from 0.22 to 0.25 because Jacobina seismicity, the El Peñón gold-reserve issue and higher taxes make downside more tangible. The base case moves from approximately $9,800M to $10,119M: strong silver production, cash generation and capital returns offset lower gold guidance and higher tax/royalty burdens; its probability falls from 0.58 to 0.55. The bull case moves only from approximately $16,200M to $16,369M, with probability unchanged at 0.20 because the upside remains dependent on metal prices and mine execution rather than a new near-term catalyst.
Silver and gold prices retreat toward mid-cycle levels, while Jacobina and El Peñón experience more persistent production and grade issues. Escobal remains idle and La Colorada consumes capital without producing near-term cash flow. Margins normalize sharply, but the substantial net cash position prevents balance-sheet distress.
▸ Valuation
4x $900M EBITDA = $3,600M EV − (-$769M net debt) = $4,369M equity
Juanicipio supports sustained high silver production, with 2026 guidance broadly achieved and gold recovering somewhat in the second half. Metal prices remain favorable but below the recent peak, taxes and royalties rise, and sustaining and project capital remain significant. Jacobina's seismic mitigation proves manageable, while Escobal contributes no value within the period.
▸ Valuation
5.5x $1,700M EBITDA = $9,350M EV − (-$769M net debt) = $10,119M equity
Precious-metal prices remain exceptionally strong, Juanicipio continues delivering high margins, and Pan American meets or exceeds its silver growth plan. Gold production improves in the second half, Jacobina's deferred pillars are recovered, and La Colorada advances with a credible lower-capital development path. Strong cash returns and net cash support a premium valuation, although Escobal still does not restart materially within two years.
▸ Valuation
6x $2,600M EBITDA = $15,600M EV − (-$769M net debt) = $16,369M equity
▸ Target Rationale
The probability-weighted scenario value discounts to $7,945M today at 12%. I set the analytical target at $7,600M because the arithmetic still gives substantial credit to unusually strong commodity margins and assumes relatively favorable mine execution. A lower target better reflects the cyclicality of silver and gold prices, uncertain Jacobina and El Peñón outcomes, La Colorada's large capital commitment, and the fact that Escobal has no dependable restart timetable. The net-cash balance and high recent cash conversion prevent a much steeper haircut.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial and Operating Results: In May 2026, Pan American Silver reported robust results for Q1 2026, with revenues reaching $1.2 billion ($1.3 billion on an attributable basis), representing a nearly 50% year-over-year surge. Strong operational performance and elevated metal prices drove a record cash balance, while silver segment all-in sustaining costs (AISC) fell sharply to $6.63 per ounce, significantly expanding operating margins.
- Revised La Colorada Skarn PEA: On March 24, 2026, the company announced a Revised Preliminary Economic Assessment (Revised PEA) for the La Colorada property in Mexico. The revised PEA envisions an integrated development combining newly identified high-grade veins in the eastern Candelaria area of the existing mine with higher-grade portions of the skarn deposit. Operating with a 15,000 tonnes-per-day (tpd) processing plant, the project is modeled with a 37-year mine life, projecting peak silver production averaging 19.1 million ounces annually at negative AISC of -$22.67 per ounce. Pre-production capital was optimized down to $1.9 billion, down nearly a third from the $2.8 billion estimated in 2023.
- Capital Allocation and Shareholder Returns: Bolstered by strong cash generation, Pan American Silver announced an enhanced shareholder return framework in May 2026 targeting up to $1.0 billion in returns for 2026 through dividends and share buybacks. Simultaneously, the Board approved $265.1 million of project capital over five years for the first-phase underground access ramp at the La Colorada Skarn, raising the mine's 2026 project capital guidance to $92–95 million (up from $47–50 million).
- Full-Year 2026 Production Guidance: Pan American Silver has guided for full-year 2026 attributable silver production of 25.0 to 27.0 million ounces (up 14% at the midpoint year-over-year) and gold production of 700 to 750 thousand ounces.
- Integration of MAG Silver: The company's performance continues to benefit from its acquisition of MAG Silver Corp. in September 2025, which added a 44% joint venture interest in the high-grade, tier-one Juanicipio silver mine operated by Fresnillo. For 2026, Juanicipio is expected to contribute 6.0 to 6.5 million ounces of silver to Pan American's consolidated production.
▸ Thesis-test Findings
Juanicipio Silver Grade Geological Transition
The Valdecañas and Juanicipio vein systems exhibit vertical grade zonation typical of epithermal veins in the Fresnillo District. Geological data and infill drilling confirm a transition from an upper precious-metal-rich zone (the "Bonanza Grade Silver Zone") to a deeper, base-metal-dominant zone rich in lead, zinc, and eventually copper. While drilling at depth has significantly expanded the overall resource, it has simultaneously confirmed a reduction in precious metal head grades in exchange for higher base metal concentrations (deep zone infill drilling showed zinc and lead grades increasing by 36% and 17% respectively). For the investment thesis, this geological reality indicates that as mining moves deeper, Juanicipio's margins and its status as a pure-play precious metals asset may be altered, transitioning from a primary silver/gold producer to a heavy base-metals producer with silver as a byproduct.
Escobal Mine Guatemala ILO 169 Consultation Progress
The Escobal silver mine in Guatemala, on care and maintenance since 2017, remains stalled in 2026 with no clear timeline for a restart. The Guatemalan Constitutional Court mandated that the country's Ministry of Energy and Mines (MEM) must carry out an ILO 169 consultation with the Xinka Indigenous Peoples before reinstating the operating license. In May 2025, the Xinka Parliament formally denied its consent for the mine's restart, citing risks to water, culture, and territory. Throughout late 2025 and into mid-2026, MEM has held working meetings, but no target date or schedule for completion has been set. Public opposition remains fierce, with local and international activist groups actively campaigning for the permanent closure of the mine. This ongoing gridlock supports the bear case, demonstrating that a near- or medium-term resumption of operations at Escobal is highly unlikely.
La Colorada Skarn Joint Venture Partnership Negotiations
The revised PEA for the La Colorada Skarn project announced in March 2026 marks a major strategic pivot in the company's development and financing strategy. Rather than advancing a massive standalone 50,000 tpd project that would necessitate a corporate joint venture partner to finance, Pan American has transitioned to a leaner, phased 15,000 tpd integrated mine plan. This shift reduces initial capital to $1.9 billion, enabling the company to fund development entirely from internal operating cash flows and removing the immediate need for a corporate project partner. Although the company continues negotiating land leases (ejidos) and previously negotiated JV terms for utilizing certain adjacent concessions, the core development of the La Colorada Skarn is now planned to remain 100% owned. This reframes the capital allocation thesis as a self-funded, lower-risk growth story.